IR 05000528/2011402

From kanterella
Revision as of 04:32, 31 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
IR 05000528-11-402, 05000529-11-402 and 05000530-11-402, Palo Verde Nuclear Generating Station, Units 1, 2 and 3
ML113550201
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/15/2011
From: Hay M C
Plant Support Branch-1
To: Edington R K
Arizona Public Service Co
References
IR-11-402
Download: ML113550201 (4)


Text

" "

OFFICIAL U SE ONLY December 15, 2011 Randall K. Edington, Executive Vice President, Nuclear/CNO Arizona Public Service Company P.O. Box 52034, Mail Stop 7602 Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -NRC SECURITY INSPECTION REPORT 05000528/2011402, 05000529/2011402 AND 05000530/2011402

Dear Mr. Edington:

On November 18, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 18, 2011, with Mrs. Maria Lacal, Vice President, Operations Support, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified. However, two licensee-identified violations, which were determined to be of very low security significance, are listed in this report. Because of the very low security significance and because these violations were entered into your corrective action program, the NRC is treating these violations as noncited violations (NCVs) consistent with Section 2.3.2.a of the NRC Enforcement Policy. If you contest either of these noncited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the and the NRC Senior Resident Inspector at Palo Verde Nuclear Generating Station. Arizona Public Service Company - 2 - In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/

Michael C. Hay, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-528, 50-529, 50-530 License No.: NPF-41, NPF-51, NPF-74

Nonpublic

Enclosure:

NRC Inspection Report 05000528/2011402, 05000529/2011402 and 05000530/2011402

w/Attachment:

Supplemental Information

cc w/enclosure: Mr. Randall Bramlett Department Leader, Nuclear Security Programs Arizona Public Service Co.

P.O. Box 52034, MS 7002 Phoenix, AZ 85072-2034 Arizona Public Service Company - 3 - cc w/o enclosure: Ronald A. Barnes, Director Nuclear Regulatory Affairs/Environmental Palo Verde Nuclear Generating Station P.O. Box 52034 MS 7636 Phoenix, AZ 85072-2034 Arizona Public Service Company - 4 - Distribution w/enclosure: Ronald Albert, (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN/T-3A5M Clay Johnson, (Clay.Johnson@nrc.gov), NSIR/DSO/DDSO/SPEB, TWFN/3D43 Douglas Garner, (Douglas.Garner@nrc.gov) NSIR/DSP/MWSB, TWFN/4 F6 Branch Chief, RI DRS (James.Trapp@nrc.gov) Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Tony.Brown@nrc.gov)

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Resident Inspector (Joseph.Bashore@nrc.gov) Resident Inspector (Mica.Baquera@nrc.gov) Branch Chief, DRP/D (Ryan.Lantz@nrc.gov) PV Administrative Assistant (Regina.McFadden@nrc.gov) Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

Project Engineer, DRP/D (David.You@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Lauren.Gibson@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource RIV/ETA: OEDO (Mark.Franke@nrc.gov) DRS/TSB STA (Dale.Powers@nrc.gov)

Security Related Complete Report - OUO: SUNSI Review Completed: _MKB ADAMS: Yes Initials: _MKB_

Non-Publicly Available Sensitive-Security- Related-Periodic Review Required Letter Only: SUNSI Review Completed: __ MKB __ ADAMS: Yes Initials: ___ MKB ___

Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBD C:PSB1 MBrooks JBuchanan JCherubini MHay RLantzMHay /RA/ /RA/ /RA/ E /RA/ /RA/ /RA/ 12/15/11 12/14/11 12/15/11 12/15/11 12/14/11 12/15/11 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax