IR 05000020/2014201
| ML14153A599 | |
| Person / Time | |
|---|---|
| Site: | MIT Nuclear Research Reactor |
| Issue date: | 06/05/2014 |
| From: | Lamb T A Research and Test Reactors Branch B |
| To: | Newton T H Massachusetts Institute of Technology (MIT) |
| Eads J H, DPR/PRTB, 415-0136 | |
| References | |
| Download: ML14153A599 (19) | |
Text
June 5, 2014
Dr. Thomas Interim Director of Reactor Operations Massachusetts Institute of Technology Research Reactor MITNRL-NW 12 138 Albany Street Cambridge, MA 02139
SUBJECT: MASSACHUSETTS INSTITUTE OF TECHNOLOGY - NRC ROUTINE INSPECTION REPORT NO. 50-020/2014-201
Dear Dr. Newton:
From May 5 - 8, 2014, the U.S. Nuclear Regulatory Commission (NRC or the Commission) conducted an inspection at the Massachusetts Institute of Technology Research Reactor facility (Inspection Report No. 50-020/2014-201). The enclosed report documents the inspection results, which were discussed on May 8, 2014, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.
No response to this letter is required.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390, "Public inspections, exemptions, and requests for withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, please contact Johnny Eads at (919) 219-9128 or by electronic mail at Johnny.Eads@nrc.gov
.
Sincerely,/RA/
Taylor A. Lamb, Acting Chief Research and Test Reactors Oversight Branch
Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.: 50-020 License No.: R-37
Enclosure:
NRC Inspection Report No. 50-020/2014-201
cc: See next page Massachusetts Institute of Technology Docket No.50-020
cc:
City Manager
City Hall Cambridge, MA 02139
Department of Environmental Protection
One Winter Street Boston, MA 02108
Beverly Anderson, Interim Director Radiation Control Program Department of Public Health
Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129
John Giarrusso, Planning and Preparedness Division Chief Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399
Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida
Gainesville, FL 32611-8300