| | Title | Significance | Cross cutting aspect |
|---|
| 05000528/FIN-2009006-01 | Inadequate Operability Evaluation for Potential Emergency Diesel Generator Slow Start Issue | Green | P.2 |
| 05000528/FIN-2009006-02 | Failure to Follow Procedure for Screening Significant Condition Adverse to Quality | Green | P.2 |
| 05000528/FIN-2009006-03 | Failure to Perform 10 CFR 50.59 Screenings on Scaffolds Installed for Greater Than 90 Days | Green | H.2(a) H.6 |
| 05000528/FIN-2009006-04 | Failure to Implement Adequate Design Controls | Green | P.2 |
| 05000528/FIN-2009006-05 | Failure to Identify and Correct-Related Degradation of Safety-Related Inverters | Green | P.5 P.2(b) |
| 05000528/FIN-2009006-06 | Failure to Properly Implement Corrective Action Process for Potential Operability Issues with the Safety Related Systems and Systems Important to Safety | Green | P.2 |
| 05000528/FIN-2009006-07 | Inadequate Procedures for Performing Operability Determinations | Green | H.7 |
| 05000528/FIN-2009006-08 | Failure to Promptly Identify and Correct a Condition Adverse to Quality with the Emergency Core Cooling System Piping | Green | |
| 05000528/FIN-2009006-09 | Safety Injection Pump Full Flow Recirculation Potential Design Control Issue | | |