IR 05000324/2015403
| ML15140A397 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/19/2015 |
| From: | Binoy Desai Division of Reactor Safety III |
| To: | Brittain A Progress Energy Carolinas |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 2015403 | |
| Download: ML15140A397 (4) | |
Text
May 19, 2015
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000324/2015403 AND 05000325/2015403
Dear Mr. Brittain:
On May 7, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Brunswick Steam Electric Plant. The NRC inspectors discussed the results of this inspection with Mr. J. Krakuszeski, and other members of the Brunswick staff. The inspectors documented the results in the enclosed inspection report (IR).
No NRC-identified or self-revealing findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-324 and 50-325 License Nos. DPR-62 and DPR-71
Enclosure:
IR 05000324/2015403 and 05000325/2015403 w/Attachment: Supplementary Info (OUO)
cc: (See page 3)
ML15140A397 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR62 RII:DRS/ PSB2
SIGNATURE ICH JDG4 GTH1 BBD
NAME I.Hall D. Golden G. Hopper B. Desai
DATE 5/ 19 /2015 5/ 19 /2015 5/ 19 /2015 5/ 19 /2015
E-MAIL COPY YES NO YES NO YES NO YES NO cc:
Lee Grzeck Manager - Regulatory Affairs Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429
Mr. Edward T. ONeil Director Nuclear Protective Services Duke Energy Corporation 526 South Church Street Charlotte, NC 28202