Pages that link to "RIS 2020-01"
Jump to navigation
Jump to search
The following pages link to RIS 2020-01:
Displayed 50 items.
- RIS 1999-04, Sources of Information Previously Published in the AEOD Annual Report (← links)
- RIS 2002-22, Summary of Comments on 2018-01-24 Draft Ris Ks R1 from Ken Scarola Nuclear Automation Engineering (← links)
- RIS 1999-06, Voluntary Submission of Performance Indicator Data (← links)
- RIS 2017-05, Administration of 10 CFR Part 72 Certificate of Compliance Corrections and Revisions (← links)
- RIS 2017-02, Applicability of Title 10 of the Code of Federal Regulations Part 37 to Non-Manufacturing and Distribution Service Provider Licensees (← links)
- RIS 2005-31, Rev. 1, Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the Use of Source Byproduct, & SNM (← links)
- RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities (← links)
- RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors (← links)
- RIS 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees (← links)
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use (← links)
- RIS 2015-11, Protective Action Recommendations for Members of the Public on Bodies of Water (← links)
- RIS 2014-08, Regulatory Requirements for Transfer of Control (Change of Ownership) of Specific Materials Licensees (← links)
- RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators (← links)
- RIS 2016-06, NRC Regulation of Radium-226 Under Military Control and For Coordination on CERCLA Response Actions at Dod Sites With Radioactive Materials. (← links)
- RIS 2016-05, Embedded Digital Devices in Safety-Related Systems (← links)
- RIS 2005-20, Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded Or Nonconforming Conditions Adverse To Quality or Safety (← links)
- RIS 2015-15, Information Regarding a Specific Exemption in the Requirements for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material (← links)
- RIS 2015-10, Applicability of ASME Code Case N-770-1 As Conditioned in 10 CFR 50.55A, Codes and Standards, to Branch Connection Butt Welds (← links)
- RIS 2015-05, Withdrawn NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2015-08, Oversight of Counterfeit, Fraudulent, and Suspect Items in the Nuclear Industry (← links)
- RIS 2014-13, Withdrawn NRC Regulatory Issue Summary 2014-13, Planned Licensing Action Submittal for All Power Reactor Licensees (← links)
- RIS 2015-02, Reporting of H-3, C-14, Tc-99, and I-129 on the Uniform Waste Manifest (← links)
- RIS 2015-04, Withdrawal of Administrative Letter 93-01 (← links)
- RIS 2015-03, Identifying and Reporting Security Incidents Under 10 CFR Part 37 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 4 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 3 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 2 of 5 (← links)
- RIS 2014-07, Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program- Vendor Information Request. Part 1 of 5 (← links)
- RIS 2014-12, Decommissioning Fund Status Report Calculations - Update to Low-Level Waste Burial Charge Information (← links)
- RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148) (← links)
- RIS 2014-10, Requirements for Exempt Distribution Licensee Annual Transfer Reports (← links)
- RIS 2014-04, National Source Tracking System Long-Term Storage Indicator (← links)
- RIS 2002-12D, Independent Spent Fuel Storage Installations Using Dry Storage NRC Threat Advisory and Protective Measures System (← links)
- RIS 2014-03, Withdrawn - NRC Regulatory Issue Summary 2014-03, Notice of 10 CFR Part 37 Implementation Deadline for NRC Licensees (← links)
- RIS 2014-01, Regulatory Requirements for Withholding of Proprietary Information from Public Disclosure (← links)
- RIS 2002-12, NRC Regulatory Issue Summary 2002-12l Revision 1 Panoramic And Underwater Irradiators (← links)
- RIS 2013-18, Withdrawn NRC Regulatory Issue Summary 2013-18 Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)
- RIS 2013-14, Reporting Transactions Involving Temporary Jobsites to the National Source Tracking System (← links)
- RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines For Effective Prevention and Management of System Gas Accumulation (← links)
- RIS 2014-06, Consideration of Current Operating Issues and Licensing Actions in License Renewal (← links)
- RIS 2013-12, Notice of Issuance of Enforcement Guidance Memo-Interim Guidance for Dispositioning Violations Involving 10 CFR 35.60 & 10 CFR 35.63 for the Calibration of Instrumentation to Measure the Activity of Rb-82 and the Determ. of Rb-82 Pt Dosa (← links)
- RIS 2013-06, Withdrawn NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing Examinations (← links)
- RIS 2013-11, Fuel Assembly Resolution of Top Nozzle Stress Corrosion Cracking Handling for Dry Cask Spent Fuel Storage and Transportation (← links)
- RIS 2013-03, Pre-Application Communication and Scheduling for Medical Radioisotope Production Facilities Intending to Produce Molybdenum-99 (← links)
- RIS 2013-08, Withdrawn RIS 2013-08, Process for Scheduling Acceptance Reviews of New Reactor Licensing and Design Certification Applications and Process for Determining Budget Needs for Fiscal Year 2016 (← links)
- RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability (← links)
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages (← links)
- RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark (← links)
- RIS 2012-12, Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs (← links)