ML14247A308

From kanterella
Revision as of 12:11, 9 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Brown Ferry Nuclear Plant, Units 2 & 3, Unit 2 Core Operating Limits Report Cycle 18 Operation, Rev. 1 and Unit 3 Core Operating Limits Report for Cycle 17 Operation, Rev. 1
ML14247A308
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/29/2014
From: Polson K J
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML14247A312 List:
References
Download: ML14247A308 (3)


Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 August 29, 2014 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 2 and 3 Renewed Facility Operating License Nos. DPR-52 and DPR-68 NRC Docket Nos. 50-260 and 50-296

Subject:

Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 18 Operation, Revision 1, and Browns Ferry Nuclear Plant, Unit 3 Core Operating Limits Report for Cycle 17 Operation, Revision I

References:

1. Letter from TVA to NRC, "Browns Ferry Nuclear Plant, Unit 2 Core Operating Limits Report for Cycle 18 Operation," dated March 18, 2013 2. Letter from TVA to NRC, "Browns Ferry Nuclear Plant, Unit 3 Core Operating Limits Report for Cycle 17 Operation," dated February 18, 2014 In accordance with the requirements of Technical Specification (TS) 5.6.5.d, the Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN), Unit 2, Cycle 18, Core Operating Limits Report (COLR), Revision 1, and the BFN, Unit 3, Cycle 17, COLR, Revision 1. Revision 0 of the BFN, Unit 2, Cycle 18, COLR (Reference 1), and revision 0 of the BFN, Unit 3, Cycle 17, COLR (Reference 2)included all modes of operation (Modes 1 through 5). The BFN, Unit 2, Cycle 18, COLR, and the BFN, Unit 3, Cycle 17, COLR have been updated to revise the plant operating limits for single loop operation.

U.S. Nuclear Regulatory Commission Page 2 August 29, 2014 There are no new commitments contained in this letter. If you have any questions please contact Jamie L. Paul at (256) 729-2636.Respectfully, K. J. Poison Vice President

Enclosures:

1. Core Operating Limits Report, (105% OLTP), for Cycle 18 Operation TVA-COLR-BF2C18, Revision 1 2. Core Operating Limits Report, (105% OLTP), for Cycle 17 Operation TVA-COLR-BF3C17, Revision 1 cc: (w/ Enclosure)

NRC Regional Administrator

-Region II NRC Senior Resident Inspector

-Browns Ferry Nuclear Plant Enclosure I Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 Core Operating Limits Report, (105% OLTP), for Cycle 18 Operation TVA-COLR-BF2C18, Revision I (See Attached)