IR 05000346/2013201
| ML13358A204 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/13/2014 |
| From: | West G B Division of Security Operations |
| To: | Lieb R FirstEnergy Nuclear Operating Co |
| Shared Package | |
| ML13358A192 | List: |
| References | |
| IR-13-201 | |
| Download: ML13358A204 (3) | |
Text
January 13, 2014
Mr. Raymond Lieb Site Vice President
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY INSPECTION REPORT 05000346/2013201
Dear Mr. Lieb:
On December 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on December 18, 2013, with L. Rushing, Director - Steam Generator Replacement Project, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management Sy stem (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's PARS, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA by Michael J. Buckley for/
Garmon West, Jr., Chief Security Training and Support Branch
Division of Security Operations Office of Nuclear Security and Incident Response
Docket Nos. 50-346 License Nos. NPF-3
Enclosure Inspection Report 05000346/2013201
w/Attachments:
Supplemental Information response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,/RA by Michael J. Buckley for/
Garmon West, Jr., Chief Security Training and Support Branch
Division of Security Operations Office of Nuclear Security and Incident Response
Docket Nos. 50-346 License Nos. NPF-3
Enclosure Inspection Report 05000346/2013201
w/Attachments:
Supplemental Information
DISTRIBUTION:
R. Albert, NSIR M. Buckley, NSIR N. Simonian, NSIR C. Johnson, NSIR D. Johnson, NSIR C. Keon, NSIR M. Maley, NSIR L. Jones, NSIR C. Adkison, NSIR
A. Dimitriadis, RI B. Desai, RII R. Skokowski, RIII M. Haire, RIV
ADAMS PACKAGE NO.:
ML13358A192 Letter: ML13358A204
Enclosure:
ML13358A207 OFFICE NSIR/DSO/STSB NSIR/DSO/STSB NSIR/DSO/STSB NAME D. Johnson M. Buckley G. West DATE 1/2/14 12/30/14 1/13/14 OFFICIAL RECORD COPY