| | Quarter | Site | Title |
|---|
| 05000390/FIN-2018003-03 | 2018Q3 | Watts Bar | Failure to Collect Compensatory Samples for an Out-of-Service Effluent Monitor |
| 05000315/FIN-2018002-04 | 2018Q2 | Cook | Licensee-Identified Violation |
| 05000346/FIN-2017004-01 | 2017Q4 | Davis Besse | Failure to Maintain Procedures Associated with Ventilation Air Monitoring Assessment Program |
| 05000346/FIN-2017004-02 | 2017Q4 | Davis Besse | Interface Between New Accident Range Ventilation Monitors and the Emergency Preparedness Dose Assessment Program |
| 05000456/FIN-2017003-01 | 2017Q3 | Braidwood | Failure to Implement Adequate Radiological Controls for Treated Liquid Radioactive Effluents Containing Tritium |
| 05000416/FIN-2017012-02 | 2017Q3 | Grand Gulf | Failure to Operate the Gaseous Radwaste System Within Design Specifications |
| 05000341/FIN-2017009-01 | 2017Q1 | Fermi | Failure to Maintain the Effectiveness of the Sites Emergency Plan |
| 05000341/FIN-2016003-02 | 2016Q3 | Fermi | Fluctuating Background Effect on Accident Range Noble Gas Monitor |
| 05000440/FIN-2016002-01 | 2016Q2 | Perry | Failure to Comply with ODCM During Liquid Effluent Discharge |
| 05000255/FIN-2015003-02 | 2015Q3 | Palisades | Failure to Establish, Implement, and Maintain the Offsite Dose Calculation Manual |