ML17018A123
| ML17018A123 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/17/2017 |
| From: | Miller G B NRC/RGN-IV/DRP/RPB-D |
| To: | Kennedy K M Region 4 Administrator |
| Miller G B | |
| References | |
| MD 8.3 | |
| Download: ML17018A123 (5) | |
Text
January 17, 201 7 MEMORANDUM TO:
Kriss M. Kennedy, Regional Administrator THRU: Troy W. Pruett, Director /RA/ Division of Reactor Projects FROM: Geoffrey B. Miller, Chief /RA/ Project Branch D
SUBJECT:
MANAGEMENT DIRECTIVE 8.3 EVALUATION FOR PALO VERDE UNIT 3 EMERGENCY DIESEL GENERATOR FAILURE
Pursuant to Regional Office Policy Guide 0801, "Management Directive 8.3 and Inspection Manual Chapter 0309 Reactive Team Inspection Decisions, Implementation
, and Documentation for Power Reactors," the enclosed table provides the Management Directive
8.3 evaluation
for determining that a Special Inspection T eam inspection will be conducted at Palo Verde for the catastrophic failure of the Unit 3 emergency diesel generator
. Concur with Recommendation:
/RA/ 1/17/17 Kriss M. Kennedy Date Regional Administrator
Enclosure s: MD 8.3 Decision Documentation Form (Deterministic and Risk Criteria Analyzed)
CONTACT: Geoffrey B. Miller 817-200-1173 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011
-4511
ML17018A123 SUNSI Review By: JLD ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4/A.7 OFFICE RIV:SPE:DRP SRA:DRS/PSB2 C:DRP/D D:DRS D:DRP NAME JDixon DLoveless GMiller AVegel TPruett SIGNATURE /RA Geoff Miller for
/ /RA/ /RA/ /RA/ /RA/ DATE 12/27/16 1/5/17 1/9/17 1/9/17 1/10/17