Annual Assessment Letter and Inspection Plan - 2008 - Waterford Steam Electric Station (NRC Inspection Report 05000382/2009001)
ML090630327
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/04/2009
From: Clark J A
NRC/RGN-IV/DRP/RPB-E
To: Walsh K T
Entergy Operations
References
IR-09-001
Download: ML090630327 (7)


Text

March 4, 2009

Kevin Vice President Operations

Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

17265 River Rd.

Killona, AR 70057-3093

SUBJECT: ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000382/2009001)

Dear Mr. Walsh:

On February 10, 2009, the NRC staff completed its performance review of Waterford Steam Electric Station, Unit 3. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Waterford Steam Electric Station, Unit 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through June 30, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Entergy Operations, Inc. - 2 - If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8147 with any questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/ Jeffrey A. Clark, P.E. Chief, Reactor Projects Branch E Division of Reactor Projects Docket No. 50-382 License No. NPF-38

Enclosure:

Waterford 3 Inspection/Activity Plan cc w/

Enclosure:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Vice President and Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995 Jackson, MS 39286-1995

Vice President, Operations Support

Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Senior Manager, Nuclear Safety

and Licensing

Entergy Services, Inc. P.O. Box 31995 Jackson, MS 39286-1995

Site Vice President

Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

General Manager, Plant Operations

Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Manager, Licensing Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154

Parish President Council

St. Charles Parish P.O. Box 302

Hahnville, LA 70057 Director, Nuclear Safety & Licensing Entergy, Operations, Inc.

440 Hamilton Avenue

White Plains, NY 10601 Entergy Operations, Inc. - 3 - Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P.O. Box 4312

Baton Rouge, LA 70821-4312 Federal Emergency Management Agency ATTN: William E. Peterson, Regional

Director Region VI FRC 800 North Loop 288 Denton, TX 76209-3698 Col. Jeff Smith, Acting Director Louisiana Office of Homeland Security and Emergency Preparedness 7667 Independence Blvd.

Baton Rouge, LA 70806

Jeffrey P. Meyers, Division Administrator Emergency and Radiological Services Division Louisiana Department of Environmental

Quality P.O. Box 4312

Baton Rouge, LA 70821-4312 Albert D. Laque, Parish President

St. Charles Parish P.O. Box 302

Hahnville, LA 70057

Sheriff Greg Champagne St. Charles Parish Sheriff

=s Office P.O. Box 7 Hahnville, LA 70057

Rep. Gary L. Smith, Jr.

State of Louisiana, District 56 P.O. Box 189 Norco, LA 70079

Rep. Ernest D. Wooten State of Louisiana, District 105

8018 Highway 23, Suite 214

Belle Chasse, LA 70037 Senator Joel T. Chaisson, II State of Louisiana, District 19 P.O. Box 1255

Destrehan, LA 70047

Tab Troxler, Director St. Charles Parish Department of Emergency Preparedness P.O. Box 302

Hahnville, LA 70057

Lance Marino, Councilman-at-Large St. Charles Parish Division A

660 Pine Street

Norco, LA 70079

Clayton "Snookie" Faucheux Councilman-at-Large St. Charles Parish Division B

140 North Oak Court P.O. Box 1342 Luling, LA 70070 Desmond J. Hilaire, Councilman St. Charles Parish District 1 P.O. Box 111

Hahnville, LA 70057 Brian A. Fabre, Councilman St. Charles Parish District 2

322 Beaupre Drive Luling, LA 70070

G. ARam@ Ramchandran, Councilman St. Charles Parish District 3 13 Hermitage Court Destrehan, LA 70047

Derryl Walls, Councilman St. Charles Parish District 4 P.O. Box 721 Des Allemands, LA 70030

April Black, Councilwoman St. Charles Parish District 5 162 Oak Manor Lane

St. Rose, LA 70087

Entergy Operations, Inc. - 4 - Richard A Dickie@ Duhe, Councilman St. Charles Parish District 6 401 Oak Street Norco, LA 70079

Barry Minnich, Councilman St. Charles Parish District 7

337 Wanda Street Luling, LA 70070 Nickie Monica, Parish President St. John the Baptist Parish Paul Oncale, Public Safety Director Paul Oncale, Public Safety Director St. John the Baptist Parish

1801 W. Airline Highway

LaPlace, LA 70068

Sheriff Wayne Jones St. John the Baptist Parish P.O. Box 1600

Chief, Technological Hazards

Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209

Entergy Operations, Inc. - 5 - Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV) DRP Director (Roy.Caniano@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ray Azua@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Douglas.Bollock@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov) Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov) Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Bernard.Stapleton@nrc.gov) OEDO RIV Coordinator, Primary (Shawn.Williams@nrc.gov) OEDO RIV Coordinator, Backup (Eugene.Guthrie@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov) Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov) Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Fred.Lyon@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov

mortensengk@INPO.org

File located:R:\_REACTORS\EOC\EOC Assessment Letters\2008\WAT.doc SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials DRB Publicly Avail Yes No Sensitive Yes No Sens. Type Initials DRB RIV/SPE/DRP/ C:DRP/E D:DRS D:DRP C:DRP/Signature DRBollock JAClark RJCaniano DDChamberlain JAClark /RA/ /RA/ /RA/ /RA/ /RA/ 2/20/2009 2/20/2009 2/20/2009 2/23/2009 3/2/2009 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax Inspection / Activity Plan Page 1 of 2 02/23/2009 12:43:18 Report 22 03/01/2009

-06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Waterford RPTEAM-RADIATION SAFETY TEAM INSPECTION 4 3 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 03/02/2009 03/06/2009 3 IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 03/02/2009 03/06/2009 3 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 03/02/2009 03/06/2009 3 IP Radioactive Material Processing and Transportation 7112202 03/02/2009 03/06/2009 3 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 03/02/2009 03/06/2009 EB2-05T-TRIENNIAL FIRE PROTECTION 4 3 IP Fire Protection [Triennial]

7111105T 04/13/2009 04/17/2009 3 IP Fire Protection [Triennial]

7111105T 04/27/2009 05/01/2009 EP1-EP EXERCISE INSPECTION 4 3 IP Exercise Evaluation 7111401 06/22/2009 06/26/2009 3 IP Emergency Action Level and Emergency Plan Changes 7111404 06/22/2009 06/26/2009 3 IP Performance Indicator Verification 71151 06/22/2009 06/26/2009 REQUAL-BIENNIAL REQUAL INSPECTION 3 3 IP Licensed Operator Requalification Program 7111111B 07/13/2009 07/17/2009 EB1-21-CDBI 6 3 IP Component Design Bases Inspection 7111121 08/10/2009 08/14/2009 3 IP Component Design Bases Inspection 7111121 08/24/2009 08/28/2009 3 IP Component Design Bases Inspection 7111121 09/07/2009 09/18/2009 RP-ORS4-OCCUPATIONAL RADIATION SAFETY 1 3 IP A ccess Control to Radiologically Significant Areas 7112101 09/14/2009 09/18/2009 3 IP A LARA Planning and Controls 7112102 09/14/2009 09/18/2009 3 IP Performance Indicator Verification 71151 09/14/2009 09/18/2009 EXAM-INITIAL EXAM 3 3 INITIAL EXAM-W3 (10/2009)

X02418 09/14/2009 09/18/2009 3 INITIAL EXAM-W3 (10/2009)

X02418 10/05/2009 10/09/2009 EB1-08P-INSERVICE INSPECTION 2 3 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 11/02/2009 11/23/2009 3 IP Inservice Inspection Activities - PWR 7111108P 11/02/2009 11/23/2009 RP-ORS5-OCCUPATIONAL RADIATION SAFETY - ACCESS 1 3 IP A ccess Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 3 IP A LARA Planning and Controls 7112102 11/16/2009 11/20/2009 3 IP Performance Indicator Verification 71151 11/16/2009 11/20/2009 PSB2-52B-BIENNIAL PI&R 4 3 IP Identification and Resolution of Problems 71152B 05/10/2010 05/14/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 02/23/2009 12:43:18 Report 22 03/01/2009

-06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Waterford PSB2-52B-BIENNIAL PI&R 4 3 IP Identification and Resolution of Problems 71152B 05/24/2010 05/28/2010 EP-1-BIENNIAL EP PROGRAM INSPECTION 1 3 IP A lert and Notification System Testing 7111402 06/28/2010 07/02/2010 3 IP Emergency Response Organization Augmentation Testing 7111403 06/28/2010 07/02/2010 3 IP Emergency Action Level and Emergency Plan Changes 7111404 06/28/2010 07/02/2010 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/28/2010 07/02/2010 3 IP Drill/Exercise Performance 71151-EP01 06/28/2010 07/02/2010 3 IP ERO Drill Participation 71151-EP02 06/28/2010 07/02/2010 3 IP A lert & Notification System 71151-EP03 06/28/2010 07/02/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.