_TfLW4TNHItaD LAR MXM- I IUNr John Richmond From: Richard Conte, Sent: Friday, October 03, 2008 11:13 AM To: John Richmond; Kay Gallagher Cc: Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones
Subject:
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV -See john for your roles.Kay need a DRS Action Item with the following subtasks: "Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov. P-and public outreach)" JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV. '4 Outside of the scope L Outside of the scope 2. By Oct. 22, conduct briefing for inspection plan and related outreach -obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -distribute draft of quick look letter 4. By Nov. 6, conduct exit on site -BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.5. By Nov. 10 -final quick look letter -sign out within day (startup assumed to be 11/11) -note same DRS players involved in BV LR exit 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) -note same DRS players involved in BV LR exit 4.Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan " 0 From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte
Subject:
OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.
Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!2 Received:
from R1CLSTRO1 .nrc.gov ([148.184.99.7])
by R1 MS01 .nrc.gov ([148.184.99.10])
with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type:
application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding:
binary From: Richard Conte <Richard.Conte@nrc.gov>
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher<Kay.Gallagher@nrc.gov>
CC: Michael Modes <Michael.
Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>, Marsha Gamberoni
<Marsha.Gamberoni@nrc.gov>, Darrell Roberts<Darrell.
Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones<Heather.Jones@nrc.gov>
Date: Fri, 3 Oct 2008 11:13:19 -0400
Subject:
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Thread-Topic:
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG.RE: OC Sandbed access Thread-Index:
AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID:
<2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1 .nrc.gov>
References:
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1 .nrc.gov>In-Reply-To:
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>
Accept-Language:
en-US Content-Language:
en-US X-MS-Has-Attach:
X-MS-Exchange-Organization-SCL:
-1 X-MS-TN EF-Correlator:
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01 .nrc.gov>MIME-Version:
1.0