UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 4, 2009
Mr. Peter P. Sena, III
Site Vice President
FirstEnergy Nuclear Operating Company
Beaver Valley Power Station
Mail Stop A-BV-SEB1
P. O. Box 4, Box 168
Shippingport, PA 15077
SUBJECT: ANNUAL ASSESSMENT LETTER - BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORT 05000334/2009001 and 05000412/2009001)
Dear Mr. Sena:
On February 9, 2009, the NRC staff completed its performance review of Beaver Valley Power
Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most
recent quarter and inspection results for the period January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this
period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only - Security Information" will include
the security cornerstone review and resultant inspection plan.
Overall, Beaver Valley Units 1 and 2 operated in a manner that preserved public health and
safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee
Response column of the NRC's Action Matrix, based on all inspection findings being classified
as having very low safety significance (Green) and all PIs indicating performance at a level
requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight
process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of
any scheduling conflicts and personnel availability issues well in advance of inspector arrival
onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised
at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Avail able Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any
questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/
Ronald R. Bellamy, Ph.D., Chief
Reactor Projects Branch 6
Division of Reactor Projects
Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73
Enclosure:
Beaver Valley Units 1 and 2 Inspection/ Activity Plan
cc w/encl: J. Hagan, President and Chief Nuclear Officer
J. Lash, Senior Vice President of Operations and Chief Operating Officer
D. Pace, Senior Vice President, Fleet Engineering
K. Fili, Vice President, Fleet Oversight
P. Harden, Vice President, Nuclear Support
G. Halnon, Director, Fleet Regulatory Affairs
Manager, Fleet Licensing Company
K. Ostrowski, Director, Site Operations
C. McFeaters, Director, Maintenance
M. Manoleras, Director, Engineering
R. Brosi, Director, Site Performance Improvement
C. Keller, Manager, Site Regulatory Compliance
D. Jenkins, Attorney, FirstEnergy Corporation
M. Clancy, Mayor, Shippingport, PA
D. Allard, Director, PADEP
C. O'Claire, State Liaison to the NRC, State of Ohio
Z. Clayton, EPA-DERR, State of Ohio
Director, Utilities Department, Public Utilities Commission, State of Ohio
D. Hill, Chief, Radiological Health Program, State of West Virginia
J. Lewis, Commissioner, Division of Labor, State of West Virginia
W. Hill, Beaver County Emergency Management Agency
J. Johnsrud, National Energy Committee, Sierra Club
J. Powers, Director, PA Office of Homeland Security
R. French, Director, PA Emergency Management Agency
Institute of Nuclear Power Operations (INPO)