| Title | 13 Switchgear and Penetration Area Ventilation Supply Fan Motor Bearing Failure due to Deletion of Preventative Maintenance Requirement |
| Description | A self-revealing Green NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures and Drawings, was identified because PSEG did not complete a change to a preventative maintenance requirement for the Switchgear and Penetration Area Ventilation (SPAV) fan motors in accordance with PSEG procedure MA-AA-716-210-1005, Predefine Change Processing. PSEG failed to perform an adequate engineering review of the Preventative Maintenance Change Request (PMCR) when bearing replacements were deleted from the SPAV fan motor maintenance plans in September, 2009. This resulted in the bearing not being lubricated and subsequent failure of the 13 SPAV supply fan motor on February 4, 2013. PSEG entered the issue into the corrective action program as notification 20594424. The inspectors determined that the performance deficiency was more than minor because it was associated with the design control attribute of the Mitigating Systems cornerstone, and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, because PSEG failed to investigate a difference in bearing type documented in a 1998 NRC commitment letter and the SPAV fan motor material master, they did not resolve conflicting information on the type of bearing installed in the SPAV fan motors before a preventive maintenance change to delete periodic bearing replacements took effect. This resulted in bearing and fan motor failure. The inspectors evaluated the finding in accordance with IMC 0609, Appendix A, Determining the Significance of Reactor Inspection Findings for At-Power Situations (IMC 0609A). The inspectors determined that the finding was of very low safety significance (Green) because the deficiency did not affect the design or qualification; did not represent a loss of system safety function; did not screen as potentially risk significant due to external initiating events; and SPAV fans are not designated as high safety-significance in the licensees maintenance rule program. There is no cross-cutting aspect assigned because the performance deficiency is not indicative of current performance. Specifically, the performance deficiency involves an issue that occurred greater than three years ago and is not indicative of current performance. |
| Site: | Salem |
|---|---|
| Report | IR 05000272/2013008 Section 4OA2 |
| Date counted | Sep 30, 2013 (2013Q3) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71152 |
| Inspectors (proximate) | G Dentel P Mckenna J Deboer S Galbreath |
| Violation of: | 10 CFR 50 Appendix B Criterion V |
| INPO aspect | |
| ' | |
Finding - Salem - IR 05000272/2013008 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Salem) @ 2013Q3