ML12307A296

From kanterella
Revision as of 19:51, 1 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Confirmation of Requested Initial Operator License Examinations for Plant St. Lucie
ML12307A296
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/01/2012
From: Reis T
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
Download: ML12307A296 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Mano Nazar Executive Vice President

and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE

Dear Mr. Nazar:

In a letter dated July 12, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Plant St Lucie. Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:

Plant / Station 2013 2014 Date ApplicantsDate Applicants St Lucie NR NR 12/1 15 NR - None Requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.

We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.

A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at

404-997-4436.

M. Nazar 2

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC

=s public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely,

/RA/ Terrence Reis, Director

Division of Reactor Safety

Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16

cc: (See page 3)

_________________________ X G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO M. Nazar 3 cc: Joseph Jensen Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution

Paul Freeman Vice President Organizational Effectiveness Florida Power & Light Company Electronic Mail Distribution

Peter Wells Vice President Outage Support CFAM Florida Power & Light Company Electronic Mail Distribution

Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Daniel D. DeBoer

Operations Site Director St. Lucie Nuclear Plant Electronic Mail Distribution

Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Larry Nicholson

Director Licensing Florida Power & Light Company Electronic Mail Distribution

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution

Mitch S. Ross Vice President and General Counsel

Nuclear Florida Power & Light Company Electronic Mail Distribution

Cynthia Becker (Acting) Chief

Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Bryan Koon

Director Florida Division of Emergency Management Electronic Mail Distribution

Donna Calabrese Emergency Preparedness Manager St. Lucie Plant Electronic Mail Distribution

J. Kammel Radiological Emergency Planning

Administrator Department of Public Safety Electronic Mail Distribution

Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010

Michael Baughman

Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Faye Outlaw County Administrator

St. Lucie County Electronic Mail Distribution

Jack Southard

Director Public Safety Department St. Lucie County Electronic Mail Distribution

Letter to Mano Nazar from Terrence Reis dated November 1, 2012.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR PLANT SAINT LUCIE

Distribution

ORA, RII T. Reis H. Christensen M. Widmann M. Franke

K. Schaaf J. Vincent J. Kirby D. Rich J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource