Annual Assessment Letter - Beaver Valley Power Station Units 1 and 2 (05000334/2009001 and 05000412/2009001)
ML090620768
Person / Time
Site: Beaver Valley
Issue date: 03/04/2009
From: Bellamy R R
NRC/RGN-I/DRP/PB6
To: Sena P P
FirstEnergy Nuclear Operating Co
BURRITT, AL
References
IR-09-001
Download: ML090620768 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 4, 2009

Mr. Peter P. Sena, III

Site Vice President

FirstEnergy Nuclear Operating Company

Beaver Valley Power Station

Mail Stop A-BV-SEB1

P. O. Box 4, Box 168

Shippingport, PA 15077

SUBJECT: ANNUAL ASSESSMENT LETTER - BEAVER VALLEY POWER STATION UNITS 1 AND 2 (REPORT 05000334/2009001 and 05000412/2009001)

Dear Mr. Sena:

On February 9, 2009, the NRC staff completed its performance review of Beaver Valley Power

Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most

recent quarter and inspection results for the period January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this

period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, Beaver Valley Units 1 and 2 operated in a manner that preserved public health and

safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee

Response column of the NRC's Action Matrix, based on all inspection findings being classified

as having very low safety significance (Green) and all PIs indicating performance at a level

requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight

process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of

any scheduling conflicts and personnel availability issues well in advance of inspector arrival

onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last nine months of the inspection plan are tentative and may be revised

at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Avail able Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5200 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/

Ronald R. Bellamy, Ph.D., Chief

Reactor Projects Branch 6

Division of Reactor Projects

Docket Nos.: 50-334, 50-412 License Nos: DPR-66, NPF-73

Enclosure:

Beaver Valley Units 1 and 2 Inspection/ Activity Plan

cc w/encl: J. Hagan, President and Chief Nuclear Officer

J. Lash, Senior Vice President of Operations and Chief Operating Officer

D. Pace, Senior Vice President, Fleet Engineering

K. Fili, Vice President, Fleet Oversight

P. Harden, Vice President, Nuclear Support

G. Halnon, Director, Fleet Regulatory Affairs

Manager, Fleet Licensing Company

K. Ostrowski, Director, Site Operations

C. McFeaters, Director, Maintenance

M. Manoleras, Director, Engineering

R. Brosi, Director, Site Performance Improvement

C. Keller, Manager, Site Regulatory Compliance

D. Jenkins, Attorney, FirstEnergy Corporation

M. Clancy, Mayor, Shippingport, PA

D. Allard, Director, PADEP

C. O'Claire, State Liaison to the NRC, State of Ohio

Z. Clayton, EPA-DERR, State of Ohio

Director, Utilities Department, Public Utilities Commission, State of Ohio

D. Hill, Chief, Radiological Health Program, State of West Virginia

J. Lewis, Commissioner, Division of Labor, State of West Virginia

W. Hill, Beaver County Emergency Management Agency

J. Johnsrud, National Energy Committee, Sierra Club

J. Powers, Director, PA Office of Homeland Security

R. French, Director, PA Emergency Management Agency

Institute of Nuclear Power Operations (INPO)