UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX
76011-4511 March 4, 2014
Lou Cortopassi, Site Vice President
Omaha Public Power District
Fort Calhoun Station FC
-2-4 P.O. Box 550
Fort Calhoun, NE
68023-0550 SUBJECT: FORT CALHOUN STATION
- REVISION TO NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000
285/2014 30 1
Dear Mr. Cortopassi
- On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the
arrangements
for the licensing examination during the week of May 19, 2014 (Accession Number ML13137A194). Members of the site examination development staff and NRC regional
staff have reviewed this letter recently. The result is that several of the dates associated with
examination material submittals needed to be revised. Therefore, this letter serves to document the revised dates, as well as the revised assignment of Chief Examiner. These revisions are based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist, Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28
to February 24, 2014.
To meet the schedule
of starting the examination on May 19, 2014, t he operating tests and supporting reference
materials identified in Attachment
3 to ES-201 will be due by
March 31, 2014. The written examination and supporting reference materials will be due by
April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests
before they are submitted to the NRC for review and approval. All materials shall be complete
and read y-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examination
s and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations
to be rescheduled.
In addition, your support for on
-site validation of the examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the examination is Steve Garchow. All other due dates and requests documented in the
May 16, 2013 letter remain the same.
L. Cortopassi
- 2 - This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number
3150-0018. The public reporting burden for
this collection of information is estimated to average
50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including
the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will b
e available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible
from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html.
Thank you for your cooperation in this matter.
Mr. Garchow has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426 , or myself at 817
-200-1 159. Sincerely, /RA/ Vince nt Gaddy, Chief Operations Branch
Division of Reactor Safety
Docket: 50
-285 License: DPR
-40
L. Cortopassi
- 3 - Electronic distribution by RIV
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov
) DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting Deputy Director (Geoffrey.Miller@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project
Manager (Lynnea.Wilkins@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov
) TSB Technical Assistant (Loretta.Williams@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEWEB Resource (Sue.Bogle@nrc.gov)
RIV/ETA: OEDO
(Ernesto.Quinones@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Member (Michael.Markley@nrc.gov)
R:\Reactors\_FCS\201 4lFCS2014301CNL LT.pdf
ADAMS: No Yes SUNSI Review Complete
Reviewer Initials:
VG Publicly Available Non-Sensitive Non-publicly Available
Sensitive OE:OB C: OB SHedger VGaddy /RA/ /RA/ 3/4/14 3/4/14 OFFICIAL RECORD COPY
T=Telephone E=E
-mail F=Fax