AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-40: Tracks for Top 10 SLOSH-Calculated Surge Events at IPEC Shown by NumericStorm Identification and Surge Ranking (AREVA, 2013e)Page 3-105 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-41: Tracks for Top 10 SLOSH-Calculated Surge Events at The Battery Shown byNumeric Storm Identification and Surge Ranking (AREVA, 2013e)Page 3-106 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 30.250.2-IPEC Low Tide0.1ZIS0.150wN_ 0.10z0-05n0 5 10 15 20SLOSH Calculated Max Storm Surge Elevation (ft, NAVD88)Figure 3.4-42: Histogram of Maximum Storm Surge at IPEC at Low0.2, , 1Tide (AREVA, 2013e)[ I PEC High Tide]0.181-0-161-I10.14.- 0.120> 0.1wS0.08o 0.06zFF1-1-0.04 F0.02 F010 5 10 15 20SLOSH Calcuated Max Storm Surge Elevabon (It, NAVD88)Figure 3.4-43: Histogram of Maximum Storm Surge at IPEC at High Tide (AREVA, 2013e)Page 3-107 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 30-090.08I -The Battery Low Tide II 1II0.07C-)SU-0= .050.049 0.060~ZIJL0.04NlE 0.030z0.020.010 1 10 5 10 15 20 25 30 35SLOSH Calculated Max Storm Surge Elevation (It, NAVD88)Figure 3.4-44: Histogram of Maximum Storm Surge at The Battery at0.09, 1 1 1 1Low Tide (AREVA, 2013e)III The Batt-r H-igh Tide I0.08 1-0.07 I-C,)U-00.060~0LLt0.05S"' 0.040_N~0.030zI-I-I -...." °'tr" ,ow II-0.02 I-0.01 -n L --E, ,~0 5 10 15 20 25 30 35SLOSH Calculated Max Storm Surge Elevation (Ift, NAVD88)Figure 3.4-45: Histogram of Maximum Storm Surge at The Battery at High Tide (AREVA, 2013e)Page 3-108 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33530"25Z 201151101 5W"8lI0 LJL -___ ___ I I L 4L i1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09Retum Period (years)Figure 3.4-46: SLOSH-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPEC35... -A-- Surge Elevation (0.25 ft Increments) 30Z25201,5210115a'l4-(U10A-AM0 .T r -.. .. .........
.. ..-. T ...... ..I1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09Return Period (yrs)Figure 3.4-47: SLOSH-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at The Battery(AREVA, 2013e)Page 3-109 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33~1.2-300 CO 0n 00 00 00 00 0O 00hi rN N N NN N N1 N1 U1 U1o o o -. o-ADCIRC @ The Batteryx Predicted TidesAA-4-1i-uRI--mul---
00LN8lLN00 00 00 00 W0 0 0 0O/ Ori *. '1 00 00 U IOo N, 0 n 0 N 000 00 00o o. NN 8Date and TimeFigure 3.4-48: Comparison of ADCIRC Tidal Results to Predicted Tides at The Battery (AREVA,2013e)543z 2---Tides only -Tides + 25yr flood24-IU1 V-- ---.- -A-~- --- -__~~~*~-~
---A-200Ln00 0)N N0,00NN0.6i0n0000 00U' U'oDate and Time00NIDU'06000 00N NID 0U' (I'N 0N0000U'000Figure 3.4-49: ADCIRC Tidal Results with 25-year Flood in the Hudson River at IPEC (AREVA,2013e)Page 3-110 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 32o04A'U20191817 ----16 .1514 .131211109876 --43210S.4.. Surge Elevation (0.25 ft Increments) 100,000 1,000,000 10,000,000 Return Period (years)Figure 3.4-50: ADCIRC-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPECwithout Sea Level Rise (AREVA, 2013e)Page 3-111 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Co.24ýz4-(5OhuJa,2019181716151413 ----121110 ------9876543 -21100,0004. Surge Elevation with 50-yr Sea Level Rise (0.25 ft Increments) 1,000,000 10,000,000 Return Period (years)Notes:1. On Figure 51, each data point represents a set of storm simulations that falls within each surge increment.
Figure 3.4-51: ADCIRC-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPEC withSea Level Rise (AREVA, 2013e)Page 3-112 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-52: Inundation Map -Combined Effect Flood -Probabilistic Storm SurgePage 3-113 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.5 SeicheA seiche is an oscillation of the water surface in an enclosed or semi-enclosed body of water initiated by an external cause. Once started, the oscillation may continue for several cycles; however, over timeit gradually decays because of friction (NRC, 2011, Section 3.6).There are two water bodies, The Hudson River and the IPEC Discharge Canal, in the vicinity of IPECthat require evaluation for Probable Maximum Seiche (PMS), as shown in Figure 3.5-1.3.5.1 MethodThe hierarchical hazard assessment (HAA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of seiches on the maximum water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011).The HHA approach is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and3. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992)Proximity of IPEC to a large river estuary, the Hudson River, requires evaluation of the PMS for a semi-enclosed basin. This evaluation addresses the PMS at the site with consideration of meteorological, astronomical, and seismic forcing as the causative mechanism for low frequency water surfaceoscillations or seiche in a semi-enclosed basin, the Hudson River.The discharge canal at IPEC also requires evaluation of the PMS for both a semi-enclosed basin (in thelongitudinal direction) and an enclosed basin (in the transverse direction).
This evaluation addresses the PMS at the site with consideration of meteorological, astronomical, and seismic forcing as thecausative mechanism for low frequency water surface oscillations or seiche in both a semi-enclosed and enclosed basins, in the discharge canal at IPEC.With respect to seiche evaluations for both of the water bodies of interest near IPEC, the following steps were used:1. Estimate the natural period of oscillation (primary seiche mode) of the surface water bodiesusing Merian's Formula;2. Analyze measured water level data within the Hudson River to identify the natural periods of theHudson River, and compare to the periods developed for the river using Merian's Formula;3. Compare the natural period of the surface water bodies to the periods of potential forcingmechanisms, including meteorological, astronomical and seismic conditions, to determine thepotential for resonance; andPage 3-114 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34. Evaluate flood levels where resonance could occur.3.5.1.1 Natural Period of the Surface Water BodiesAs noted above, the natural periods of oscillation of the surface water bodies were determined bycalculation using Merian's formula and evaluation of water level data. The dimensions of the waterbodies were developed using ArcMap 10.0 in a UTM Zone 18 Projection and IPEC drawings.
Merian's Formula provides a method for estimating the natural periods for the seiche modes inenclosed and semi-enclosed basins (Scheffner, 2008). The Hudson River and the discharge canal (inthe longitudinal direction) are semi-enclosed basins and the primary seiche modes are defined byEquation 1:4'T 41 ((Equation 1)(1+ 2n),Fg/where:T is the periodI is the length of the basing is the acceleration due to gravityh is the average depth of the basin..Jg is the shallow water wave speedn = the number of nodes along the axis of the basin (0 for the primary mode of asemi-enclosed basin), n=0,1,2...
In the transverse direction the discharge canal is considered an enclosed basin since it is bounded by asteel sheet pile bulkhead on the west side and a riprap slope on the east side (See Figure 3.5-12).Merian's Formula for an enclosed basin is presented in Equation 2, below (Sheffner, 2008):T = 21 (Equation 2)n ýg~hwhere:T is the periodI is the length of the basing is the acceleration due to gravityh is the average depth of the basin.ýfgh is the shallow water wave speedn = the number of nodes along the axis of the basin, 1 for the primary mode in anenclosed basinA spectral analysis of water level data was also performed to compare the estimated period of theprimary seiche mode with the observed periodicity of the Hudson River using six-minute water leveldata at USGS water level stations on the Hudson River, and one NOAA water level station near theHudson River (See Figures 3.5-5 and 3.5-6). The commercially available software MATLAB R201 lbwas used to perform the Fast Fourier Transform on each water level station data set.Page 3-115 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (I.PEC) Units 2 and 33.5.1.2 Periods of External Forcing Mechanisms Applicable forcing mechanisms include meteorological, astronomical, and seismic events. Thefundamental periods of the forcing mechanisms have to match the natural frequency of the surfacewater bodies (resonance) for significant seiche amplification to occur. The periods of the externalforcing mechanisms were developed based on typical, published ranges for these mechanisms.
3.5.2 Results3.5.2.1 Natural Period in the Hudson River using Merian's FormulaLongitudinal Direction The Hudson River was evaluated as a semi-enclosed basin in the longitudinal direction (AREVA, 2013).The resonant modes of a semi-enclosed basin are shown in Figure 3.5-4. The period of the primarymode is determined by setting n=0 in Merian's Equation
- 1. In a riverine environment, the location of theanti-node is at the head of the basin, defined as a physical barrier or a rapidly diminishing river crosssection that impedes upstream flow and reflects the wave energy. In the case of IPEC, the FederalDam at Tory acts as an anti-node for seiches.
The mouth of the river basin acts as a node.The Hudson River measures approximately 820,850 feet from the mouth at the Battery to the FederalDam and has an average depth of approximately 43 feet. Figures 3.5-2 and 3.5-3 show a plan view ofdepth in meters below NAVD88 along the length of the river. All measurements were performed usingArcMap 10.0 in a UTM Zone 18 Projection.
Merian's formula provides an estimated period for theprimary mode of approximately 24.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, as provided in Table 3.5-1.Transverse Direction The Hudson River was evaluated as an enclosed basin in the transverse direction since both ends ofthe basin in this direction are closed. The primary mode is determined by Equation 2 with n=1. Thelength of the basin (i.e., width of the river) is approximately 5,000 feet. The primary period wascalculated using two depths of 30 and 50 feet based on the range on measured water depth. Theestimated period for the primary mode in Hudson River in the transverse direction is 4 to 6 minutes, asprovided in Table 3.5-1.3.5.2.2 Observed Natural Period in the Hudson RiverThe natural periods of the river were also evaluated by performing a spectral analysis of measuredwater level data. The locations of the four USGS river stations and the NOAA Sandy Hook station areshown in Figure 3.5-6. The spectral analysis of the fifteen minute water level data for the four USGSwater level stations was carried out on eight to eighteen years of data from the station, and on tenyears of data from the 6 minute NOAA station using the commercially available software MatlabTMRelease 201 lb. The analysis was performed by applying a discreet Fast Fourier Transform (FFT) tothe water level data.The results of the spectral analysis are presented in Figures 3.5-7 through 3.5-11. The semi-diurnal tides form the largest peaks in the power spectra at all five observation locations, followed by thediurnal tides, which have a relative power about one order of magnitude lower than the semi-diurnal tides for the river water level stations.
The tidal harmonic constituents for the Battery, Haverstraw Bayand Albany are shown in Table 3.5-3.Tidal forcing from the principle astronomical components causes these strong spectral peaks near 1and 2 cycles per day and match well with the natural period estimated using Merian's Formula.
InPage 3-116 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3shallow waters such as the Hudson River the observed tidal spectrum has additional harmonic peaks,known as overtides, caused by transfer of energy to higher frequencies due to non-linear interactions between the tides and the local bathymetry.
The observed peaks at frequencies of three cycles per dayand higher are all known constituents which occur to some degree in all shallow tidal estuaries.
The spectral analysis of the observed water level shows no direct evidence of a seiche. All of thespectral peaks in Figures 3.5-7 through 3.5-11 are known tidal constituents observed in most coastaland estuarine environments.
- Further, the power in the peaks for the principle components show nosign of amplification toward the head of the river. Based on the observation data, there is no sign ofseiche dynamics in these time series for the Hudson River system.3.5.2.3 External Forcing Mechanisms in the Hudson RiverThe periods of external forcing mechanisms were evaluated to determine if resonance with the periodsof Hudson River is likely. Possible external forcing mechanisms include astronomical tides,earthquakes, and meteorological conditions including wind gusts and storms.Earthquakes The typical frequency content of earthquakes falls outside this range (approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ascalculated in section 3.5.2.1).
The typical range of ground motion periods from earthquakes do notnormally exceed ten seconds.Meteorological Meteorological forcing does not have sufficient energy at this frequency to drive a seiche in the HudsonRiver. Local convection drives wind gusts with a period of about one minute, and diurnal heating andcooling also drive weak periodic motions.
In temperate
- regions, the synoptic scale is the spatial andtemporal scale or temperate weather systems, which in the U.S. is about three to seven days (Wells,1997). The synoptic variability is too long to force a seiche in the Hudson River.Astronomical The tides in the Hudson River estuary drive a surface height oscillation of about 3.3 feet near IPEC.The period of diurnal tides fall within the range of seiche periods calculated in the Hudson River and area potential source of resonance.
Overall the diurnal and semi-diurnal tidal constituents diminish fromThe Sandy Hook to Haverstraw Bay, see Table 3.5-4 (NOAA, 2005a-d) and Figure 3.5-5 for theselocations.
The minor increases in the tidal constituent amplitudes is not evidence to support aconclusion that there is a resonant seiche due to astronomical tides in the Hudson River. The absenceof a resonant seiche is likely due in part to frictional dissipation of the river system.3.5.2.4 Natural Periods of the Discharge CanalThe canal length was determined by measuring the canal length on the site topographic plan (Sanborn, 2013). The channel depth and width are based on the typical section presented in Figure 3.5-12 (IPEC,1970). The discharge channel length measures approximately 530 feet long, 72 feet wide and is 20feet deep relative to MSL. The transverse calculation for the discharge is based on an average width of62 feet.Based on the channel dimensions in the longitudinal direction, the period of the primary mode of thedischarge canal is 84 seconds.
The primary mode in the transverse direction is approximately 5seconds.
An overview of the channel dimensions and associated periods is provided in Table 3.5-2.Page 3-117 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.5.2.5 External Forcing Mechanisms in the Intake and Discharge CanalsEarthquakes The frequency content of earthquakes can vary by earthquake and by distance of the site from theearthquake epicenter, however it is typically less than ten seconds.
The natural period of the canal inthe transverse direction falls within the range possible for earthquakes; therefore, resonance in thisdirection is possible and would result in "sloshing" of the canal water in the transverse direction.
Due tothe configuration of the discharge canal, see Figure 3.5-12, the height of the seiche in the transverse direction is limited by the elevation of the outboard steel sheet pile bulkhead which is approximately 8.0feet MSL. Therefore, if a seiche were to occur in the transverse direction, it would be limited to theheight of the bulkhead and would not overtop the landward bank of the canal at elevation 15 feet MSL,see Figure 3.5-12.Meteorological Meteorological forcing such as wind gusts, typically have a period of approximately 1 minute (Wells,1997), and therefore do not have a period in alignment with period of the primary seiche mode in thetransverse direction (about 5 seconds).
The period of primary mode on the longitudinal direction (84seconds) is close to that of wind gusts. However, wind gusts are not expected to create an initialsignificant wind set-up or consistent oscillating source of resonant forcing of sufficient strength on thespatial and temporal scales of the discharge canal to cause a significant seiche. A single storm eventmight cause a large storm surge; however, for resonance to occur, for either reflection point, stormforcing would have to be periodic at approximately once per day.Astronomical The astronomical tides in the Hudson River have periods that are several orders of magnitude largethan the longitudinal period of the discharge canal and do not cause resonance.
WavesAlthough wind-generated waves could occur with periods in the range of the transverse discharge canalperiod, the geometry of the discharge canal does not allow waves to enter the discharge canal in thetransverse direction.
The primary mode of the seiche in the longitudinal direction is 84 seconds, and isoutside the range of wind-generated wave periods.3.5.3 Conclusions The following summarizes the results and conclusions:
- 1. Two water bodies were identified as being susceptible to seiches and potentially creating a floodhazard at IPEC:a. The Hudson River;b. The discharge canal at IPEC2. Seiche motion is strongly damped in the Hudson River and is therefore a seiche is not a threat tothe Indian Point Energy Center;3. Merian's
- formula, and statistical analysis indicate that the Hudson River has a primary seichemode with a period of approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in the longitudinal direction and 4 to 6 minutes inthe transverse direction;
- 4. Merian's formula indicates that the IPEC discharge canal has a primary seiche mode with aperiod of approximately 84 seconds in the longitudinal direction and 5 seconds in the transverse direction; Page 3-118 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3No further analysis or modeling is required due to the direct observational evidence that resonantmodes are damped in the Hudson River and that potential seiches in the discharge channel will notimpact SCCs important to safety.3.5.4 References AREVA 2013. "Indian Point Energy Center Flood Hazard Re-evaluation
-Probable Maximum Seiche",AREVA Document No. 32-9196317-000, 2013.IPEC, 1970. "Indian Point Sheet Piling for Extension of Discharge Canal", Drawing No. B182027-0, Consolidated Edison, Co., June, 1970, See AREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011.NOAA, 2005a. Albany, Hudson River, NY -Harmonic Constituents.
Retrieved December 20, 2012,from Tides and Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtmI?stn=8518995%20Albany,/%20Hudson%2ý0River,%2 ONY&type=Harmonic%20Constituents NOAA, 2005b. Haverstraw Bay, NY -Harmonic Constituents.
Retrieved December 20, 2012, fromTides and Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtmI?stn=8518924%2OHaverstraw%20Bay,%20NY&type
=Harmonic%20Constituents NOAA, 2005c. The Battery, NY -Harmonic Constituents.
Retrieved December 20, 2012, from Tidesand Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtml?stn=8518750%2OThe%2OBattery,/%20NY&type=Ha rmonic%20Constituents NOAA, 2005d. Sandy Hook, NJ -Harmonic Constituents.
Retrieved December 20, 2012, from Tidesand Currents:
http://tidesandcurrents.noaa.gov/datamenu.shtml?stn=8531680 Sandy Hook,NJ&type=Harmonic+Constituents
- Sanborn, 2013. Indian Point Energy Center (IPEC) Topographic Survey, Sanborn Map Company, Inc.,January 2013, AREVA Document No. 38- 9196956-000.
Scheffner, 2008 Scheffner N.W. 2008. "Water Levels and Long Waves." In: Demirbilek, Z., CoastalEngineering Manual, Part II, Coastal Hydrodynamics Chapter 5-6, Engineer Manual 1110 1100, U.S.Army Corps of Engineers, Washington, D.C.Wells, 1997. Wells, N. "The Atmosphere and Ocean, A Physical Introduction."
John Wiley & sons Ltd,1997.Page 3-119 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-1: Seiche Parameters for the Hudson RiverDirection Length (feet) Depth (feet) PeriodLongitudinal 820,850 43 24.6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sTransverse 5000 30 5.2 minutesTransverse 5000 50 4.2 minutesPage 3-120 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-2: Seiche Parameters for the IPEC Discharge CanalDischarge Canal Length (feet) Depth (feet) Period (Seconds)
Longitudinal 530 20 84Transverse 62 20 5Page 3-121 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-3: Tidal constituent at three sites on the Hudson River from NOAAAmplitude (Feet)Period TheName Type (hou Frequency (1/days)
Sandy Hook Tte Haverstraw Bay Albany(hours) BatterySemi-M2 d iu 12.4 0.5 2.3 2.2 1.5 2.3diurnalN2 Semi- 12.7 0.5 0.5 0.5 0.3 0.4diurnalSemi-S2 diu 12 0.5 0.4 0.4 0.3 0.3diurnalK1 Diurnal 23.9 1.0 0.3 0.3 0.3 0.401 Diurnal 25.8 1.1 0.2 0.2 0.2 0.2Semi-K2 d iu 11.9 0.5 0.1 0.1 0.1 0.1diurnalP1 Diurnal 24.1 1.0 0.1 0.1 0.1 0.1Q1 Diurnal 26.9 1.1 0.03 0.04 0.0 0.0Page 3-122 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-4: Ratio of tidal constituents on the Hudson River to Sandy Hook, NJ from NOAA.Battery/
Haverstraw/Sandy Name Type Sandy Hook Hook Albany/Sandy HookM2 Semidiurnal 0.97 0.67 0.99N2 Semidiurnal 0.98 0.55 0.81S2 Semidiurnal 0.96 0.61 0.74K1 Diurnal 0.99 0.89 1.101 Diurnal 0.96 0.89 1.2K2 Semidiurnal 0.92 0.57 1.1P1 Diurnal 0.99 0.73 1.0Q1 Diurnal 0.95 0.81 1.0Page 3-123 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-1: Site Locus Map with location of the IPEC discharge canal (ESRI, 2012).Page 3-124 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3\ /~..r..,o1.~3 6 9I 7D.Figure 3.5-2: NYS DEC Lower Hudson River Estuary Program bathymetry.
The dashed line is the approximate location of the deepest channel.
The horizontal datum is NAD83and the vertical datum is NAVD88 (NYS, 2009).Page 3-125 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-3: NYS DEC Upper Hudson River Estuary Program bathymetry.
The dashed line is the approximate location of the deepest channel.
The horizontal datum is NAD83and the vertical datum is NAVD88. Note this portion of the Hudson River is approximately 45 milesupstream of IPEC (NYS, 2009).Page 3-126 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3"b., LCS[L93ASIN K1) F .kr crr ertcl IVrdeH- r r H rn Qr ic '(1) P1 ofil(2) Water Motion(u) STANDING WAVESOn i de-(2) ',econd %lode(Second Harrcr~ic)
(p:) ON FN-ý) RASN?(;)Second Mccf-(Tf ird -1(Jr~r 1Lm(3) Tirc' Mode'Fiftb cro(.h~ird WMde\N 7~' 7~I / N-9Sudoce Prn~iIen
-o~ o~;IIntYq
~veFigure 3.5-4: Diagram of the first three resonant modes of an enclosed (left) and semi-enclosed (right) basin from Scheffner 2008.Page 3-127 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-5: Map of the Hudson River including the location of IPEC and NOAA TidalConstituents Stations (NOAA, 2005a-d).
Page 3-128 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-6: Map of the Hudson River including the location of IPEC and USGS Stream Gagesused for a Fast Fourier Transform (USGS, 1991; NOAA, 2012).Page 3-129 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-7: Spectral Analysis of surface height time series at Albany on the Hudson River.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-130 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-8: Spectral Analysis of surface height time series at Hastings on the Hudson River.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-131 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-9: Spectral Analysis of surface height time series at Poughkeepsie on the HudsonRiver.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-132 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-10: Spectral Analysis of surface height time series at West Point on the HudsonRiver.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-133 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-11: Spectral Analysis of surface height time series at Sandy Hook on the HudsonRiver.The y-axis has units of spectral power in this case proportional to meters squared.
The x-axis has unitsof frequency in days or cycles per day.Page 3-134 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC)Units 2 and 3WIADO 6ir x-/41- J30'404,"'e'q Mfly. .01,qpRtP- ~3RSEC:TION A-ASCALE h6-' V-0ROCKI9410Figure 3.5-12 Profile view of the IPEC discharge canal, (IPEC, 1970).Page 3-135 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.6 TsunamiThis section addresses the potential for flooding at Indian Point Energy Center (IPEC) due to theprobable maximum tsunami (PMT) on the Hudson River.As defined in NUREG/CR-6966 (U.S. NRC, 2009), the PMT is that tsunami for which the impact at thesite is derived from the use of the best available scientific information to arrive at the set of scenarios reasonably expected to affect the nuclear power plant site, taking into account:1) appropriate consideration of the most severe of the natural phenomena that have beenhistorically reported for the site and surrounding area, with sufficient margin for the limitedaccuracy, quantity and period of time in which the historical data have been accumulated;
- 2) appropriate combinations of the effects of normal and accident conditions with the effects of thenatural phenomena; and3) the importance of safety functions to be performed.
The Indian Point Energy Center (IPEC) is located approximately 43 mi upstream of the Battery andapproximately 60 mi upstream from the ocean coast (See Figure 3.6-1). Due to its location (about 60miles from the coast), direct inundation of IPEC from a tsunami will not occur. However, given itslocation on a tidal river which is connected to the ocean, IPEC could potentially experience boresinduced by a coastal tsunami propagating up the Hudson River; therefore, evaluation of both thecoastal tsunami hazard and likelihood of impact to IPEC was performed.
3.6.1 MethodThe approach and methodology used in the tsunami described below. Unless noted otherwise, theapproach used in this report is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007 (NRC, 2007);2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976 (NRC, 1976);b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977 (NRC, 1977);3. NUREG/CR-7046
-Design Basis Flood Estimation for Site Characterization at Nuclear PowerPlants in the United States of America, dated November 2011 (NRC, 2011);4. American National Standard for Determining Design Basis Flooding at Power Reactor Sites,ANSI/ANS 2.8- 1992 (ANSI/ANS-2.8, 1992); and5. NUREG/CR-6966 "Tsunami Hazard Assessment at Nuclear Power Plant Sites in the UnitedStates of America",
Final Report (NRC, 2009).In accordance with the guidelines presented in NUREG/CD-6966 (NRC, 2009), a hierarchical assessment approach is used to evaluate the tsunami hazard. Relative to tsunami hazards, thehierarchical hazard assessment (HHA) approach consists of the following steps:1. A Regional Screening Test involving an evaluation of the regional hazard based on a review ofthe historical record and the best available scientific data.Page 3-136 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 32. For sites where the Regional Screening Test has identified a tsunami hazard, a Site Screening Test is performed to compare the location and elevation of the plant site with the areas affectedby tsunamis in the region.3. A Detailed Tsunami Hazard Assessment is performed if the screening tests do not establish thesafety of the plant. A detailed, site-specific tsunami hazard assessment typically involvesidentification and modeling of applicable (near-field and far-field) tsunamigenic sources,numerical modeling of wave propagation from the tsunamigenic source to the near shore andnumerical inundation modeling of the plant site and vicinity.
The methodology to complete the Regional and Site Screening Tests included:
- 1. Review of the National Geophysical Data Center (NGDC) Tsunami Event Database (NGDC,2012) and other sources relative to documented historical tsunamis at or near the site;2. A literature search to identify the near-field and far-field tsunamigenic sources that areconsidered a risk relative to generation of tsunamis that may impact the site;3. Review of published first-order modeling performed for the National Oceanic and Atmospheric Administration (NOAA), as part of the National Tsunami Hazard Mitigation Program (NTHMP,2012), and others, for the United States (U.S.) East Coast; and4. Consultation with tsunami subject matter expert, Dr. Stephan Grilli, PhD, PE. Dr. Grilli is aProfessor of Ocean Engineering at the University of Rhode Island and is currently undercontract with NOAA-NTHMP to evaluate the tsunami hazard risk along the U.S. East Coast,including performance of the above-referenced modeling and on-going, detailed tsunami hazardassessments of selected areas of the East Coast.A simplified hydraulic analysis to assess (as part of the Site Screening) whether or not the hydraulic conditions of the Hudson River appear conducive to propagation of bores of significant amplitude toIPEC.3.6.2 Results3.6.2.1 Regional Screening Test (AREVA, 2013a)The regional screening test evaluated the coastal (i.e., near the mouth of the Hudson River) tsunamihazard from both near-field and far-field tsunamigenic sources.
The industry technical literature, reflecting the available scientific data on tsunami hazards in the Atlantic Ocean, were compiled andreviewed.
That included the NGDC tsunami and earthquake databases, work completed as part ofNOAA's National Tsunami Hazard Mitigation Program (NTHMP),
and a comprehensive study oftsunami hazard in the Atlantic published by the Atlantic and Gulf of Mexico Tsunami HazardAssessment Group (AGMTHAG) and a detailed literature review of tsunamigenic sources affecting tsunami hazard along the U.S. East coast (Grilli et al, 2011).Historic Tsunami RecordThe NOAA NGDC tsunami database (NGDC, 2012) was queried to identify historic tsunami run-up andsource events along the U.S. and Canadian Atlantic coasts. The database query results aresummarized in Table 3.6-1. The tsunami runup heights as measured by tide gages along the U.S eastcoast ranged in height from 0.2 to 2.2 feet (NGDC, 2012).Page 3-137 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Tsunamigenic SourcesGrilli et al, 2011 assesses the regional tsunami hazard for the U.S. East Coast and contains resultsfrom relevant tsunami inundation models applied in the region. In addition, during 2007 and 2008, theAGMTHAG, 2008 performed additional evaluation of potential tsunamigenic sources capable ofimpacting the U.S. Atlantic and the Gulf of Mexico coasts. The findings of both Grilli at al, 2011 andAGMTHAG, 2008 were that the primary tsunamigenic sources defining the tsunami hazard along theU.S. northeast coast are:* Near-field submarine mass failures (SMFs) (i.e., landslides) along the U.S. Atlantic continental margin;" Far-field, transoceanic subaerial landslides (the Canary Island's Cumbre Vieja Volcanocollapse);
- Far-field earthquakes along the Azores-Gibraltar Plate Boundary (convergence zone); and" Far-field earthquakes along the Caribbean-North America Plate Boundary (Puerto Rico Trenchsubduction zone).Figure 3.6-2 identifies the locations of these sources.Near-field Tsunamigenic SourcesSubmarine mass failures (SMFs) along the U.S. Atlantic continental margin have potential to generatelocal tsunamis that impact nearby coastlines.
These landslides occurred historically offshore of NewEngland and Long Island, outward of major ancient rivers in the mid-Atlantic, and in the salt domeprovince offshore of North Carolina (Twichell et al, 2009). Figure 3.6-3 shows the mapped distribution of submarine landslides along the U.S. Atlantic continental slope and rise (AGMTHAG, 2008).The potential magnitude of landslide-generated tsunamis is extremely site-specific and depends ondetailed
- geometry, location, and slide volume, as well as the mode of rupture.
Most of theseparameters are poorly understood for observed landslide scars (Grilli et al, 2011). The onlydocumented historic submarine landslide tsunami to impact the North American coastline occurred as aresult of the 1929 Laurentian Slope Earthquake near the Grand Banks (magnitude of Mw=7.2).
Historicdata and tectonics both suggest that similar large tsunamigenic earthquakes are uncommon in theregion, and this event represents, to date, the largest earthquake ever recorded in the North Americancoastal regions of the Atlantic basin (Grilli et al, 2011; Whitmore et al, 2009).Recent work (Grilli et al, 2011; Grilli et al, 2009 and Grilli et al, 2012) presents a regional assessment of the U.S. East Coast tsunami hazard based on on-going work for NOAA's NTMHP program.
Firstorder screening analyses of both near-field and far-field sources are complete and the results, given interms of near shore breaking wave height and runup, some with defined return periods, are presented below.Grilli et al, 2009 developed a probabilistic Monte Carlo Simulation (MCS) approach to determine SMFtsunami hazard along the upper northeast U.S. coast, which was refined and extended to the entireU.S. East coast by Krause, 2011 and Grilli et al, 2012 as part of the NOAA-NTHMP project.
In thisanalysis, the tsunami hazard was assessed from local SMF sources triggered on the continental slopeby moderate seismic activity, by performing simplified stochastic slope stability and tsunamigeneration/propagation analyses.
The results of this preliminary, screening-level analysis provide first-order estimates of wave amplitude and runup. Over 15,000 stochastic stability analyses of submerged slopes were performed along each of the 45 actual shelf transects in the Northeast and then againalong the additional 46 transects (See Figure 3.6-4) that were added for the remaining portion of thePage 3-138 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3coast. The slope stability transect locations were defined in areas with homogeneous topographic features and the slope stability analysis used actual bathymetry for each transect.
Grilli et al, 2009concluded that, for most locations, the overall coastal hazard resulting from 100-year and 500-yearsubmarine landslide generated tsunamis was relatively low and similar to a typical 100-year stormsurge in the region, roughly 13 to 16.5 feet in the study region (USACE, 2002). For the 500-year returnperiod tsunami, Grilli et al, 2009 presented two regions of relatively elevated hazard:1) near Long Island, NY with a peak run-up of 10 ft (3 m); and2) near the New Jersey coast, with a peak run-up of 13 feet and peak breaking wave height of 20to 23 feet at breaking distances (from the coastline) of about 800 to 1000 feet.The most notable submarine landslide complex along the U.S. Atlantic continental margin is theCurrituck Landslide, located off the coast of North Carolina.
Geist et al, 2009 describes the complex asone of the "largest landslides along the North American Atlantic offshore margin Geist et al, 2009modeled the Currituck Landslide tsunami event in detail. Results of this modeling showed largevariation in both the maximum runup and near shore wave amplitude at a location broadside ofCurrituck Landslide.
The maximum wave runup at Currituck Banks ranged from about 4 to 29 feet,while the near shore wave amplitude at the same location ranged from approximately 9.8 to 22.9 feet.Results from the three different slide scenarios at a shore location are shown in Figure 3.6-5.Owing to both its similarity in mechanism and nature to most of the other SMFs observed along theNorth American Atlantic margin (See Figure 3.6-3), the Currituck Landslide is a relevant SMF tsunamihazard assessment for the coastal region near the Hudson River mouth. In the absence of moreaccurate site-specific field data, the Currituck Landslide is typically used by NOAA as a proxy for thedeterministic source of maximum probable SMF tsunami, to compute tsunami hazard maps along theupper U.S. East coast.Far-field Tsunamigenic SourcesDue to the location of the Hudson River mouth on the U.S. northeast coast, IPEC may be impacted bytsunamis generated by far-field sources.
Grilli et al, 2011 identified the following discussions of far-field tsunamigenic sources that could impact the Hudson River mouth.Subaerial and Submarine Landslides:
The most notable far-field landslide source results from thepossible large scale flank collapse of the Cumbre Vieja, a volcano on La Palma in the Canary Islands.Abadie et al. (Abadie et al 2009, 2012, 2011) and Harris et al. (Harris et al, 2012), as part of the workcompleted for NOAA-NTHMP, recomputed both the tsunami generation and near-field and far-field propagation to the US East Coast, for Cumbre Vieja source. The maximum tsunami elevations for theU.S. East Coast, from a 19 mi3 slide scenario, presented in Figure 3.6-6, show some of the highesttsunami elevations (on the order of 10 feet) occurring off of northern New Jersey and Long Island.They found that, for the extreme case of 108 mi3, waves of 26 to 33 feet in height could reach thecontinental shelf at some locations in the general area of the Hudson River mouth. Propagation overthe shelf, however, which is site-specific by nature, caused significant dissipation through breaking ofthese waves, reducing their coastal impact.Azores-Gibraltar Convergence Zone: The Azores-Gibraltar convergence zone is another significant tsunamigenic source in the Atlantic basin. There are numerous potentially active faults within theconvergence zone, including the Gorringe Bank Fault, the Marque de Pombal Fault, the St. VincenteFault, and the Horseshoe fault. Those faults are presently active and collectively a source of some ofthe largest historical earthquakes and tsunamis in the Atlantic Ocean, including the 1755 Great LisbonEarthquake and tsunami (Grilli et al, 2011).Page 3-139 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3From historical
- records, it is known that the 1755 Great Lisbon Earthquake, along with its ensuingtsunami, caused waves of 16.4 to 49.2 feet along the southwest coast of Iberia and Morocco.
Runupfrom the trans-oceanic tsunami was documented in the Caribbean, Brazil, and Newfoundland.
Therewere no reports documenting flooding or runup along the U.S. East Coast, despite the presence of lowlying population centers along the U.S. and Canadian Atlantic coasts at the time (Grilli et al, 2009;NGDC, 2012). AGMTHAG, 2008 suggests that the lack of historic runup reports along the U.S. EastCoast may be due to the broad continental shelf, which contributed to dissipation.
Additionally, theGorringe Bank and the Madeira-Tore Rise (MTR) appear to have acted as topographic
- scatters, protecting most of the U.S. East Coast (AGMTHAG, 2008). Mader, 2001 employed the nonlinear SWAN model to simulate the 1755 Lisbon earthquake using a location near the Gorringe Bank.Mader's model simulations showed that the U.S. East Coast could have received maximum deep watertsunami wave amplitudes of 6.6 feet with a runup of approximately 10 feet.Barkan et al., 2009 performed additional simulations to assess tsunami hazard to the U.S. East Coastfrom potential future earthquakes along the Azores-Iberia plate boundary west of the Madeira-Tore Rise (MTR) or in the Gulf of Cadiz would only produce deep water tsunami amplitudes of roughly 0.26feet off the coast of New York (Barkan, 2009). Furthermore, tsunamis generated by earthquakes in theGulf of Cadiz would produce maximum wave amplitudes less than 1.3 feet (0.4, m) along the NewJersey and New York coastlines (AGMTHAG, 2008).Caribbean Subduction Zone: The Caribbean region is characterized as an active seismic area and isassociated with a large number of past tsunamis.
The Caribbean plate is bounded to the north by amajor transform fault at the boundary with the North American plate and to east by the large andsubducting South American plate. Its movement with respect to the North American plate causesvolcanic eruptions and earthquakes in the region (Grilli et al, 2011; Zahibo et al, 2001). The PuertoRico Trench (PRT) is the Caribbean fault that is most likely to cause tsunamis that could reach the U.S.Atlantic coast because of its location and east-west orientation (Grilli et al, 2011). The lack of a largeearthquake in the PRT in recent history and evidence of internal stress-build up in the nearbysubduction zone indicate that a large and potentially tsunamigenic earthquake in the trench may beimminent (Grilli et al, 2011).Due to potential for a large event, Knight, 2006 developed a first-order estimate of the most extremeearthquake that could occur in the PRT, a magnitude 9.1 earthquake resulting in an average slip of 39feet (Grilli et al, 2011). Knight also assessed the resulting potential tsunami hazard. He demonstrated that wave arrivals resulting from an earthquake occurring in the Puerto Rico trench along the Atlanticcoast have leading elevations with amplitudes up to 5 feet in Atlantic City, NJ and 2.2 feet in Montauk,NY. Knight noted that the far-field tsunamis generated from earthquakes in the Caribbean Sea causehigher amplitudes along the Gulf coast than the Atlantic coast due to dissipation through the GreaterAntilles Islands.
Grilli et al, 2010 performed a study for both an extreme (magnitude 9.1) and a smaller(magnitude 8.7) earthquake (which, based on limited historical
- records, were estimated to correspond to 600 and 300-year return periods, respectively) along the Puerto Rican Trench. Their results suggestthat a tsunami resulting from the extreme 9.1 magnitude earthquake could cause a maximum runup of6.6 to 9.8 feet in most locations along the upper U.S. East Coast. Grilli et al, 2012 also examine asimilar extreme 9.0 magnitude earthquake and also show the results on a low resolution regional grid,which is shown to cause a maximum tsunami elevation up to about 3 feet along the continental marginoff of New York.In summary, the results of the Regional Screening Test did not identify any historical tsunami impacts(runup heights greater than 2 to 3 feet). Several near field and several far field sources were identified that, under very conservative assumptions, could result in tsunamis that affect the coastal area in thePage 3-140 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3vicinity of northern NJ and Long Island. Preliminary, deterministic first-order models, conservatively assuming "worst case" failures at each of these sources indicated the following:
For near-field tsunamigenic
- sources, slope stability calculations for the 500-year return period tsunami,Grilli et al, 2009 identified two regions of relatively elevated hazard due to submarine mass failures(SMF) along the continental shelf:1) near Long Island, NY with a peak run-up of 10 ft; and2) near the New Jersey coast,with a peak run-up of 13 feet and peak breaking wave height of 20 to 23 feet at breaking distances (from the coastline) of about 800 to 1000 feet. These regions were also identified in Krause, 2011 ashaving elevated hazard; however runup was estimated on the order of 16 to 20 feet. The most notablesubmarine landslide complex along the U.S. Atlantic continental margin is the Currituck Landslide, located off the coast of North Carolina.
The Currituck Landslide is often conservatively used by NOAAas a source for the deterministic analysis of SMF tsunami impact at specific sites along the U.S. EastCoast, even if they are not located across from the actual Currituck Landslide.
The maximum modeledwave runup at Currituck Banks ranged from about 4 to 29 feet, while the near shore wave amplitude atthe same location ranged from approximately 9.8 to 22.9 feet.The Hudson Canyon is a major feature of the continental slope and rise offshore of New York. Due tothe Hudson River Canyon bathymetry, long tsunami waves from the far-field sources are expected tosignificantly refract away from the Hudson River Canyon, reducing their propagation toward the HudsonRiver (Harris et al, 2012), and thereby the tsunami risk to the Hudson River.For far-field tsunamigenic sources the following potential sources were identified:
- a. Cumbre Vieia Volcano (Canary Islands):
The maximum modeled tsunami elevations rangedfrom about 10 feet to 33 feet occurring offshore of northern New Jersey and Long Island(Abadie et al, 2012). The models indicated that propagation over the continental shelf causedsignificant dissipation through breaking of these waves, reducing their coastal impact.b. Azores-Gibraltar Convergence Zone: Modeled tsunami elevations and runup are insignificant inthe vicinity of northern NJ and Long Island (Abadie et al, 2010).c. Caribbean Subduction Zone: Modeled tsunami elevations and runup are insignificant in thevicinity of northern NJ and Long Island (Grilli et al, 2012).3.6.2.2 Site Screening TestDue to the significant distance of IPEC from the coast (about 60 miles) as well as the significant topographic relief present between IPEC and the coast, inundation in the vicinity of IPEC will not occurdue to coastal tsunami run-up. Propagation of tsunami waves in rivers and estuaries is complex andrequires site-specific modeling using a numerical model that is able to simulate nonlinearity, dispersion, and dissipative processes such as breaking and bottom friction.
- However, by inspection, significant attenuation of waves (or bores) propagating up the river will occur before reaching IPEC. The following observations on the hydraulic condition of the river are made (see Figure 3.6-1):* Waves propagating from the Lower Bay to the north pass through a constricted channel separating the New York Harbor and Lower Bay (the Narrows).
The Narrows is about 1 mile wide, with a deep(up to about 80 feet), 1/2 mile wide channel.Page 3-141 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3* The Narrows opens up to New York Harbor, a basin of about 5 miles length and 2.5 miles width,with depths ranging from about 2 feet to 40 feet, and typically about 20 feet. The land adjacent toNew York Harbor is the one portion of the river where significant overland flow can occur and thewidth of the area (including the harbor) characterized by elevations lower than 20 feet is about 5 to6 miles (for the entire length of the harbor).
This would be anticipated to reduce wave amplitude.
- At the north end of New York Harbor (the Battery),
the Hudson River begins to become a definedriver channel and continues as such for about 25 miles to the north of the Battery, maintaining achannel width of about 1 mile. Additional attenuation of waves would be anticipated to occur withinHaverstraw Bay." The IPEC site is located on the east shoreline of the Hudson River (looking upstream) andtherefore, the potential for impacts from a bore moving upstream are minimal." Subcritical flow conditions are also expected throughout the Hudson River owing to its significant depth and mild (or adverse) bottom slope.The results of this qualitative site screening analysis indicate that significant amplitude attenuation willlikely occur along the river, between the Lower Bay and IPEC (see Figure 3.6-1) and significant backwater effects are not expected at the location of IPEC, 60 miles from the ocean shoreline.
Therefore, tsunami is not expected to be a significant contributor to flooding at IPEC, nor the controlling flood hazard.3.6.3 Conclusions A probable maximum tsunami event is not considered to be a significant flood hazard for IPEC for thefollowing reasons:* The results of the Regional Screening Test indicate that the likelihood of a significant tsunamialong the U.S. East Coast is low. Review of the NOAA NGDC tsunami database (NGDC, 2012)did not identify any documented, historic tsunami events along the U.S. East Coast that resultedin significant, historical tsunami impacts (runup heights greater than 2 to 3 feet).* Due to the presence of the Hudson Canyon, tsunami waves from the far-field sources areexpected to significantly refract away from the Hudson River Canyon, reducing their propagation toward the Hudson River and thereby the tsunami risk to the Hudson River. As a result, theevent resulting in the probable maximum tsunami will likely be a near-field SMF along thecontinental shelf.* Due to the significant distance of IPEC from the coast (about 60 miles) as well as the significant topographic relief present between IPEC and the coast, inundation in the vicinity of IPEC will notoccur due to coastal tsunami run-up." By inspection of the river geometry and IPEC's distance from the coast, it appears thatsignificant attenuation of waves (or bores), should any propagate up the river, will occur beforereaching IPEC.Page 3-142 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.6.4 References Abadie et al, 2009. "3D Numerical Simulations of Waves Generated by Subaerial Mass FailuresApplication to La Palma Case", Abadie S., Gandon, C., Grilli, S., Fabre, R., Riss, J., Tric, E., Glockner, S., In J. McKee Smith (Ed.), Proceedings of the 31st International Engineering Conference (pp. 1384 -1395), Hamburg, Germany:
World Scientific Publishing, 2009.Abadie et al, 2011. "Numerical Simulation of tsunami generation by the potential flank collapse of theCumbre Vieja Volcano",
Abadie, S., Harris, J., & Grilli, S., Proceedings of the Twenty-first (2011)International Offshore and Polar Engineering Conference (pp. 687-694),
Cupertino, CA: International Society of Offshore and Polar Engineers, 2011.Abadie et al, 2012. "Numerical modeling of tsunami waves generated by the flank collapse of theCumbre Vieja Volcano (La Palma, Canary Islands):
Tsunami source and near field effects",
Abadie, S.,Harris, J. C., Grilli, S. T., & Fabre, R., Journal of Geophysical
- Research, 117, 1-26, 2012.AGMTHAG, 2008. "Evaluation of Tsunami Sources with the Potential to Impact the U.S. Atlantic andGulf Coasts -An Updated Report to the Nuclear Regulatory Commission",
Atlantic and Gulf of MexicoTsunami Hazard Assessment Group (AGMTHAG),
U.S. Geological Survey, 2008.ANSI/ANS-2.8, 1992. "American National Standard for Determining Design Basis Flooding at NuclearReactor Sites", American National Standards/American Nuclear Society, ANSI/ANS-2.8-1992.
AREVA, 2013a. "Indian Point Energy Center Flood Hazard Re-evaluation
-Tsunami Screening Analysis",
AREVA Document No. 51-9196310-000, 2013.Barkan et al, 2009. "Far field tsunami simulations of the 1755 Lisbon earthquake:
Implications fortsunami hazard to the U.S. East Coast and the Caribbean",
Barkan, R., ten Brink, U. S., & Lin, J.,Marine Geology, 264, 109-122, 2009.Geist et al, 2009. "Hydrodynamic modeling of tsunamis from the Currituck landslide",
Geist, E. L.,Lynett, P. J., & Chaytor, J. D., Marine Geology, 264, 41-52, 2009.Grilli et al, 2009. "A probabilistic approach for determining submarine landslide tsunami hazard alongthe upper east coast of the United States",
Grilli, S., Taylor, O.-D. S., Baxter, C. D., & Maretzki, S.,Marine Geology, 264, 74-97, 2009.Grilli et al, 2010. "Numerical simulation and first-order hazard analysis of large co-seismic tsunamisgenerated in the Puerto Rico trench: near-field impact on the North shore of Puerto Rico and far-field impact on the US East Coast", Grilli, S. T., Dubosq, S., Pophet, N., Perignon, Y., Kirby, J. T., & Shi, F.,Natural Hazards and Earth System Sciences, 10, 2109-2010, 2010.Grilli et al, 2011. "Literature review of tsunami sources affecting tsunami hazard along the U. S. EastCoast", Grilli, S. T., Harris, J. C., & Tajalli Bakhsh, T., Center for Applied Coastal Research, University of Delaware, 2011.Grilli et al, 2012. "Status of : Modeling Tsunami Inundation and Assessing Tsunami Hazards for theU.S. East Coast", Grilli, S. T., & Kirby, J. T., NTHMP, National Weather Service Program Office, 2012.Harris et al, 2012. "Near- and Far-field Tsunami Hazard from the Potential Flank Collapse of theCumbre Vieja Volcano",
Harris, J. C., Grilli, S. T., Abadie, S., & Tajalli Bakhsh, T., Proceedings of theTwenty-second (2012) International Offshore and Polar Engineering Conference (pp. 242-249),
Rhode,Greece: International Society of Offshore and Polar Engineers (ISOPE),
2012.Knight, 2006. "Model predictions of Gulf and Southern Atlantic coast tsunami impacts from adistribution of sources",
Knight, B., Science of Tsunami Hazards, 24(5), 304-312, 2006.Page 3-143 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Krause, 2011. "Probabilistic tsunami hazard assessment to the United States East Coast", Krause, T.,MS Thesis, University of Rhode Island, Department of Civil Engineering, 2011.Mader, 2001. "Modeling the 1755 Lisbon Tsunami",
Mader, C. L., Science of Tsunami Hazards, 19(2),93-98, 2001.NGDC, 2012. "Data Retrieval
-NOAAA/WDC Tsunami Runup", NOAA National Geophysical DataCenter, retrieved November 8, 2012,http://www.ngdc.
noaa.gov/nndc/struts/form?t=
101650&s=
167&d= 166, see AREVA Document No. 51-9196310-000.
NRC, 1976. "Regulatory Guide 1.102 -Flood Protection for Nuclear Power Plants, Revision 1", U.S.Nuclear Regulatory Commission, 1976.NRC, 1977. "Regulatory Guide 1.59 Design Basis Floods for Nuclear Power Plants, Revision 2", U.S.Nuclear Regulatory Commission, 1977.NRC, 2007. "NUREG-0800:
Standard Review Plan for the Review of Safety analysis Reports forNuclear Power Plants",
U.S. Nuclear Regulatory Commission, revised March 2007.NRC, 2009. "NUREG/CR-6966:
Tsunami Hazard Assessment at Nuclear Power Plant Sites in theUnited States of America",
U.S. Nuclear Regulatory Commission, Pacific Northwest NationalLaboratory, 2009.NRC, 2011. "NUREG / CR -7046: Design Basis Flood Estimation for Site Characterization at NuclearPower Plants",
U.S. Nuclear Regulatory Commission, November 2011.NTHMP, 2012. "National Tsunami Hazard Mitigation Program Data Retrieval",
retrieved November2012, http://nthmp.tsunami.gov/index.html, see AREVA Document No. 51-9196310-000.
Twichell et al, 2009. "Morphology of late Quaternary submarine landslides along the U.S. Atlanticcontinental margin",
- Twichell, D. C., Chaytor, J. D., ten Brink, U. S., & Buczkowski, B., Marine Geology,264, 4-15, 2009.USAGE, 2002. "Estimation of Nearshore Waves", U.S. Army Corps of Engineers, U.S. CoastalEngineering Manual Part II, Chapter 3, April 2002.Whitmore et al, 2009. "NOAA/West Cpoast and Alaska Tsunami Warning Center Atlantic Oveanresponse Criteria",
- Whitmore, P., ten Brink, U., Caropolo, M., Huerfano-Moreno, V., Knight, W.,Sammler, W., & Sandrik, A., Science of Tsunami Hazards, 28,86-107, 2009.Zahibo et al, 2001. "Evaluation of tsunami risk in the Lesser Antilles",
Zahibo, N., & Pelinovsky, E. N.,Natural Hazards and Earth System Sciences, 1, 221-231, 2001.Page 3-144 AAR EVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.6-1: Historic Tsunami Run-up events along the U.S. East coasteference NGDC, 2012)Run-up MaximumHeight Maximun Run- Run-upDate Time Validity Source Source Location Run-up Location along the U.S. East Coast Measurement Type (nm) up Location Height (m)1110111755 8!50 Defiit Earthqutak Lusiton Portugal-Lagos, Portugal 30(30.-,L88.67 "l W)09/24/1848
-Probable Landslide Fishing Ships Harbor,Newfoundland, Canada06/27'1864 2230 Probable Earthquake SWAvalon Penila .--Nefwln, Cwand09/01/1886 2:51 Definite Earthquake Charleston, SC Jacksonville, FL (30.317"N,81.65"W)
Water heightmeasurement Mayport FL (30.39"N,81.43"W)
Copper River, SC {32.87"N,7993"W) 09/01/1895 11:09 Probable Earthquake HifghBridge, NJ LongIl~andt, NY(40.591N,73,79M Water height -measreent 12/06/19172 13:04 Definite Explosion
- Halifax, Nova Scotba Bedford, Nova Scota (44.729'N, 63.664"W)
- Halifax, Nova 7ScotiaDartmouth, Nova Scota (44,667"N, 63,583"W)
(44,633N,
- Halifax, Nova Scotia (44.633"N, 63.583¶W) 7 63,583"W)
Tufts Cove, Nova Scotia (44.68"N, 63.6W)'Turtle Grove, Nova Scotia (44.68"N, 63.6"W)10/11/1918 14:14 Defnite Earthquake Puto Rimo (PR),Mona Aantc city, NJ (39364N,74A423VWM Tide-gagemeassuwemut 0.06 POWta U.1Passage Agujimaeda PR(18.51'N,7.167 1111811929 20:32 Definite Earthquake
& Grand Banks, Newfoundland, Ocean City, MD (38,333"N,75.083'W)
Tide-gage measurement 0.3 Taylor's Bay, 7Landslide Canada Newfoundland Atlantic City, NJ (39.35°N,74.417W) 0.6 (46.883,N,54.26 Charleston, SC (32.75"N,79.916W) 012 7W)2 Although the tsunami of 1917 is considered definite by the NGDC, it was not caused naturally.
The tsunami was the result of an explosion that occurred from the collision of two ships in the Narrows of HalifaxHarbour.Page 3-145 AAREVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Run-up MaximumHeight Maximum Run- Run-upDate Time Validity Source Source Location Run-up Location along the U.S. East Coast Measurement Type (m) up Location Height (m)0&%1946 17:51 Dfnt Eardtqu**
Nottern Coast Daytoa Beach, FL (29 20,K81.017*
Ttgage meamenut
-Rio Boba. DR 5Dominica Republ(R)
(19A67N,69,86 Awllatc City, NJ (39.364*N,74,423*W)
Nagua DR 5(19.417N,69A.81
.. .. 7*WM08/0811946 13:28 Definite Earthquake Northeastern Coast Daytona Beach, FL (29.21"N.81.02Vi)
Tide-gage measurement San Juan, PR 0.6Dominican Republic (DR) (18.483"N,66.13 Attanbc City, NJ (39.364"N,74.423W) 3"W)0O/19964 0:10 probale Landslde
- LngIland, NY Mo NY (41.03317t.0950)
Tide-gagemeasureent 0.1 Plum IalancNY 0.28... .. ...t. .NY... ..... ....1 ) (41181"N,72.19 Plu Island N(4 81'N.72.194*M0.8
)WWUlltts Point, NfY(40,683'N73.283*W) 0.1 W.Newp.t RI (41Ai93-N,71,327.W) 0.112/26/2004 0:58 Definite Earthquake Off Sumatra, Indonesia Trident Pier, FL (28.415*N,80,593"W)
Tide-gage measurement 0.17 Indonesia (entre 50.9-country)Atlantc City, NJ (39.35"N.74.417"W) 0.11Cape May, NJ (38.97°N,74.96"W) 0.0610/28/20080 Probablie Unkinown Maline Bootltbay Harbor, MiE (3.8523N,69.6281'M~
Eyewiteas 3.6 Bootttbay 3.6Measurement Hbor, MEB...o,. ME(43.95.-N w) 6I5MPortlan ME (43642'N, 70.85', Tidegage meuremnt 0.1Soautpoti ME (43.833°N, 69.65'W)
-Fort Point NH (4.072W, 7o.712-W)
Tid.gegmeaurement 0,06Page 3-146 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.6-1: Location of IPEC relative to Hudson River features and the continental slopePage 3-147 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.6-2: Potential tsunami source locations for the U.S. East coast in the North AtlanticOcean basinPage 3-148 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 375 W70W65W40is-40 N-35 N200 300 400 500751W 70 W65WFigure 3.6-3: Shaded relief map of the East Coast of the U.S. with interpretation showing the 48landslide areas mapped by AGMTHAG (AGMTHAG, 2008)Page 3-149 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 38200'O"W 80*0'0"W 780',W 7600'01W 740,0.W 72007WFigure 3.6-4: The additional 46 shelf transects used in Krause (Krause, 2011) each used for15,000 stochastic stability analyses of submerged slopesPage 3-150 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Et C~ (~i '- 0 -N 4(w) dwu0:18..................t 1UU~ 0 N~ -0 7 N(w) -dwu070C.10COruto It CY(w) *duna C ITvFigure 3.6-5: Time series of tsunami amplitude at a nearshore location broadside of theCurrituck Landslide for the three different slide scenarios.
(a) volume =108 km3; (b) volume =57 km3; (c) volume =128-168 km3 (Geist et al, 2009)Page 3-151 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3E2to 00CN-4I0-4O 0z n zI. ZN N 'NC=NEC,7 CYJ 1VME0 N 9 03:AX3'0Nz Z z* -* 01 N4" n'z z z zZ*- N 0 D '0r"~ 0Vf N NFigure 3.6-6: Maximum surface elevation computed with FUNWAVE in 30" regional grids for the19 mi3 CW case (Harris et al, 2012).The regional grids include N. North America (top left), S. North America (bottom left), Western Europe(top right), and Western Africa (bottom right)Page 3-152 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.7 Ice-Induced FloodingThis section addresses the effects of ice-induced flooding on the water surface elevation at Indian PointEnergy Center (IPEC).The Hudson River forms the western boundary of the site. IPEC is located on the east bank of theHudson River in Buchanan, New York, approximately 2.2 miles southwest of Peekskill, New York, and40 miles north of New York City3.7.1 MethodThe hierarchical hazard assessment (HAA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of ice-induced flooding on water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011). Thus, the flood elevations herein areconservative and intended to demonstrate the safety of SSC against ice-induced
- flooding, and notintended to represent the most realistic estimation of flood elevations due to ice-induced flooding.
The HHA approach is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and3. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992)The criteria for ice-induced flooding is provided in NUREG/CR-7046, Appendix D (NRC, 2011). Twoice-induced events may lead to flooding at the site and are recommended and discussed inNUREG/CR-7046, Appendix D including:
- a. Ice jams or dams that form upstream of a site that collapse, causing a flood wave; andb. Ice jams or dams that form downstream of a site that result in backwater flooding.
With respect to ice-induced flooding on the Hudson River, the HHA used the following steps:1. Identify largest historic ice-induced flooding event and calculate water depth.2. Conservatively calculate peak water surface elevation resulting from failure of upstream ice jam.3. Conservatively calculate peak water surface elevation from backwater effects resulting from adownstream ice jam.Page 3-153 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.7.2 Results3.7.2.1 Ice-Induced Flooding (AREVA, 2013a)3.7.2.1.1 Identify largest historic ice-induced flooding event and calculate water depthRecords of historic ice jam flood stages were downloaded from the U.S. Army Corps of Engineers (USACE) ice jam database (USACE, 2013). The largest historic ice-induced flooding event occurredMarch 23, 1948 at Hadley, NY, 180 miles upstream of IPEC. The resultant calculated flood stage waterdepth behind the ice jam was 11.35 feet.3.7.2.1.2 Calculate peak water surface elevation resulting from failure of upstream ice jamThe peak water surface elevation at IPEC was calculated for an ice jam forming and breaching at BearMountain Bridge, the first bridge upstream of IPEC. The peak flood wave height was conservatively kept constant (i.e., did not allow for attenuation as the flood wave traveled 4.32 river miles southerly ordownstream to IPEC). The resultant peak water surface elevation at IPEC was considered to be equalto the mean tide elevation at IPEC combined with the water depth of the peak flood wave from theupstream ice jam failure.The ice jam at Bear Mountain Bridge was conservatively considered to be equivalent to the largesthistoric ice jam recorded at Hadley, New York (11.35 feet high). This is conservative because there areno historic ice jams south of Albany, NY, which is approximately 100 miles upstream of IPEC.The mean tide elevation was selected as the reference
/ antecedent water surface elevation becauseunder high tide conditions the Hudson River flows south to north and would convey ice northward.
Mean tide elevation was conservatively selected over mean low tide elevations.
The mean tideelevation at IPEC was approximately 1.13 feet. The peak water surface elevation at IPEC resulting from the upstream ice jam breach was therefore calculated to be 11.35 feet plus 1.13 feet which equals12.48 feet, or 2.77 feet below the maximum allowable surface water elevation at IPEC. (IPEC, 2010and IPEC, 2011)3.7.2.1.3 Estimate peak water surface elevation from backwater effects resulting from adownstream ice jamPeak water elevation was estimated for an ice jam forming at Tappan Zee Bridge, the first bridgedownstream of IPEC (about 15.6 river miles south or downstream of IPEC). Peak flood height at IPECwas considered to be equal to the top elevation of the downstream ice jam. The resultant peak watersurface elevation at IPEC was equal to the mean tide elevation at IPEC (described above) combinedwith the water depth of the backwater from the ice jam.Similar to Section 3.7.2.1.2, the ice jam at Bear Mountain Bridge was conservatively considered to beequivalent to the largest historic ice jam recorded at Hadley, New York (11.35 feet high).The peak water surface elevation at IPEC resulting from backwater as the result of a downstream icejam was 12.48 feet, or 2.77 feet below the maximum allowable surface water elevation at IPEC. (IPEC,2010 and IPEC, 2011).3.7.3 Conclusions The peak water surface elevation at IPEC, resulting from the upstream ice jam / ice dam breach wasconservatively calculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMFpeak water surface elevation of the Hudson River at IPEC of 14.6 feet (AREVA, 2013b).Page 3-154 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The peak water surface elevation at IPEC as a result from backwater caused by the ice jam wascalculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMF peak watersurface elevation on the Hudson River at IPEC of 14.6 feet (AREVA, 2013b).These results presented above are considered to be conservative in that they are based on an historicice jam which occurred far to the north and it is unlikely that a larger ice jam would occur on the tidalportion of the Lower Hudson River. The potential for any ice jam in the vicinity of IPEC is judged to beremote because the closest reported ice jam occurred in Albany approximately 100 miles upstream in1857.Ice-induced flooding is not specifically included as a mechanism to be combined with other extremeevents as per NURGE/CR-7046 (NRC, 2011).3.7.4 References AREVA, 2013a. "Ice-Induced Flooding",
AREVA Document No. 32-9196322-000, 2013.AREVA, 2013b. AREVA Document No. 32-9196316-000, "Probable Maximum Flood on Hudson River-Hydraulics",
- January, 2013.IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
IPEC, 2011. "Indian Point 3 Updated Final Safety Analysis Report Revision 04", Entergy, 2011, SeeAREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011. (ADAMS Accession No.ML11321A195)
USACE, 2013. U.S. Army Corps of Engineers (USACE),
Ice Engineering Research Group, ColdRegions Research and Engineering Laboratory, Website:
http:icejams.crrel.usace.army.mil/,
accessedJanuary 2013, See AREVA Document No. 32-9196322-000.
Page 3-155 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.8 Channel Migration or Diversion Natural river channels may migrate or divert either away from or toward the site. The relevant event forflooding is diversion of water towards the site. There are no well-established predictive models forchannel diversions.
Therefore, it is not possible to postulate a probable maximum channel diversion event. Instead, historical records and hydrogeomorphological data should be used to determine whether an adjacent
- channel, stream, or river has exhibited the tendency to meander towards the site.(NRC, 2011).3.8.1 MethodThe channel migration and diversion flooding evaluation followed the HHA approach described inNUREGCR-7046, Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants inthe United States of America (NRC, 2011). The HHA approach used is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977;3. NUREG/CR-7046
-Design Basis Flood Estimation for Site Characterization at Nuclear PowerPlants in the United States of America, dated November 2011; andWith respect to channel migration and diversion, the HHA used the following two steps:1. Review historical records and hydrogeologic data to assess whether the Hudson River exhibitsthe tendency to migrate towards the site.2. Evaluate present-day channel maintenance measures in place to mitigate channel migration ofthe Hudson River.3.8.2 Results3.8.2.1 Review of Historical Records (AREVA, 2013)A literature review did not yield evidence suggesting there have been significant historical diversions ofthe Hudson River near Indian Point Energy Center (IPEC) over the last century.
A comparison of 1892(UNH, 2012) and 1981 (NY GIS, 2012b) USGS Topographic maps illustrates continuity of the rivercourse over the last 120 years.The Lower Hudson Valley has been subjected to repeated glacial advance and retreat, creating typicalglacial morphology of main and tributary valleys and bedrock ledges (Sirkin, 2006). The glaciers havecontrolled the deposition of unconsolidated deposits in the region, although these are absent locallydue to erosion and excavation (GZA, 2008). Glacial till lies directly on the bedrock surface and isgenerally less than 10 feet thick, but is locally thicker against steep north-facing bedrock slopes (GZA,2008). The Lower Hudson River Valley exhibits characteristics of a fjord within the high rock walls ofthe highlands (Sirkin, 2006).Page 3-156 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The site slopes downward relatively steeply towards the Hudson River and is characterized by groundsurface elevations ranging from approximately 15 to 60 feet MSL. Much of the critical shoreline at theIPEC site is composed of vertical steel sheet pile, but some portions of the southern shore are relatively steep, riprap covered slopes. As illustrated on Figure 6.18 from the Hydrogeologic Site Investigation (GZA, 2008), the majority of the critical structures are founded on bedrock;
- however, several structures including the intake structures are located along the shoreline in the overburden material.
This sectionof shoreline is protected from the river with the vertical steel sheet pile walls. It is therefore unlikely thatthe shoreline would erode and the Hudson River divert through the site.The steep slopes and glacial lake clay soil deposits of the land surrounding the Hudson River valleynear IPEC offer the potential for landslides.
The area is considered to be an area of high landslide incidence (NYSOEM, 2011). The Hudson River is approximately 3,500 feet wide about 2.5 milesupstream of IPEC. The maximum river depth in this area is approximately 70 feet (NY GIS, 2012a).While a landslide near IPEC is possible, a large landslide involving the substantial volume of materialneeded to cutoff and divert the Hudson River is unlikely.
No evidence of landslide induced channeldiversion near IPEC was found during the literature review.3.8.2.2 Evaluation of Present Day Channel Maintenance The U.S. Army Corps of Engineers, New York District performs maintenance dredging of the HudsonRiver federal navigation
- project, as necessary to maintain the authorized project dimensions, therebyassuring safe and economical use of the Hudson River by shipping interests.
The navigational channelnear IPEC is 600 feet wide, (from New York City to Kingston),
with depths of 32 feet in soft material and34 feet in rock (USACE, 2012).3.8.3 Conclusions A review of historical data indicates that the Hudson River has not exhibited a tendency to meandertowards the site. The Hudson River is a maintained, navigable waterway near IPEC and the U.S. ArmyCorps of Engineers, New York District is responsible for maintaining navigable conditions throughperiodic dredging.
Much of the critical shoreline at the IPEC site is composed of vertical steel sheet pilewall, but some portions of the southern shore are relatively steep, riprap covered slopes. As perNUREG / CR-7046, stream channels that are steeply incised, have limited flood plains, and are locatedin geologic formations relatively resistant to erosion would not be expected to be susceptible to channeldiversion.
Given these conditions, channel migration is not considered to be a potential contributor toflooding at IPEC.3.8.4 References AREVA, 2013. "Indian Point Energy Center Flood Hazard Re-evaluation
-Channel Migration orDiversion",
AREVA Document No. 51-9196309-000, 2013.GZA, 2008. "Hydrogeologic Site Investigation",
GZA GeoEnvironmental, Inc., January 2008.NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011.NY GIS, 2012a. Hudson River Estuary Bathymetry Polyline
- Contours, New York State GISClearinghouse, http://gis.ny.gov/gisdata/inventories/details.cfm?DSID=
1136, accessed 2012, seeAREVA Document No. 51-9196309-000.
Page 3-157 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3NY GIS, 2012b. "1981 Peekskill Quadrangle, 1:24,000 Quadrangle, U.S. Geologic Survey, New YorkState GIS Clearinghouse, http:/lgis.ny.gov/gisdata/quads/drg24/indexquadname.htm#W, accessed2012, see AREVA Document No. 51-9196309-000.
NYSOEM, 2011. "2011 New York State Standard Multi-Hazard Mitigation Plan -Chapter 3.13Landslide hazard Profile",
New York State Office of Emergency Management, 2011.Sirkin, 2006. "The Hudson River Estuary -Chapter 2 -The Hudson River Valley Geological History,Landforms, and Resources",
2006.UNH, 2012. "Historic USGS Maps of New England & NY", 1892 West Point, NY Quadrangle, http://docs.unh.edu/nhtopos/nhtopos.htm, accessed 2012, see AREVA Document No. 51-9196309-000.
USACE, 2012. "Hudson River, New York North Germantown Reach Federal Navigation ProjectMaintenance Dredging"
-New York District Public Notice, U.S. Army Corps of Engineers, March 13,2012.Page 3-158 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.9 Combined-Effect FloodThis section addresses the potential for flooding at Indian Point Energy Center (IPEC) due to combinedeffect flood events.3.9.1 MethodThe hierarchical hazard assessment (HHA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of combined flood events on water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011). Thus, the flood elevations herein areconservative and intended to demonstrate the safety of SSC against combined events flooding, and notintended to represent the most realistic estimation of flood elevations due to combined events flooding.
- 1. The HHA approach is consistent with the following standards and guidance documents:
- 2. NRC Standard Review Plan, NUREG-0800, revised March 2007;3. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and4. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992).The criteria for combined events floods are provided in NUREG/CR-7046, Appendix H and consist ofconsidering the following scenarios:
- 1. Floods Caused by Precipitation Events (NUREG/CR-7046, Appendix H, Section H.1)2. Floods Caused by Seismic Dam Failures(NUREG/CR-7046, Appendix H, Section H.2)3. Floods along the Shores of Open and Semi-Enclosed Bodies of Water(NUREG/CR-7046, Appendix H, Section H.3)4. Floods Caused by Tsunamis (NUREG/CR-7046, Appendix H, Section H.5)Tsunamis have been screened out as a potential flood mechanism at IPEC and therefore arenot subject to combined event flood analysis (AREVA, 2013c).The combined event evaluation for IPEC was conducted for the above applicable scenarios asdescribed in AREVA, 2013a for Floods Caused By Precipitation Events and Seismic Dam Failures andSection 3.4.2.5 and AREVA 2013d for Floods Along the Shores of Open and Semi-Enclosed Bodies ofWater and used the following steps:" Calculate the wind wave effects and wave runup on the Hudson River at IPEC.* Calculate the Probable Maximum Water Elevation on the Hudson River at IPEC resulting fromthe combined-effect flood.Page 3-159 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.9.2 ResultsThe results of the combined effect flood evaluation are summarized in Table 3.9-1. Floods along theShores of Open and Semi-Enclosed Bodies of Water (due to coastal storm surge) resulted in thehighest calculated combined flood elevation.
The potential combined effect scenarios are discussed below.Floods Caused by Precipitation Events (NUREG/CR-7046, Appendix H, Section H.1)Three alternatives for Floods Caused by Precipitation Events were evaluated in AREVA, 2013a. Thehighest flood level results from the peak water surface elevation on the Hudson River at IPEC due tothe Probable Maximum Flood (PMF) including hydrologic upstream dam failure, as described inAREVA,2013b.
The bounding stillwater elevation for flood events is 14.9 feet NGVD29. This scenario, with the inclusions of wave runup induced by 2-year wind speeds, is described as Alternative 3 ofSection H.1 of Appendix H of NUREG/CR-7046.
Floods Caused by Seismic Dam Failures(NUREG/CR-7046, Appendix H, Section H.2)The results of the dam failure calculation, (AREVA,2013b),
indicate that flood elevations from seismicdam failures (NUREG/CR-7046, Appendix H.2) resulted in a peak stillwater elevation of 13.5 feet atIPEC and is bounded by PMF with coincident hydrologic dam failure on the Hudson River that resultedin a peak stillwater elevation of 14.9 feet at IPEC. No overtopping of the shoreline bulkhead will occur.Therefore, further calculations to address NUREG/CR-7046 Appendix H.2 are not necessary.
Floods along the Shores of Open and Semi-Enclosed Bodies of Water (NUREG/CR-7046, Appendix H,Section H.3)As described in Section 3.4.2.5, Alternative 3 of Section H.3 of NUREG/CR-7046 (the combination ofthe 25-year flood in the stream, the probable maximum storm surge and seiche with wind-wave
- activity, and the antecedent 10 percent exceedance high tide) resulted in the highest flood elevation.
Probabilistic analysis of storm surge indicates that the storm surge flood elevation at IPEC associated with a 2x10-6 annual exceedance probability, including storm surge, tidal flow, projected sea level riseand steady-state river flow associated with a 25-year return period in the Hudson River, is elevation 14.8 feet NAVD88 (15.8 feet NGVD29).
The wave crest elevation is calculated to be 16.3 feet. Thelimit of wave run-up elevation is calculated to be 17.7 feet.3.9.3 Conclusions At IPEC, the bounding condition for impacts to the site from combined event on the Hudson Rivercombined with wind generated waves are summarized below.The wind generated wave crest applied along the critical direction on the Hudson River at IPEC wascalculated to be 0.5 feet (elevation 16.3 ft NGVD29);
and wave runup was calculated to be 1.9 feet(elevation 17.7 ft NGVD29).The bounding stillwater elevation for coastal flood events (the combination of the 25-year flood in thestream, the probable maximum storm surge and seiche with wind-wave
- activity, and the antecedent 10Page 3-160 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3percent exceedance high tide) is calculated to be 15.8 feet (AREVA, 2013d). This scenario, with theinclusions of wave runup induced by coincident wind speeds, is described as Alternative 3 of SectionH.3 of Appendix H of NUREG/CR-7046.
The Maximum Water Elevation resulting from combined events on the Hudson River at IPEC wascalculated as the sum of the bounding flood event (stillwater elevation 15.8 feet) and the coincident wind wave runup (0.5 feet). This Maximum Water Elevation resulting from combined coastal eventswas calculated to be elevation 17.7 feet.The results indicate that the combined effects flood maximum water elevation on the Hudson River atIPEC resulting from combined-effect flood is above the plant grade elevation of 15.0 feet (IPEC, 2010).3.9.4 References AREVA, 2013a. "Combined Events Flood Analysis
-Riverine",
AREVA Document No. 32-9196323-000, 2013.AREVA, 2013b. "Dam Failures",
AREVA Document No. 32-9196316-000, 2013.AREVA, 2013c. "Tsunami Screening Evaluation",
AREVA Document No. 51-9196310-000, 2013.AREVA, 2013d. "Flood Hazard Re-evaluation
-Combined Effect Floods -Coastal Processes forIndian Point Energy Center",
AREVA Document No. 32-9213356-000, 2013.IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011, (ADAMS Accession No.ML1 1321A195).
Page 3-161 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.9-1: Combined Effect Flood Scenario Summary ResultsScenario Stillwater (ft) Wave (ft)(e) Combined (ft)Floods Caused by 14.9 1.7 16.6Precipitation Events(e)
Floods Caused by 13.5 (a) (a)Seismic Dam FailuresFloods along the 15.8(b) 0.5 16.3/17.7 (c)Shores of Open andSemi-Enclosed Bodies of WaterFloods Caused by (d) (d) (d)TsunamisNotes:(a) Combined Event analysis not required.
Dam Failure is included in Flood Caused byPrecipitation Events(b) Based on estimated annual exceedance probability 2x10-6 storm surge event(c) Wave elevation/Limit of wave run-up(d) Effects of tsunamis were screened out as a controlling flood mechanism at IPEC(e) Waves for Precipitation Event are based on 2-year wind and are essentially deepwater wavesfor purposes of comparison with the waves calculated for the coastal surge which are based onhurricane winds.Page 3-162 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.0 COMPARISON OF CURRENT AND REEVALUATED FLOOD CAUSING MECHANISMS 4.1 Summary of Current Licensing Basis and Flood Reevaluation ResultsThis section compares the current and reevaluated flood-causing mechanisms.
It provides acomparison of the CLB flood elevation to the reevaluated flood elevation for each applicable flood-causing mechanism.
A comparison of the CLB elevations and the reevaluated flood elevations isprovided in Table 4.1-1.Screened mechanisms have been evaluated at a high level and determined to not be applicable to theflooding hazard for IPEC.4.1.1 Local Intense Precipitation 4.1.1.1 Current Licensing BasisThe CLB does not include an evaluation of LIP. Localized PMP was evaluated as part of IPEEE forUnit 2 and Unit 3, utilizing storm parameters presented in HMR-51 and HMR-52.The IPEEE evaluation for Unit 2 concluded that ponding could occur on the IPEC Unit 2 site, however,PMP related flood levels would not exceed the design allowable water buildup at safety-related SSC(IPEEE, 1995, IPEC, 2012a).The IPEEE evaluation for Unit 3 concluded that there were no pathways in the vicinity of safety-related SSC that would allow precipitation runoff to penetrate any buildings (IPEEE,1997).
4.1.1.2 Reevaluated Flood Elevation In the immediate vicinity of Unit 2, the maximum water surface elevations are up to elevation 19.0 feetin the transformer yard. The calculated flood elevation varies between 0 and 0.2 feet higher thanbuilding entrances abutting the Unit 2 Transformer Yard.In the immediate vicinity Unit 3 the maximum water surface elevations are up to elevation 19.2 feet inthe transformer yard. The calculated flood elevation does not exceed building entrances abutting theUnit 3 Transformer Yard.Details of this evaluation are provided in Section 3.1.4.1.1.3 Comparison As the CLB does not include localized PMP effects, direct comparison is not possible.
The new evaluation resultsin higher flood levels than the IPEEE evaluation, and results in impacts to safety-related SSC at Unit 2.4.1.2 Flooding on Rivers and Streams4.1.2.1 Current Licensing BasisThe PMF in the Hudson River with no tidal influences is defined in the Unit 2 FSAR as 1,100,000 cfs,resulting in a water surface elevation of 12.7 ft (IPEC, 2010).4.1.2.2 Reevaluated Flood Elevation The PMF in the Hudson River at IPEC after hydraulic routing within HEC-RAS is conservatively calculated at 1,185,300 cfs. Historical records do not indicate flooding in excess of this PMF flow.Page 4-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The peak PMF water surface elevation at Indian Point Energy Center is 14.6 feet, which is 0.4 feetbelow the plant grade elevation of 15.0 feet (IPEC, 2010 and IPEC, 2011).Based on the re-evaluated peak PMF elevation on the Hudson River at IPEC, the peak PMF watersurface elevation from the Hudson River flood is below the plant grade elevation.
Details of this evaluation are provided in Section 3.2.4.1.2.3 Comparison The results of the new evaluation are 1.9 ft higher than the CLB for PMF on the Hudson River. Theresulting PMF elevation remains below the site grade of 15.0 ft.4.1.3 Dam Breaches and Failures4.1.3.1 Current Licensing BasisThe CLB reports a failure of the Ashokan Dam coincident with a Standard Project Flood on the HudsonRiver to have a resulting flow rate of 705,000 cfs. The peak water elevation associated with this eventat IPEC is 7.2 ft (IPEC, 2010).4.1.3.2 Reevaluated Flood Elevation The controlling dam failure scenario is the hydrologic event (PMF) with the forced failure ofConklingville Dam. Combination of the dam breach outflow and PMF at IPEC after hydraulic routing iscalculated to be 1,217,700 cfs. The resultant peak water surface elevation from the combined dambreach peak outflow and PMF in the Hudson River at IPEC is 14.9 feet, which is 0.1 feet below theplant grade elevation of 15.0 feet.Details of this evaluation are provided in Section 3.3.4.1.3.3 Comparison The new evaluation uses a different dam and a higher base river flow. The resulting flood elevation is7.7 ft higher than the CLB. The resulting flood elevation is below the site grade of 15.0 ft.4.1.4 Storm Surge4.1.4.1 Current Licensing BasisThe CLB does not include a separate evaluation of flooding solely due to storm surge. The IPEC CLBof elevation 15 feet NGVD29 provides plant storm surge protection.
4.1.4.2 Reevaluated Flood Elevation The reevaluated storm surge due to a hurricane with tidal flow and sea level rise is calculated to be15.8 feet based on an annual exceedance probability of 2x10-6.4.1.4.3 Comparison The reevaluated storm surge elevation exceeds the CLB by 2.3 ft (15.8 ft vs. 13.5 ft).Page 4-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.1.5 Seiche4.1.5.1 Current Licensing BasisProbable Maximum Seiche caused flooding was not evaluated as part of the CLB.4.1.6 Tsunami4.1.6.1 Current Licensing BasisFlooding from tsunamis was not evaluated quantitatively because flood from a tsunami was notscreened out by other flood mechanisms (IPEC, 2011, Section 1.3.1).4.1.6.2 Reevaluated Flood Elevation The Probable Maximum Tsunami is not considered to be a significant flood hazard for IPEC due to theinland location of the site, the necessary geometry of a tsunami wave to enter the Hudson River, andthe predicted attenuation of a tsunami wave traversing the Hudson River.Details of this evaluation are provided in Section 3.6.4.1.6.3 Comparison Tsunamis were not evaluated as part of the CLB, so no direct comparison is possible.
Based on thenew evaluation, the probable maximum tsunami event would not impact safety-related SSC at IPEC.4.1.7 Ice-Induced Flooding4.1.7.1 Current Licensing BasisIce-induced flooding was not evaluated as part of the CLB.4.1.7.2 Reevaluated Flood Elevation The peak water surface elevation at IPEC, resulting from the upstream ice jam / ice dam breach wasconservatively calculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMFpeak water surface elevation of the Hudson River at IPEC of 14.6 feet.The peak water surface elevation at IPEC as a result from backwater caused by the ice jam wascalculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMF peak watersurface elevation on the Hudson River at IPEC of 14.6 feet.Details of this evaluation are provided in Section 3.7.4.1.7.3 Comparison Ice-induced flooding was not evaluated as part of the CLB, so no direct comparison is possible.
Basedon the new evaluation, ice-induced flooding elevations are bound by the PMF on the Hudson River.4.1.8 Channel Migration or Diversion 4.1.8.1 Current Licensing BasisMigration of the Hudson River is not evaluated as part of the CLB.Page 4-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.1.8.2 Reevaluated Flood Elevation A review of historical data indicates that the Hudson River has not exhibited a tendency to meandertowards the site. The Hudson River is a maintained, navigable waterway near IPEC and the U.S. ArmyCorps of Engineers, New York District is responsible for maintaining navigable conditions throughperiodic dredging.
Details of this evaluation are provided in Section 3.8.4.1.8.3 Comparison Channel Migration was not evaluated as part of the CLB, so no direct comparison is possible.
Due tothe geology of the watershed and man-made controls on the Hudson River, channel migration is notconsidered a hazard for IPEC.4.1.9 Combined Effect Flooding4.1.9.1 Current Licensing BasisThe controlling CLB flood level is the dam failure water level coincident with a probable maximumhurricane, resulting in a stillwater elevation of 14.0 ft. Wave runup was determined to be 1.0 ft,resulting in a maximum water surface elevation of 15.0 ft (IPEC, 2010).The NRC performed an independent evaluation of combined event flood elevations for Unit 2 (NRC,1988). The result of this evaluation was a stillwater elevation of 15.0 ft with 3.25 ft of wave runup,resulting in a maximum water surface elevation of 18.25 ft. This evaluation concluded that the physicalseparation of safety related SSC from the river bank provided a sufficient attenuation distance tomitigate this wave runup height.4.1.9.2 Reevaluated Flood Elevation The Maximum Water Elevation resulting from combined external flood effects, is associated withcoastal processes and includes storm surge, 25-year storm-related river flooding, antecedent 10percent exceedance tide, and coincident wind-generated wave activity.
The flood associated with astorm surge stillwater annual exceedance probability of 2 x 10.6 is calculated to be 15.8 feet. The wavecrest elevation is calculated to be 16.3 feet. The limit of wave run-up elevation is calculated to be 17.7feet.Details of this evaluation are provided in Section 3.9.4.1.9.3 Comparison The 17.7 ft elevation of the new evaluation exceeds the CLB combined event elevation by 2.7 ft.However, the 17.7 ft combined event elevation is bound by the NRC independent evaluation value of18.25 ft, which was considered to not impact safety-related SSC at IPEC as described in Section4.1.9.1.Page 4-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.2 Summary of Walkdown FindingsThe following sections provide summaries of walkdown findings for the two UPEC units from (IPEC,2012a and IPEC 2012b).4.2.1 IPEC Unit 2 Walkdown Findings (IPEC, 2012a)There were some observed conditions of features that did not meet the NEI 12-07 acceptance criteria.
These conditions were entered into the plant Corrective Action Program;
- however, only two of theseobservations were determined to be deficiencies as defined in NEI 12-07. The operability determinations for these deficient conditions concluded that the features did not pose a threat tooperability.
A feature found to be deficient was Item IP2-CTL-001, a double door between the 480V switchgear room and the transformer yard. It was observed that the bottom seal on the east section of Item IP2-CTL-001 was degraded.
Light could be seen and air cold be felt coming through the seal area. A workorder was created to repair the deficient condition.
An existing observation in the CAP identified an incident of water intrusion into the 480V Switchgear room in the Control Building during a volumetric data test of the #22 moat. In-leakage was observednear the north east corner of this room. Repairs to the moat have been made and the latest moat testshowed no indication of water leakage into the room.There were several conduits whose internal seals are currently not part of a preventive maintenance program.
These include the conduits that run from Manhole 24 to the 480V Switchgear room and thosethat run from Manhole 21 to the Zurn Strainer Pit.4.2.2 IPEC Unit 3 Walkdown Findings (IPEC, 2012b)There were some observed conditions of features that did not meet the NEI 12-07 acceptance criteria.
These conditions were entered into the plant Corrective Action Program (CAP); however, only four ofthese observations were determined to be a deficiency as defined in NEI 12-07. The operability determinations for the deficiencies concluded that the features did not pose a threat to operability.
A manhole near the southwest corner of the Diesel Generator
- Building, Manhole D1, contains backflowprevention for the building.
A 2 ft flapper valve is located in the manhole and prevents any site drainageor river high water level from backing up into the Diesel Generator Building.
During a visual inspection, it was noted the valve did not fully close and seal completely.
This valve has subsequently beenreplaced."
During preparations for Hurricane Sandy from 10/27/2012-10/29/2012, sandbagging was initiated around the IP3 Intake Structure Service Water Pump motors and around the Zurn Strainer Pit inside theIP3 Intake Structure.
Several issues were identified:
" There does not appear to be a dedicated sand pile solely for use for flooding mitigation toassure there will be enough sand available to meet the requirements of the flood procedure.
" The flood procedure does not cross-reference the maintenance procedure which provides thedetails and extent of the sandbagging requirements.
Page 4-5 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3" The sandbagging requirements of the maintenance procedure need to be revisited, as itrequires the building of a berm six feet tall and two sandbags deep around the perimeter of theservice water pumps." The maintenance procedure does not address the sandbagging around the Zurn Strainer Pitarea.* It was observed that three persons were only able to fill 300 sandbags over a period of roughlyone day. This number of sandbags is not adequate to meet the needs of the plant in a CLBflood event.It was also observed during the reasonable simulations that the flood procedure did not correctly identify the location of the temporary pumps on the 33 ft Elevation of the Unit 1 Turbine Building andthe incorrect valve number for the Zurn strainer pit sump pump discharge isolation valve wasreferenced in the procedure.
These conditions have been corrected by the purchase of pre-filled sandbags staged on pallets, Tiger Dam flood barriers and revision of appropriate procedures.
Water damage was observed during a visual inspection of IP3-CTL-009.
Box XV2, located in the 480VSwitchgear room of the IP3 Control Building, showed signs of prolonged exposure to water on theterminals.
There were two conduits that penetrate the south wall and one that penetrates the east wall of theStrainer Pit that do not have internal seals and therefore are potential leak paths into the pit. The 4 inchand 2 inch conduits that penetrate the south wall terminate in Manhole 31. Subsequent inspection ofManhole 31 observed that these conduits are not sealed at the manhole either. The termination point ofthe 2 inch conduit that penetrates the east wall is unknown.
Plant procedures have been revised toprotect manhole 31 from river flooding by sandbagging around the manhole.There were several conduits whose internal seals are currently not part of a preventive maintenance program.
These include the conduits that run from Manhole 34 to the 480V Switchgear room and thosethat run from Manhole 31 to the Zurn Strainer Pit. A PM program is now in place to periodically inspectthese seals.4.3 Impacts of Flood Elevations Based on the results of the new flood evaluation, four flood mechanisms exceed the IPEC CLB forthose specific mechanisms.
Flooding due to combined effects from coastal processes exceeds the CLB by 2.7 ft. However theNRC independent evaluation (NRC, 1988), which predicted a combined effect flood level of 18.25 ft,indicated that wave runup would not impact safety-related SSC at IPEC due to sufficient physicalseparation from the river edge. The NRC evaluation bounds the new flood results, and as a result thenew combined effect evaluation will not impact safety-related SSC at IPEC.The results of the new flooding on streams and rivers is 14.6 ft, compared to 12.7 ft in the CLB forstreams and rivers. The results of the new flooding due to dam failures is14.9 ft compared to 7.2 ft inthe CLB for dam failures.
Both reevaluations of the flooding on streams and rivers and dam failuresresult in flood elevations less than site grade or 15 ft.LIP caused flooding of the Unit 2 transformer yard results in 0.0 ft to 0.2 ft above door entry levels,which could impact safety-related SSC. Maximum water depths in the vicinity of the doors adjacent tothe Unit 2 transformer yard are shown in Table 4-2. Pre-filled Sandbags have been staged in thePage 4-6 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3transformer yards and procedures revised to protect all of the vulnerable doors with respect to thebeyond-CLB LIP event.4.4 References IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
IPEC, 2011. "Indian Point 3 Updated Final Safety Analysis Report Revision 04", Entergy, 2011, SeeAREVA Document No. 38-9193643-000.
IPEC, 2012a. "Indian Point Energy Center Unit 2 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding",
Entergy Nuclear, Engineering Report No. IP-RPT-12-00036, November 2012, See AREVA Document No. 38-9193643-000.
IPEC, 2012b. "Indian Point Energy Center Unit 3 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding",
Entergy Nuclear, Engineering Report No. IP-RPT-12-00038, November 2012, See AREVA Document No. 38-9193643-000.
IPEEE, 1995. "Individual Plant Examination of External Events for Indian Point Unit No. 2 NuclearGenerating Station",
Consolidated Edison Company of New York, Inc., December 1995, See AREVADocument No. 38-9193643-000.
IPEEE, 1997. "Indian Point Three Nuclear Power Plant -Individual Plant Examination of ExternalEvents",
New York Power Authority, IP3-RPT-UNSPEC-02182, September 1997, See AREVADocument No. 38-9193643-000.
NRC, 1988. "External Flooding Condition Technical Specifications for Indian Point Nuclear Generating Unit No. 2 (TAC No. 51921)",
U.S. Nuclear Regulatory Commission, November 15 1988.Page 4-7 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4.1-1: Flood Elevation Comparisons New Elevation Mechanism CLB Elevation (ft) (NGVD29)**..
(NGVD29)
(ft) Difference (ft)Local Intense Precipitation Unit 2 See Table 4-2 19.0 See Table 4-2Unit 3 See Section 4.3 19.2 BoundProbable Maximum Flood (PMF)- 12.7 14.6 +1.9, Bound***Hudson River (Tide Elev. at Battery5.35 ft.)PMF Including Local Oscillatory Wave 13.7 NE N/APMF and High Tide 12.4 14.6 +2.2, Bound***(Tide Elev. at Battery +2.2 ft.) (Tide Elev. at Battery5.35 ft.)PMF and High Tide Including Local 13.4 NE N/AOscillatory WavePMF and Low Tide 13.0 NE N/APMF and Low Tide Including Local 14.0 NE N/AOscillatory WaveStandard Project Flood and Ashokan 7.2 NE N/ADam FailurePMF and Dam Failure NE 14.9 N/AStandard Project Flood and Ashokan 8.2 NE N/ADam failure Including Local Oscillatory WavePMF and Dam Failure with Coincident NE 15.8 N/AWind-Wave ActivityProbable Maximum Hurricane (PMH) 13.5 NE N/Aand Spring High TideProbable Maximum Hurricane (PMH) 14.5 NE N/Aand Spring High Tide Including LocalOscillatory WavePage 4-8 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4.1-1: Flood Elevation Comparisons (cont.)Standard Project Hurricane and Standard 13.0 NE N/AProject Flood on Hudson RiverStandard Project Hurricane and Standard 14.0 NE N/AProject Flood on Hudson River Including Local Oscillatory WaveStandard Project Flood plus Standard 14.0 NE N/AProject Hurricane plus Dam FailureStandard Project Flood plus Standard 15.0 NE N/AProject Hurricane plus Dam FailureIncluding Local Oscillatory WaveHurricane resulting in 500,000-Year Surge NE 15.8 N/Aplus 25-Year Flood on Hudson River and 10Percent Exceedance High TideHurricane resulting in 500,000-Year Surge NE 17.7 N/Aplus 25-Year Flood on Hudson River and 10Percent Exceedance High Tide withCoincident Wind-Wave ActivitySeiche N/A Screened N/ATsunami N/A Screened N/A,Bound***Ice-Induced Flooding N/A 12.48 N/A,Bound***Channel Migration or Diversion N/A Screened N/ACombined Effects Flooding 15.0/ 18.25* 17.7 +2.7/-0.5*** Note: The NRC independently calculated the probable maximum combined effect flood to be a stillwater level of 15.0 ft pluswave runup of 18.25 ft, and this flood level had no impact to safety-related SSC.** Note: Value conservatively rounded down.***Note:
"Bound" indicates that the flood hazard has increased for a specific flood mechanism, but does not exceed the plantdesign****Note:
All values are from Table 2.5-1 of Unit 2 UFSAR Rev 22NGVD29 is equivalent to MSLCLB Combined Effects Flooding is based on Standard Project Flood plus Standard ProjectHurricane plus Dam Failure with Coincident Wind-Wave Activity.
Reevaluated Combined Effects Flooding based oncombination of the 25-year flood in the stream, the hurricane resulting in 500,000-year storm surge with wind-wave
- activity, and the antecedent 10 percent exceedance high tideNE indicates mechanism not evaluated.
Page 4-9 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4-2: Unit 2 Transformer Yard Doorway LIP Flood ImpactsFlood Elevation (ft) Water Depth at DoorUnit 2 Doorway Door Elevation (ft) near Door (f)U2-PAB-1 18.9 18.9 0.0U2-ABFP-1 18.6 18.5 -0.1U2-ABFP-2 18.7 18.8 +0.2U2-ABFP-2 18.7 18.8 +0.2U2-CB-1 18.7 18.9 +0.2Page 4-10 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 35.0 INTERIM EVALUATION AND ACTIONS TAKEN OR PLANNEDStorm surge and combined effects resulting from the postulated hurricane is the bounding event thatexceeds the Current Licensing Basis (CLB) flood level. These results are shown below in Section 5.1.Additional results for the new flooding on streams and rivers is 14.6 ft, compared to 12.7 ft in the CLBand the new flooding due to dam failures is14.9 ft compared to 7.2 ft in the CLB for dam failures.
Bothreevaluations of the flooding on streams and rivers and dam failures result in flood elevations less thansite grade or 15 ft and are thus bounded by the storm surge and combined events results.Although not part of the CLB, Local Intense Precipitation (LIP) based on the new hazard evaluation willproduce ponding in the transformer yard areas that will require certain doors to be protected fromflooding.
This section describes the interim actions to be taken to mitigate the effects of the Surge andLIP.Activities to mitigate the effects of External Flood events are performed in accordance with Operations and Maintenance procedures.
Both Sandbag and Tiger Dam placement is controlled by maintenance procedure 0-MET-402-GEN.
The guidance set forth in the maintenance procedure for placement ofsandbags is based on guidance contained in literature for good practices.
Placement of the Tiger Damsis in accordance to manufacturer's instructions.
Since the wave crest elevation is only projected to be1.3 ft above the flood stage level, the wall height of the sandbags, only approximately 3 ft, and theplacement locations either indoors or in outdoor areas shielding from direct wave action, it is notanticipated that the sandbag walls or Tiger Dams will be adversely affected by the floodwaters.
Evenconservatively considering wave run up heights estimated to be 2.7 ft above flood stage, a 3 ft tallsandbag or Tiger Dam wall has margin. With the exception of the protection of manholes 21, 23, 31, 33& 37, the interim actions described herein have been in place since July of 2011.5.1 Storm Surge and Local Intense Precipitation The results of the evaluation for Storm Surge in Section 3.4 for a 500,000 year storm determined thatthe maximum water levels at the waterfront as a result of the postulated hurricane are as follows:Stillwater Elev. Wave Crest Limit of Run-upElev. Elev.15.8' 16.3' 17.7'These levels exceed the maximum CLB stillwater Elevation of 15' resulting from the postulated stormsurge combined with the 25 year flood, 10% antecedent high water level and wave action. The stormsurge results govern over the LIP for areas located below the 18' elevation.
IPEC currently has actions in place to protect vital SSC located in the following areas of the facility toflood levels up to El. 17'-11'"
and the postulated LIP event:* Unit 2 Intake Structure (Service Water Pumps)* Unit 3 Intake Structure (Service Water Pumps)* Unit 2 480 Volt Switchgear RoomPage 5-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3" Unit 3 480 Volt Switchgear Room* Unit 2 Turbine Building for MCC 24A" Unit 3 Turbine Building for MCC 34" Unit 3 Emergency Diesel Generator Building" Unit 2 Service Water Valve Pit* Unit 3 Service Water Valve PitDue to the general elevation of the transformer yard (Elevation 18') and location with respect to theriver, river flooding will not affect the transformer yard. As a result, with the stillwater elevation postulated to be 15.8', storm surge will not affect this area. Only ponding resulting from the LIP needsto be considered.
This affects the following plant components:
" Door 224 (U2-ABFP-1)
- Door 225 (U2-ABFP-2)
- Door 226 (U2-ABFP-3)
- Door 227 (U2-PAB-1)
- Door 229 (U2-CB-1)
- Door 215 (U3-ABFP-1)
" Door U3-ABFP-2
" Door 212 (U3-ABFP-3)
" Door FDR-11-PA (U3-PAB-1)
" Door 305 (U3-PAB-2)
" Door 208 (U3-CB-1)
Current LIP mitigation strategies for the above doors are in place.No actions are required for flooding due to mechanisms other than LIP or storm surge events. Floodsdue to all other mechanisms have peak elevations below the plant's CLB or are bounded by the LIP orstorm surge events.5.1.1 Intake Structure The Intake Structures at both Unit 2 and Unit 3 are difficult targets to defend from the postulated stormsurge levels due to their proximity to the shoreline.
The vulnerable components at the Intake Structure are the Service Water Pump Motors which are located on top of the pumps at an approximate bottomelevation of 18'. The pump and motors are protected from direct wave action due to large equipment (traveling screen system) located between them and the river. The maximum stillwater river level fromthe 500,000 year storm is 15.8 ft and including wave run up is 17.7 ft, which are both below theapproximate elevation of the pump motors and should not adversely affect pump operation.
However,Page 5-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3mitigating actions are in place to keep the river flood waters from directly impacting the pumps/motors up to a level of 17'-11" through the placement of sandbags.
5.1.2 Protection of the Unit 2 and Unit 3 480V Switchgear RoomsSwitchgear rooms at Unit 2 & 3 are protected up to a river water elevation of 17'-11".
These areas areaway from the river front and their access points are located within the existing Turbine Buildings.
Although the Turbine Buildings will be allowed to flood, the buildings will protect the access doors to theSwitchgear rooms from wave action. The expected water elevations at the access door locations areequal to the determined stillwater elevation of 15.8 ft. As a result, the mitigating actions are sufficient toprotect the Switchgear rooms. These actions are summarized below:* The Unit 2 480 Volt Switchgear Room is located at El. 15-0" in the Control Building.
There aremultiple locations that require flood protection.
The first is the fire door just outside of Door 234and the second is Door 235. There are also three floor drains and six hub cleanouts.
TigerDams and or sand bags will be used for Door 235 since this area is clear of interferences and isrelatively flat. Sand bags will be used at Door 234 since there is no water source in the vicinityto fill the Tiger Dam. Inflatable drain plugs will be used to seal the floor drains and hubcleanouts.
" The Tiger Dam comes in a standard 50' length. A single 50' long tube can be pinched asnecessary to reduce the length. Three Tiger Dams are required at Door 235 setup in a pyramid(two tubes followed by one on top). The water source for Door 235 is FP-150 which has a hoseassembly that is adequate to reach the Tiger Dam location.
An additional coupler is required toattach the fire hose to the Tiger Dam prior to filling with water." Considering a sand bag wall that is 2 sand bags deep and 3 foot tall is approximately 12 sandbags per foot. One foot of height is required on the 6'-5" side because a concrete wall alreadyexists which is 25" tall. This results in approximately 4 sandbags per foot." The Unit 3 480 Volt Switchgear Room is located at El. 15'-0" in the Control Building and alreadyhas a flood barrier that is 4'-0" tall (verified via field measurements) located directly outside FireDoor FDR-1-CG.
- However, this flood barrier is typically removed during outages to allow craftto enter and exit the Switchgear Room more quickly.
Therefore, if this flooding event were tooccur during an outage, the 480 Volt Switchgear Room would be vulnerable.
The flood barrierwill be reinstalled in the event that this flood scenario occurs during an outage, or, in the unlikelyevent that the flood barrier cannot be re-installed, sand bags will be utilized.
In addition to the measures discussed above, manholes 21,23,31,33 and 37 will be protected by theplacement of sandbags.
These manholes contain conduits that communicate with the Unit 2 & 3switchgear rooms and require protection from inundation by the storm surge. Due to the potential ofgroundwater intrusion and some sandbag leakage, and to enhance this protection, these conduits willbe sealed as discussed in Section 6 of this report.Page 5-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 35.1.3 Protection of MCC 24A & 34AThese MCCs are located in the Turbine Buildings and provide power to certain EDG auxiliaries, including the EDG Compressors, Jacket Water Heaters and Lube Oil Heaters.
As with the doors to theswitchgear rooms, the expected water elevations at the MCC locations are equal to the determined stillwater elevation of 15.8'. The protections set up are adequate to protect these MCC's from thepostulated flood. These protection descriptions are summarized below are based on the protection levelup to elevation 17'-11 ".* MCC 24A is located at El. 15' in the Unit 2 Turbine Building.
Two existing concrete wallsprovide adequate flood protection on the north and east sides and a 1 ft tall concrete curbsurrounds the south and west sides. In order to provide flood protection up to 17'-11",
TigerDams will be used on the south and west sides of the MCC." Three standard Tiger Dams are required around MCC 24A setup in a pyramid (two tubesfollowed by one on top). The proposed water source for the MCC 24A Tiger Dam is FP-686,which has a hose assembly that is adequate to reach the Tiger Dam location.
An additional coupler is required to attach the fire hose to the Tiger Dam prior to filling with water." MCC 34 is located at El. 15' in the Unit 3 Turbine Building.
There is adequate clearance on thesouth and west sides to install Tiger Dams. These features will provide flood protection to aheight of 17'-11".
For the north side sand bags or equivalent barrier will be used since the floorspace available is considerably smaller than the other sides. Additional plastic sheeting can beused as well to supplement the sand bags.* Three standard Tiger Dams are required around MCC 34 setup in a pyramid (two tubes followedby one on top). The proposed water source for the MCC 34 Tiger Dam is FP-149, which has ahose assembly that is adequate to reach the Tiger Dam location.
An additional coupler isrequired to attach the fire hose to the Tiger Dam prior to filling with water.5.1.4 Protection of Unit 3 EDG Diesel CellsThe Unit 3 EDG diesels are located in the Unit 3 Control Building at the 15' elevation.
The EDG dieselsare located in separate reinforced concrete cells adjacent to the 480V switchgear room. The current 4'tall wall in front of the entrance to the switchgear room will protect the diesel cells from floodwaters entering through the access doors to the room and cells.The other area of vulnerability for flooding of the diesel cells is through the drain pipes located in thesumps of each cell. These drain lines are connected to a common drain header that discharges tomanhole D-1 located outside and south of the Control Building.
Manhole D-1 then discharges into theriver. To prevent river water from being able to back up into the diesel cells through the common drainheader, a flapper valve is installed at the discharge point of the drain header in Manhole D-1. Thisvalve acts as a check valve that is shut against the header pipe when water floods the manhole.
Thisvalve was recently replaced as a result of the Fukushima flooding walk down inspections.
Page 5-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Therefore, the Unit 3 EDG cells are currently protected from the new flooding hazard and require noadditional interim measures.
5.1.5 Protection of Unit 2 & 3 Service water Valve PitThe Unit 2 & 3 Service water Valve Pits are located just west and outside of the Turbine Buildings.
Theopenings to these pits are approximately located at the 15' elevation and would be subject to flooding.
These pits contain manually operated valves that allow operations personnel to swap service waterheaders as necessary during plant operations.
During the postulated hurricane that produces the stormsurge, it is not expected that these valves will need to be operated.
As a result, no interim protection measures are required for the service water valve pits.5.1.6 Flood Warning Times and Durations Time series plots of flood water elevations during the critical flooding scenarios are provided in Section3.1 (Figures 3.1-2 and 3.1-3) for LIP. These figures provide timing and duration of the flooding.
Warning time will be on the order of hours based on standard information from the National WeatherService for a LIP event. The National Weather Service, Hydrometeorological Prediction Center,produces various guidance forecast products to assist weather and river forecast centers.
Quantitative precipitation forecasts (QPFs) are particularly useful in determining when an LIP event might occur.The QPF provides rainfall over the continental U.S. for up to seven days at various intervals.
Theseforecasts depict isohyets in varying increments of accumulated precipitation expected in each interval.
(NOAA 2013) The longer term QPF provides an awareness level as to the potential for a minimum LIPevent. Similarly, an alert level requiring standby action could be taken using a shorter period QPF.Again, if the total precipitation estimated in three days is a certain percentage (to be determined) of theminimum LIP operating procedures will be taken.Current plant operating procedures begin preparations for flooding protections 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to apredicted hurricane impact or of a high tide warning with tides expected to exceed 4.5'(Unit
- 2) or 7'(Unit 3). For LIP type events, the procedures enter into the flood preparations for forecasted 24 hourrainfall that would exceed 5", which is significantly less than the postulated LIP event. With the use ofpre-filled
- sandbags, the staging of the sandbags on pallets in the vicinity of vulnerable areas, and TigerDams staged in a trailer, sufficient time will be available to implement the interim measures prior to thearrival of floodwaters.
Surge duration, a duration for flood waters to be above the CLB elevation of 15feet (NVGD29) is expected to be approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> (AREVA 2013, Figure 6).5.2 Reference AREVA, 2013. "Combined Events Flood Analysis
-Riverine",
AREVA Document No. 32-9196323-000, 2013.NOAA 2013. National Oceanic and Atmospheric Administration, National Weather Service,Hydrometeorological Prediction Center. Website:
Page 5-5 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 36.0 ADDITIONAL ACTIONSCurrently, mitigation measures are in place at IPEC to provide protection against a river flood level up.17'-11",
which is 2'-11" above the current design basis (CLB). As described in Section 5 of this report,the protection measures primarily involve placement of sandbags and or Tiger Dams to hold backfloodwaters from adversely affecting critical equipment.
This includes placement of sandbags aroundcertain manholes that contain conduits which communicate with the switchgear rooms at both units. Ifthese manholes become inundated with floodwaters, these conduits could provide a leak path into the480V switchgear rooms of both units.To enhance the current protection measures and provide additional protection against normal seepagethrough sandbag walls and the potential of some groundwater intrusion into the manholes, conduits thatcommunicate with the 480V switchgear rooms through manholes 23 & 33 will be sealed. Theseconduits will be sealed in the manholes with sealant tested and shown to be capable of resisting hydrostatic head pressures that can result from the beyond design basis flood levels discussed in thisreport. These seals will be installed in accordance to Entergy procedures governing the modification process.Manholes 24 & 34, which are located in the transformer yards and have conduits that communicate with the 480V switchgear rooms, are not subject to the storm surge event, but are subject to pondingcaused by the LIP. To prevent water due to the potential ponding from entering these manholes, thesemanholes will be raised approximately 18". All modifications to these manholes will be performed inaccordance to Entergy procedures governing the modification process.Page 6-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3APPENDIX A: ADDITIONAL SIMULATION MODEL USE DESCRIPTIONS A.1 Additional Computer Software Used for Flood Simulations All software codes used for IPEC flood analyses are those recommended in NUREG/CR-7046, withone exception:
FLO-2D. That program is described below.A.1.1 FLO-2D for LIP Simulations The example LIP calculation presented in Appendix B of NUREG/CR-7046 (NRC, 2011) used HEC-HMS and HEC-RAS, developed by Hydrologic Engineering Center of US Army Corps of Engineers.
The hydrologic part of the calculation was performed within HEC-HMS, whereas the hydraulic part ofthe calculation was performed within HEC-RAS.
In this flood re-evaluation study, FLO-2D was selectedfor calculation of the LIP-induced PMF at IPEC. For the LIP calculation, rainfall runoff was calculated internally by FLO-2D and translated into overland flow within FLO-2D.Appendix A was prepared as per Section 5.3 of NUREG/CR-7046 (NRC, 2011) to describe FLO-2D.A.1.2 Software Capability The FLO-2D computer program was developed by FLO-2D Software, Inc., Nutrioso, Arizona.
FLO-2Dis a combined two-dimensional hydrologic and hydraulic model that is designed to simulate riveroverbank flows as well as unconfined flows over complex topography and variable roughness, splitchannel flows, mud/debris flows and urban flooding.
FLO-2D is a physical process model that routes rainfall-runoff and flood hydrographs over unconfined flow surfaces using the dynamic wave approximation to the momentum equation.
The model hascomponents to simulate riverine flow including flow through culverts, street flow, buildings andobstructions, levees, sediment transport, spatially variable rainfall and infiltration and floodways.
Application of the model requires knowledge of the site, the watershed (and coastal, as appropriate)
- setting, goals of the study, and engineering judgment.
This software will be used to simulate the LIP,propagation of storm surge, seiches, and riverine flow through overland flow and channels to establish stillwater levels at various Flood Hazard Re-evaluation Project sites.The major design inputs to the FLO-2D computer model are digital terrain model of the land surface,inflow hydrograph and/or rainfall data, Manning's roughness coefficient and Soil hydrologic properties such as the SCS curve number. The digital terrain model of the land surface is used in creating theelevation grid system over which flow is routed. The specific design inputs depend on the modelingpurpose and the level of detail desired.The following executable modules compose the FLO-2D computer program:*.exe File SizeFLO.exe 10.76 MBGDS.exe 6.00 MBPage A-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3*.exe File SizePROFILES.exe 2.84 MBHYDROG.exe 2.07 MBMapper_2009.exe 3.33 MBMAXPLOT.exe 2.32 MBFLO.exe is the model code that performs the numerical algorithms for the aforementioned components of the overall FLO-2D computer model.GDS.exe graphically creates and edits the FLO-2D grid system and attributes and creates the basicFLO-2D data files for rainfall
-runoff and overland flow flood simulation.
PROFILES.exe displays thechannel slope and permits interactive adjustment of the channel properties.
HYDROG.exe enablesviewing of channel outputs hydrographs and lists average channel hydraulic data for various reaches ofriver. Mapper 2009.exe and Maxplot.exe enables graphical viewing of model results and inundation mapping.A description of the major capabilities of FLO-2D which will be used for this project is provided inSection A.1.3 below.A.1.3 Model Components Overland Flow Simulation This FLO-2D component simulates overland flow and computes flow depth, velocities, impact forces,static pressure and specific energy for each grid. Predicted flow depth and velocity between gridelements represent average hydraulic flow conditions computed for a small time step. For unconfined overland flow, FLO-2D applies the equations of motion to compute the average flow velocity across agrid element (cell) boundary.
Each cell is defined by 8 sides representing the eight potential flowdirections (the four compass directions and the four diagonal directions).
The discharge sharingbetween cells is based on sides or boundaries in the eight directions one direction at a time. Atruntime, the model sets up an array of side connections that are only accessed once during a time stepinstead of the dual algorithm required by searching for available elements.
The surface storage area orflow path can be modified for obstructions including buildings and levees. Rainfall and infiltration lossescan add or subtract from the flow volume on the floodplain surface.Channel Flow Simulation This component simulates channel flow in one-dimension.
The channel is represented by natural,rectangular or trapezoidal cross sections.
Discharge between channel grid elements are defined byaverage flow hydraulics of velocity and depth. Flow transition between subcritical and supercritical flowis based on the average conditions between two channel elements.
River channel flow is routed withthe dynamic wave approximation to the momentum equation.
Channel connections can be simulated by assigning channel confluence elements.
Flood Channel Interface This FLO-2D component exchanges channel flow with the floodplain grid elements in a separateroutine after the channel, street and floodplain flow subroutines have been completed.
An overbankdischarge is computed when the channel conveyance capacity is exceeded.
The channel-floodplain Page A-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3flow exchange is limited by the available exchange volume in the channel or by the available storagevolume on the floodplain.
Flow exchange between streets and floodplain are also computed during thissubroutine.
The diffusive wave equation is used to compute the velocity of either the outflow from thechannel or the return flow to the channel.Floodplain Surface Storage Area Modification and Flow Obstruction This FLO-2D component enhances detail by enabling the simulation of flow problems associated withflow obstructions or loss of flood storage.
This is achieved by the application of coefficients (Areareduction factors (ARFs) and width reduction factors (WRFs) that modify the individual grid elementsurface area storage and flow width. ARFs can be used to reduce the flood volume storage on gridelements due to buildings or topography and WRFs can be assigned to any of the eight flow directions in a grid element to partially or completely obstruct flow paths in all eight directions simulating floodwalls, buildings or berms.Rainfall
-Runoff Simulation Rainfall can be simulated in FLO-2D. The storm rainfall is discretized as a cumulative percent of thetotal. This discretization of the storm hyetograph is established through local rainfall data or throughregional drainage criteria that defines storm duration, intensity and distribution.
Rain is added in themodel using an S-curve to define the percent depth over time. The rainfall is uniformly distributed overthe grid system and once a certain depth requirement (0.01-0.05 feet) is met, the model begins to routeflow.Hydraulic Structures Hydraulic structures including bridges and culverts and storm drains may be simulated in FLO-2D Pro.Discharge through round and rectangular culverts with potential for inlet and outlet control can becomputed using equations based on experimental and theoretical results from the U.S. Department ofTransportation procedures (Hydraulic Design of Highway Culverts; Publication Number FHWA-NHI 020 revised May, 2005).LeveesThis FLO-2D component confines flow on the floodplain surface by blocking one of the eight flowdirections.
A levee crest elevation can be assigned for each of the eight flow directions in a given gridelement.
The model predicts levee overtopping.
When the flow depth exceeds the levee height, thedischarge over the levee is computed using the broad-crested weir flow equation with a 2.85 coefficient.
Weir flow occurs until the tailwater depth is 85% if the headwater depth. At higher flows, the water isexchanged across the levees using the difference in water surface elevations.
A.1.4 FLO-2D Model TheoryGoverning equations and solution algorithm are presented in details in FLO-2D Reference Manual(FLO2D, 2009a). The general constitutive fluid equations include the continuity equation and theequation of motion (dynamic wave momentum equation)
(FLO-2D, 2009a, Chapter II):Page A-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3ah ahvat aah V aV I aVSf = axaoa&~ g a twhereh = flow depth;V = depth averaged velocity in one of the eight flow directions; x = one of the eight flow directions; i = rainfall intensity; Sf = friction slope based on Manning's equation; So = bed slopeg = acceleration of gravityThe partial differential equations are solved with a central finite difference numerical scheme, whichimplies that final results are just approximate solutions to the differential equations.
Details on theaccuracy of FLO-2D solutions are discussed in FLO-2D Validation Report (FLO-2D, 2011).A.1.5 Model Inputs and OutputsInputs to FLO-2D are entered through a graphical user interface (GUI), which creates ASCII text filesused by the FLO-2D model (FLO-2D, 2009b). The ASCII text files can be viewed and edited by otherASCII text editors such as MicroSoft WordPad.Calculated results from FLO-2D simulations are saved in the ASCII text format in a number of individual files. The results can be viewed with the post-processor programs as follows:* Mapper -to view grid element results such as elevation, water surface elevation, flow depth andvelocity, to create contour maps and to generate shapefiles that can later be used by GISmapping software such as ArcMap." MAXPLOT -to view grid element maximum flood elevation, flow depth, velocity, channel flowdepth/elevation/velocity, and levee minimum free board/overtopping.
" HYDROG -to generate hydrographs for channel elements.
- PROFILES
-to plot channel water surface and channel bed profiles.
A.1.6 Conclusions FLO-2D is a FEMA-approved software (FLO-2D, 2011). The model validation report prepared forFEMA and the FLO-2D software certification prepared for Flood Re-evaluation Projects (AREVA, 2012)have demonstrated its modeling capabilities and numerical accuracy.
It is therefore judged to be anappropriate modeling tool for the Grand Gulf flood re-evaluation study where 2-dimensional overlandflow is predominant.
Page A-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3A.1.7 References AREVA, 2012. AREVA Document No. 38-9191747-000, Computer Software Certification
-FLO-2DPro, GZA GeoEnvironmental, Inc., October 2012.NRC, 2011. NUREG/CR-7046:
Design-Basis Flood Estimation for Site Characterization at NuclearPower Plants in the United States of America" U.S. Nuclear Regulatory Commission (U.S. NRC),Springfield, VA: National Technical Information
- Service, 2011.FLO-2D, 2009a. FLO-2D Reference Manual, FLO-2D Software, Inc.FLO-2D, 2009b. FLO-2D Data Input Manual, FLO-2D Software, Inc.FLO-2D, 2011. FLO-2D Model Validation for Version 2009 and up prepared for FEMA, FLO-2DSoftware, Inc., June 2011.Page A-5 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-40: Tracks for Top 10 SLOSH-Calculated Surge Events at IPEC Shown by NumericStorm Identification and Surge Ranking (AREVA, 2013e)Page 3-105 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-41: Tracks for Top 10 SLOSH-Calculated Surge Events at The Battery Shown byNumeric Storm Identification and Surge Ranking (AREVA, 2013e)Page 3-106 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 30.250.2-IPEC Low Tide0.1ZIS0.150wN_ 0.10z0-05n0 5 10 15 20SLOSH Calculated Max Storm Surge Elevation (ft, NAVD88)Figure 3.4-42: Histogram of Maximum Storm Surge at IPEC at Low0.2, , 1Tide (AREVA, 2013e)[ I PEC High Tide]0.181-0-161-I10.14.- 0.120> 0.1wS0.08o 0.06zFF1-1-0.04 F0.02 F010 5 10 15 20SLOSH Calcuated Max Storm Surge Elevabon (It, NAVD88)Figure 3.4-43: Histogram of Maximum Storm Surge at IPEC at High Tide (AREVA, 2013e)Page 3-107 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 30-090.08I -The Battery Low Tide II 1II0.07C-)SU-0= .050.049 0.060~ZIJL0.04NlE 0.030z0.020.010 1 10 5 10 15 20 25 30 35SLOSH Calculated Max Storm Surge Elevation (It, NAVD88)Figure 3.4-44: Histogram of Maximum Storm Surge at The Battery at0.09, 1 1 1 1Low Tide (AREVA, 2013e)III The Batt-r H-igh Tide I0.08 1-0.07 I-C,)U-00.060~0LLt0.05S"' 0.040_N~0.030zI-I-I -...." °'tr" ,ow II-0.02 I-0.01 -n L --E, ,~0 5 10 15 20 25 30 35SLOSH Calculated Max Storm Surge Elevation (Ift, NAVD88)Figure 3.4-45: Histogram of Maximum Storm Surge at The Battery at High Tide (AREVA, 2013e)Page 3-108 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33530"25Z 201151101 5W"8lI0 LJL -___ ___ I I L 4L i1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09Retum Period (years)Figure 3.4-46: SLOSH-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPEC35... -A-- Surge Elevation (0.25 ft Increments) 30Z25201,5210115a'l4-(U10A-AM0 .T r -.. .. .........
.. ..-. T ...... ..I1.E+03 1.E+04 1.E+05 1.E+06 1.E+07 1.E+08 1.E+09Return Period (yrs)Figure 3.4-47: SLOSH-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at The Battery(AREVA, 2013e)Page 3-109 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33~1.2-300 CO 0n 00 00 00 00 0O 00hi rN N N NN N N1 N1 U1 U1o o o -. o-ADCIRC @ The Batteryx Predicted TidesAA-4-1i-uRI--mul---
00LN8lLN00 00 00 00 W0 0 0 0O/ Ori *. '1 00 00 U IOo N, 0 n 0 N 000 00 00o o. NN 8Date and TimeFigure 3.4-48: Comparison of ADCIRC Tidal Results to Predicted Tides at The Battery (AREVA,2013e)543z 2---Tides only -Tides + 25yr flood24-IU1 V-- ---.- -A-~- --- -__~~~*~-~
---A-200Ln00 0)N N0,00NN0.6i0n0000 00U' U'oDate and Time00NIDU'06000 00N NID 0U' (I'N 0N0000U'000Figure 3.4-49: ADCIRC Tidal Results with 25-year Flood in the Hudson River at IPEC (AREVA,2013e)Page 3-110 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 32o04A'U20191817 ----16 .1514 .131211109876 --43210S.4.. Surge Elevation (0.25 ft Increments) 100,000 1,000,000 10,000,000 Return Period (years)Figure 3.4-50: ADCIRC-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPECwithout Sea Level Rise (AREVA, 2013e)Page 3-111 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Co.24ýz4-(5OhuJa,2019181716151413 ----121110 ------9876543 -21100,0004. Surge Elevation with 50-yr Sea Level Rise (0.25 ft Increments) 1,000,000 10,000,000 Return Period (years)Notes:1. On Figure 51, each data point represents a set of storm simulations that falls within each surge increment.
Figure 3.4-51: ADCIRC-Calculated Storm Tide (Stillwater)
Stage-Frequency Curve at IPEC withSea Level Rise (AREVA, 2013e)Page 3-112 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.4-52: Inundation Map -Combined Effect Flood -Probabilistic Storm SurgePage 3-113 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.5 SeicheA seiche is an oscillation of the water surface in an enclosed or semi-enclosed body of water initiated by an external cause. Once started, the oscillation may continue for several cycles; however, over timeit gradually decays because of friction (NRC, 2011, Section 3.6).There are two water bodies, The Hudson River and the IPEC Discharge Canal, in the vicinity of IPECthat require evaluation for Probable Maximum Seiche (PMS), as shown in Figure 3.5-1.3.5.1 MethodThe hierarchical hazard assessment (HAA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of seiches on the maximum water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011).The HHA approach is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and3. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992)Proximity of IPEC to a large river estuary, the Hudson River, requires evaluation of the PMS for a semi-enclosed basin. This evaluation addresses the PMS at the site with consideration of meteorological, astronomical, and seismic forcing as the causative mechanism for low frequency water surfaceoscillations or seiche in a semi-enclosed basin, the Hudson River.The discharge canal at IPEC also requires evaluation of the PMS for both a semi-enclosed basin (in thelongitudinal direction) and an enclosed basin (in the transverse direction).
This evaluation addresses the PMS at the site with consideration of meteorological, astronomical, and seismic forcing as thecausative mechanism for low frequency water surface oscillations or seiche in both a semi-enclosed and enclosed basins, in the discharge canal at IPEC.With respect to seiche evaluations for both of the water bodies of interest near IPEC, the following steps were used:1. Estimate the natural period of oscillation (primary seiche mode) of the surface water bodiesusing Merian's Formula;2. Analyze measured water level data within the Hudson River to identify the natural periods of theHudson River, and compare to the periods developed for the river using Merian's Formula;3. Compare the natural period of the surface water bodies to the periods of potential forcingmechanisms, including meteorological, astronomical and seismic conditions, to determine thepotential for resonance; andPage 3-114 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34. Evaluate flood levels where resonance could occur.3.5.1.1 Natural Period of the Surface Water BodiesAs noted above, the natural periods of oscillation of the surface water bodies were determined bycalculation using Merian's formula and evaluation of water level data. The dimensions of the waterbodies were developed using ArcMap 10.0 in a UTM Zone 18 Projection and IPEC drawings.
Merian's Formula provides a method for estimating the natural periods for the seiche modes inenclosed and semi-enclosed basins (Scheffner, 2008). The Hudson River and the discharge canal (inthe longitudinal direction) are semi-enclosed basins and the primary seiche modes are defined byEquation 1:4'T 41 ((Equation 1)(1+ 2n),Fg/where:T is the periodI is the length of the basing is the acceleration due to gravityh is the average depth of the basin..Jg is the shallow water wave speedn = the number of nodes along the axis of the basin (0 for the primary mode of asemi-enclosed basin), n=0,1,2...
In the transverse direction the discharge canal is considered an enclosed basin since it is bounded by asteel sheet pile bulkhead on the west side and a riprap slope on the east side (See Figure 3.5-12).Merian's Formula for an enclosed basin is presented in Equation 2, below (Sheffner, 2008):T = 21 (Equation 2)n ýg~hwhere:T is the periodI is the length of the basing is the acceleration due to gravityh is the average depth of the basin.ýfgh is the shallow water wave speedn = the number of nodes along the axis of the basin, 1 for the primary mode in anenclosed basinA spectral analysis of water level data was also performed to compare the estimated period of theprimary seiche mode with the observed periodicity of the Hudson River using six-minute water leveldata at USGS water level stations on the Hudson River, and one NOAA water level station near theHudson River (See Figures 3.5-5 and 3.5-6). The commercially available software MATLAB R201 lbwas used to perform the Fast Fourier Transform on each water level station data set.Page 3-115 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (I.PEC) Units 2 and 33.5.1.2 Periods of External Forcing Mechanisms Applicable forcing mechanisms include meteorological, astronomical, and seismic events. Thefundamental periods of the forcing mechanisms have to match the natural frequency of the surfacewater bodies (resonance) for significant seiche amplification to occur. The periods of the externalforcing mechanisms were developed based on typical, published ranges for these mechanisms.
3.5.2 Results3.5.2.1 Natural Period in the Hudson River using Merian's FormulaLongitudinal Direction The Hudson River was evaluated as a semi-enclosed basin in the longitudinal direction (AREVA, 2013).The resonant modes of a semi-enclosed basin are shown in Figure 3.5-4. The period of the primarymode is determined by setting n=0 in Merian's Equation
- 1. In a riverine environment, the location of theanti-node is at the head of the basin, defined as a physical barrier or a rapidly diminishing river crosssection that impedes upstream flow and reflects the wave energy. In the case of IPEC, the FederalDam at Tory acts as an anti-node for seiches.
The mouth of the river basin acts as a node.The Hudson River measures approximately 820,850 feet from the mouth at the Battery to the FederalDam and has an average depth of approximately 43 feet. Figures 3.5-2 and 3.5-3 show a plan view ofdepth in meters below NAVD88 along the length of the river. All measurements were performed usingArcMap 10.0 in a UTM Zone 18 Projection.
Merian's formula provides an estimated period for theprimary mode of approximately 24.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, as provided in Table 3.5-1.Transverse Direction The Hudson River was evaluated as an enclosed basin in the transverse direction since both ends ofthe basin in this direction are closed. The primary mode is determined by Equation 2 with n=1. Thelength of the basin (i.e., width of the river) is approximately 5,000 feet. The primary period wascalculated using two depths of 30 and 50 feet based on the range on measured water depth. Theestimated period for the primary mode in Hudson River in the transverse direction is 4 to 6 minutes, asprovided in Table 3.5-1.3.5.2.2 Observed Natural Period in the Hudson RiverThe natural periods of the river were also evaluated by performing a spectral analysis of measuredwater level data. The locations of the four USGS river stations and the NOAA Sandy Hook station areshown in Figure 3.5-6. The spectral analysis of the fifteen minute water level data for the four USGSwater level stations was carried out on eight to eighteen years of data from the station, and on tenyears of data from the 6 minute NOAA station using the commercially available software MatlabTMRelease 201 lb. The analysis was performed by applying a discreet Fast Fourier Transform (FFT) tothe water level data.The results of the spectral analysis are presented in Figures 3.5-7 through 3.5-11. The semi-diurnal tides form the largest peaks in the power spectra at all five observation locations, followed by thediurnal tides, which have a relative power about one order of magnitude lower than the semi-diurnal tides for the river water level stations.
The tidal harmonic constituents for the Battery, Haverstraw Bayand Albany are shown in Table 3.5-3.Tidal forcing from the principle astronomical components causes these strong spectral peaks near 1and 2 cycles per day and match well with the natural period estimated using Merian's Formula.
InPage 3-116 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3shallow waters such as the Hudson River the observed tidal spectrum has additional harmonic peaks,known as overtides, caused by transfer of energy to higher frequencies due to non-linear interactions between the tides and the local bathymetry.
The observed peaks at frequencies of three cycles per dayand higher are all known constituents which occur to some degree in all shallow tidal estuaries.
The spectral analysis of the observed water level shows no direct evidence of a seiche. All of thespectral peaks in Figures 3.5-7 through 3.5-11 are known tidal constituents observed in most coastaland estuarine environments.
- Further, the power in the peaks for the principle components show nosign of amplification toward the head of the river. Based on the observation data, there is no sign ofseiche dynamics in these time series for the Hudson River system.3.5.2.3 External Forcing Mechanisms in the Hudson RiverThe periods of external forcing mechanisms were evaluated to determine if resonance with the periodsof Hudson River is likely. Possible external forcing mechanisms include astronomical tides,earthquakes, and meteorological conditions including wind gusts and storms.Earthquakes The typical frequency content of earthquakes falls outside this range (approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ascalculated in section 3.5.2.1).
The typical range of ground motion periods from earthquakes do notnormally exceed ten seconds.Meteorological Meteorological forcing does not have sufficient energy at this frequency to drive a seiche in the HudsonRiver. Local convection drives wind gusts with a period of about one minute, and diurnal heating andcooling also drive weak periodic motions.
In temperate
- regions, the synoptic scale is the spatial andtemporal scale or temperate weather systems, which in the U.S. is about three to seven days (Wells,1997). The synoptic variability is too long to force a seiche in the Hudson River.Astronomical The tides in the Hudson River estuary drive a surface height oscillation of about 3.3 feet near IPEC.The period of diurnal tides fall within the range of seiche periods calculated in the Hudson River and area potential source of resonance.
Overall the diurnal and semi-diurnal tidal constituents diminish fromThe Sandy Hook to Haverstraw Bay, see Table 3.5-4 (NOAA, 2005a-d) and Figure 3.5-5 for theselocations.
The minor increases in the tidal constituent amplitudes is not evidence to support aconclusion that there is a resonant seiche due to astronomical tides in the Hudson River. The absenceof a resonant seiche is likely due in part to frictional dissipation of the river system.3.5.2.4 Natural Periods of the Discharge CanalThe canal length was determined by measuring the canal length on the site topographic plan (Sanborn, 2013). The channel depth and width are based on the typical section presented in Figure 3.5-12 (IPEC,1970). The discharge channel length measures approximately 530 feet long, 72 feet wide and is 20feet deep relative to MSL. The transverse calculation for the discharge is based on an average width of62 feet.Based on the channel dimensions in the longitudinal direction, the period of the primary mode of thedischarge canal is 84 seconds.
The primary mode in the transverse direction is approximately 5seconds.
An overview of the channel dimensions and associated periods is provided in Table 3.5-2.Page 3-117 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.5.2.5 External Forcing Mechanisms in the Intake and Discharge CanalsEarthquakes The frequency content of earthquakes can vary by earthquake and by distance of the site from theearthquake epicenter, however it is typically less than ten seconds.
The natural period of the canal inthe transverse direction falls within the range possible for earthquakes; therefore, resonance in thisdirection is possible and would result in "sloshing" of the canal water in the transverse direction.
Due tothe configuration of the discharge canal, see Figure 3.5-12, the height of the seiche in the transverse direction is limited by the elevation of the outboard steel sheet pile bulkhead which is approximately 8.0feet MSL. Therefore, if a seiche were to occur in the transverse direction, it would be limited to theheight of the bulkhead and would not overtop the landward bank of the canal at elevation 15 feet MSL,see Figure 3.5-12.Meteorological Meteorological forcing such as wind gusts, typically have a period of approximately 1 minute (Wells,1997), and therefore do not have a period in alignment with period of the primary seiche mode in thetransverse direction (about 5 seconds).
The period of primary mode on the longitudinal direction (84seconds) is close to that of wind gusts. However, wind gusts are not expected to create an initialsignificant wind set-up or consistent oscillating source of resonant forcing of sufficient strength on thespatial and temporal scales of the discharge canal to cause a significant seiche. A single storm eventmight cause a large storm surge; however, for resonance to occur, for either reflection point, stormforcing would have to be periodic at approximately once per day.Astronomical The astronomical tides in the Hudson River have periods that are several orders of magnitude largethan the longitudinal period of the discharge canal and do not cause resonance.
WavesAlthough wind-generated waves could occur with periods in the range of the transverse discharge canalperiod, the geometry of the discharge canal does not allow waves to enter the discharge canal in thetransverse direction.
The primary mode of the seiche in the longitudinal direction is 84 seconds, and isoutside the range of wind-generated wave periods.3.5.3 Conclusions The following summarizes the results and conclusions:
- 1. Two water bodies were identified as being susceptible to seiches and potentially creating a floodhazard at IPEC:a. The Hudson River;b. The discharge canal at IPEC2. Seiche motion is strongly damped in the Hudson River and is therefore a seiche is not a threat tothe Indian Point Energy Center;3. Merian's
- formula, and statistical analysis indicate that the Hudson River has a primary seichemode with a period of approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in the longitudinal direction and 4 to 6 minutes inthe transverse direction;
- 4. Merian's formula indicates that the IPEC discharge canal has a primary seiche mode with aperiod of approximately 84 seconds in the longitudinal direction and 5 seconds in the transverse direction; Page 3-118 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3No further analysis or modeling is required due to the direct observational evidence that resonantmodes are damped in the Hudson River and that potential seiches in the discharge channel will notimpact SCCs important to safety.3.5.4 References AREVA 2013. "Indian Point Energy Center Flood Hazard Re-evaluation
-Probable Maximum Seiche",AREVA Document No. 32-9196317-000, 2013.IPEC, 1970. "Indian Point Sheet Piling for Extension of Discharge Canal", Drawing No. B182027-0, Consolidated Edison, Co., June, 1970, See AREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011.NOAA, 2005a. Albany, Hudson River, NY -Harmonic Constituents.
Retrieved December 20, 2012,from Tides and Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtmI?stn=8518995%20Albany,/%20Hudson%2ý0River,%2 ONY&type=Harmonic%20Constituents NOAA, 2005b. Haverstraw Bay, NY -Harmonic Constituents.
Retrieved December 20, 2012, fromTides and Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtmI?stn=8518924%2OHaverstraw%20Bay,%20NY&type
=Harmonic%20Constituents NOAA, 2005c. The Battery, NY -Harmonic Constituents.
Retrieved December 20, 2012, from Tidesand Currents:
http://tidesandcurrents.noaa.gov/data-menu.shtml?stn=8518750%2OThe%2OBattery,/%20NY&type=Ha rmonic%20Constituents NOAA, 2005d. Sandy Hook, NJ -Harmonic Constituents.
Retrieved December 20, 2012, from Tidesand Currents:
http://tidesandcurrents.noaa.gov/datamenu.shtml?stn=8531680 Sandy Hook,NJ&type=Harmonic+Constituents
- Sanborn, 2013. Indian Point Energy Center (IPEC) Topographic Survey, Sanborn Map Company, Inc.,January 2013, AREVA Document No. 38- 9196956-000.
Scheffner, 2008 Scheffner N.W. 2008. "Water Levels and Long Waves." In: Demirbilek, Z., CoastalEngineering Manual, Part II, Coastal Hydrodynamics Chapter 5-6, Engineer Manual 1110 1100, U.S.Army Corps of Engineers, Washington, D.C.Wells, 1997. Wells, N. "The Atmosphere and Ocean, A Physical Introduction."
John Wiley & sons Ltd,1997.Page 3-119 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-1: Seiche Parameters for the Hudson RiverDirection Length (feet) Depth (feet) PeriodLongitudinal 820,850 43 24.6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />sTransverse 5000 30 5.2 minutesTransverse 5000 50 4.2 minutesPage 3-120 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-2: Seiche Parameters for the IPEC Discharge CanalDischarge Canal Length (feet) Depth (feet) Period (Seconds)
Longitudinal 530 20 84Transverse 62 20 5Page 3-121 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-3: Tidal constituent at three sites on the Hudson River from NOAAAmplitude (Feet)Period TheName Type (hou Frequency (1/days)
Sandy Hook Tte Haverstraw Bay Albany(hours) BatterySemi-M2 d iu 12.4 0.5 2.3 2.2 1.5 2.3diurnalN2 Semi- 12.7 0.5 0.5 0.5 0.3 0.4diurnalSemi-S2 diu 12 0.5 0.4 0.4 0.3 0.3diurnalK1 Diurnal 23.9 1.0 0.3 0.3 0.3 0.401 Diurnal 25.8 1.1 0.2 0.2 0.2 0.2Semi-K2 d iu 11.9 0.5 0.1 0.1 0.1 0.1diurnalP1 Diurnal 24.1 1.0 0.1 0.1 0.1 0.1Q1 Diurnal 26.9 1.1 0.03 0.04 0.0 0.0Page 3-122 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.5-4: Ratio of tidal constituents on the Hudson River to Sandy Hook, NJ from NOAA.Battery/
Haverstraw/Sandy Name Type Sandy Hook Hook Albany/Sandy HookM2 Semidiurnal 0.97 0.67 0.99N2 Semidiurnal 0.98 0.55 0.81S2 Semidiurnal 0.96 0.61 0.74K1 Diurnal 0.99 0.89 1.101 Diurnal 0.96 0.89 1.2K2 Semidiurnal 0.92 0.57 1.1P1 Diurnal 0.99 0.73 1.0Q1 Diurnal 0.95 0.81 1.0Page 3-123 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-1: Site Locus Map with location of the IPEC discharge canal (ESRI, 2012).Page 3-124 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3\ /~..r..,o1.~3 6 9I 7D.Figure 3.5-2: NYS DEC Lower Hudson River Estuary Program bathymetry.
The dashed line is the approximate location of the deepest channel.
The horizontal datum is NAD83and the vertical datum is NAVD88 (NYS, 2009).Page 3-125 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-3: NYS DEC Upper Hudson River Estuary Program bathymetry.
The dashed line is the approximate location of the deepest channel.
The horizontal datum is NAD83and the vertical datum is NAVD88. Note this portion of the Hudson River is approximately 45 milesupstream of IPEC (NYS, 2009).Page 3-126 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3"b., LCS[L93ASIN K1) F .kr crr ertcl IVrdeH- r r H rn Qr ic '(1) P1 ofil(2) Water Motion(u) STANDING WAVESOn i de-(2) ',econd %lode(Second Harrcr~ic)
(p:) ON FN-ý) RASN?(;)Second Mccf-(Tf ird -1(Jr~r 1Lm(3) Tirc' Mode'Fiftb cro(.h~ird WMde\N 7~' 7~I / N-9Sudoce Prn~iIen
-o~ o~;IIntYq
~veFigure 3.5-4: Diagram of the first three resonant modes of an enclosed (left) and semi-enclosed (right) basin from Scheffner 2008.Page 3-127 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-5: Map of the Hudson River including the location of IPEC and NOAA TidalConstituents Stations (NOAA, 2005a-d).
Page 3-128 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-6: Map of the Hudson River including the location of IPEC and USGS Stream Gagesused for a Fast Fourier Transform (USGS, 1991; NOAA, 2012).Page 3-129 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-7: Spectral Analysis of surface height time series at Albany on the Hudson River.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-130 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-8: Spectral Analysis of surface height time series at Hastings on the Hudson River.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-131 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-9: Spectral Analysis of surface height time series at Poughkeepsie on the HudsonRiver.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-132 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-10: Spectral Analysis of surface height time series at West Point on the HudsonRiver.The y-axis has units of spectral power in this case proportional to feet squared.
The x-axis has units offrequency in days or cycles per day.Page 3-133 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.5-11: Spectral Analysis of surface height time series at Sandy Hook on the HudsonRiver.The y-axis has units of spectral power in this case proportional to meters squared.
The x-axis has unitsof frequency in days or cycles per day.Page 3-134 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC)Units 2 and 3WIADO 6ir x-/41- J30'404,"'e'q Mfly. .01,qpRtP- ~3RSEC:TION A-ASCALE h6-' V-0ROCKI9410Figure 3.5-12 Profile view of the IPEC discharge canal, (IPEC, 1970).Page 3-135 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.6 TsunamiThis section addresses the potential for flooding at Indian Point Energy Center (IPEC) due to theprobable maximum tsunami (PMT) on the Hudson River.As defined in NUREG/CR-6966 (U.S. NRC, 2009), the PMT is that tsunami for which the impact at thesite is derived from the use of the best available scientific information to arrive at the set of scenarios reasonably expected to affect the nuclear power plant site, taking into account:1) appropriate consideration of the most severe of the natural phenomena that have beenhistorically reported for the site and surrounding area, with sufficient margin for the limitedaccuracy, quantity and period of time in which the historical data have been accumulated;
- 2) appropriate combinations of the effects of normal and accident conditions with the effects of thenatural phenomena; and3) the importance of safety functions to be performed.
The Indian Point Energy Center (IPEC) is located approximately 43 mi upstream of the Battery andapproximately 60 mi upstream from the ocean coast (See Figure 3.6-1). Due to its location (about 60miles from the coast), direct inundation of IPEC from a tsunami will not occur. However, given itslocation on a tidal river which is connected to the ocean, IPEC could potentially experience boresinduced by a coastal tsunami propagating up the Hudson River; therefore, evaluation of both thecoastal tsunami hazard and likelihood of impact to IPEC was performed.
3.6.1 MethodThe approach and methodology used in the tsunami described below. Unless noted otherwise, theapproach used in this report is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007 (NRC, 2007);2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976 (NRC, 1976);b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977 (NRC, 1977);3. NUREG/CR-7046
-Design Basis Flood Estimation for Site Characterization at Nuclear PowerPlants in the United States of America, dated November 2011 (NRC, 2011);4. American National Standard for Determining Design Basis Flooding at Power Reactor Sites,ANSI/ANS 2.8- 1992 (ANSI/ANS-2.8, 1992); and5. NUREG/CR-6966 "Tsunami Hazard Assessment at Nuclear Power Plant Sites in the UnitedStates of America",
Final Report (NRC, 2009).In accordance with the guidelines presented in NUREG/CD-6966 (NRC, 2009), a hierarchical assessment approach is used to evaluate the tsunami hazard. Relative to tsunami hazards, thehierarchical hazard assessment (HHA) approach consists of the following steps:1. A Regional Screening Test involving an evaluation of the regional hazard based on a review ofthe historical record and the best available scientific data.Page 3-136 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 32. For sites where the Regional Screening Test has identified a tsunami hazard, a Site Screening Test is performed to compare the location and elevation of the plant site with the areas affectedby tsunamis in the region.3. A Detailed Tsunami Hazard Assessment is performed if the screening tests do not establish thesafety of the plant. A detailed, site-specific tsunami hazard assessment typically involvesidentification and modeling of applicable (near-field and far-field) tsunamigenic sources,numerical modeling of wave propagation from the tsunamigenic source to the near shore andnumerical inundation modeling of the plant site and vicinity.
The methodology to complete the Regional and Site Screening Tests included:
- 1. Review of the National Geophysical Data Center (NGDC) Tsunami Event Database (NGDC,2012) and other sources relative to documented historical tsunamis at or near the site;2. A literature search to identify the near-field and far-field tsunamigenic sources that areconsidered a risk relative to generation of tsunamis that may impact the site;3. Review of published first-order modeling performed for the National Oceanic and Atmospheric Administration (NOAA), as part of the National Tsunami Hazard Mitigation Program (NTHMP,2012), and others, for the United States (U.S.) East Coast; and4. Consultation with tsunami subject matter expert, Dr. Stephan Grilli, PhD, PE. Dr. Grilli is aProfessor of Ocean Engineering at the University of Rhode Island and is currently undercontract with NOAA-NTHMP to evaluate the tsunami hazard risk along the U.S. East Coast,including performance of the above-referenced modeling and on-going, detailed tsunami hazardassessments of selected areas of the East Coast.A simplified hydraulic analysis to assess (as part of the Site Screening) whether or not the hydraulic conditions of the Hudson River appear conducive to propagation of bores of significant amplitude toIPEC.3.6.2 Results3.6.2.1 Regional Screening Test (AREVA, 2013a)The regional screening test evaluated the coastal (i.e., near the mouth of the Hudson River) tsunamihazard from both near-field and far-field tsunamigenic sources.
The industry technical literature, reflecting the available scientific data on tsunami hazards in the Atlantic Ocean, were compiled andreviewed.
That included the NGDC tsunami and earthquake databases, work completed as part ofNOAA's National Tsunami Hazard Mitigation Program (NTHMP),
and a comprehensive study oftsunami hazard in the Atlantic published by the Atlantic and Gulf of Mexico Tsunami HazardAssessment Group (AGMTHAG) and a detailed literature review of tsunamigenic sources affecting tsunami hazard along the U.S. East coast (Grilli et al, 2011).Historic Tsunami RecordThe NOAA NGDC tsunami database (NGDC, 2012) was queried to identify historic tsunami run-up andsource events along the U.S. and Canadian Atlantic coasts. The database query results aresummarized in Table 3.6-1. The tsunami runup heights as measured by tide gages along the U.S eastcoast ranged in height from 0.2 to 2.2 feet (NGDC, 2012).Page 3-137 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Tsunamigenic SourcesGrilli et al, 2011 assesses the regional tsunami hazard for the U.S. East Coast and contains resultsfrom relevant tsunami inundation models applied in the region. In addition, during 2007 and 2008, theAGMTHAG, 2008 performed additional evaluation of potential tsunamigenic sources capable ofimpacting the U.S. Atlantic and the Gulf of Mexico coasts. The findings of both Grilli at al, 2011 andAGMTHAG, 2008 were that the primary tsunamigenic sources defining the tsunami hazard along theU.S. northeast coast are:* Near-field submarine mass failures (SMFs) (i.e., landslides) along the U.S. Atlantic continental margin;" Far-field, transoceanic subaerial landslides (the Canary Island's Cumbre Vieja Volcanocollapse);
- Far-field earthquakes along the Azores-Gibraltar Plate Boundary (convergence zone); and" Far-field earthquakes along the Caribbean-North America Plate Boundary (Puerto Rico Trenchsubduction zone).Figure 3.6-2 identifies the locations of these sources.Near-field Tsunamigenic SourcesSubmarine mass failures (SMFs) along the U.S. Atlantic continental margin have potential to generatelocal tsunamis that impact nearby coastlines.
These landslides occurred historically offshore of NewEngland and Long Island, outward of major ancient rivers in the mid-Atlantic, and in the salt domeprovince offshore of North Carolina (Twichell et al, 2009). Figure 3.6-3 shows the mapped distribution of submarine landslides along the U.S. Atlantic continental slope and rise (AGMTHAG, 2008).The potential magnitude of landslide-generated tsunamis is extremely site-specific and depends ondetailed
- geometry, location, and slide volume, as well as the mode of rupture.
Most of theseparameters are poorly understood for observed landslide scars (Grilli et al, 2011). The onlydocumented historic submarine landslide tsunami to impact the North American coastline occurred as aresult of the 1929 Laurentian Slope Earthquake near the Grand Banks (magnitude of Mw=7.2).
Historicdata and tectonics both suggest that similar large tsunamigenic earthquakes are uncommon in theregion, and this event represents, to date, the largest earthquake ever recorded in the North Americancoastal regions of the Atlantic basin (Grilli et al, 2011; Whitmore et al, 2009).Recent work (Grilli et al, 2011; Grilli et al, 2009 and Grilli et al, 2012) presents a regional assessment of the U.S. East Coast tsunami hazard based on on-going work for NOAA's NTMHP program.
Firstorder screening analyses of both near-field and far-field sources are complete and the results, given interms of near shore breaking wave height and runup, some with defined return periods, are presented below.Grilli et al, 2009 developed a probabilistic Monte Carlo Simulation (MCS) approach to determine SMFtsunami hazard along the upper northeast U.S. coast, which was refined and extended to the entireU.S. East coast by Krause, 2011 and Grilli et al, 2012 as part of the NOAA-NTHMP project.
In thisanalysis, the tsunami hazard was assessed from local SMF sources triggered on the continental slopeby moderate seismic activity, by performing simplified stochastic slope stability and tsunamigeneration/propagation analyses.
The results of this preliminary, screening-level analysis provide first-order estimates of wave amplitude and runup. Over 15,000 stochastic stability analyses of submerged slopes were performed along each of the 45 actual shelf transects in the Northeast and then againalong the additional 46 transects (See Figure 3.6-4) that were added for the remaining portion of thePage 3-138 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3coast. The slope stability transect locations were defined in areas with homogeneous topographic features and the slope stability analysis used actual bathymetry for each transect.
Grilli et al, 2009concluded that, for most locations, the overall coastal hazard resulting from 100-year and 500-yearsubmarine landslide generated tsunamis was relatively low and similar to a typical 100-year stormsurge in the region, roughly 13 to 16.5 feet in the study region (USACE, 2002). For the 500-year returnperiod tsunami, Grilli et al, 2009 presented two regions of relatively elevated hazard:1) near Long Island, NY with a peak run-up of 10 ft (3 m); and2) near the New Jersey coast, with a peak run-up of 13 feet and peak breaking wave height of 20to 23 feet at breaking distances (from the coastline) of about 800 to 1000 feet.The most notable submarine landslide complex along the U.S. Atlantic continental margin is theCurrituck Landslide, located off the coast of North Carolina.
Geist et al, 2009 describes the complex asone of the "largest landslides along the North American Atlantic offshore margin Geist et al, 2009modeled the Currituck Landslide tsunami event in detail. Results of this modeling showed largevariation in both the maximum runup and near shore wave amplitude at a location broadside ofCurrituck Landslide.
The maximum wave runup at Currituck Banks ranged from about 4 to 29 feet,while the near shore wave amplitude at the same location ranged from approximately 9.8 to 22.9 feet.Results from the three different slide scenarios at a shore location are shown in Figure 3.6-5.Owing to both its similarity in mechanism and nature to most of the other SMFs observed along theNorth American Atlantic margin (See Figure 3.6-3), the Currituck Landslide is a relevant SMF tsunamihazard assessment for the coastal region near the Hudson River mouth. In the absence of moreaccurate site-specific field data, the Currituck Landslide is typically used by NOAA as a proxy for thedeterministic source of maximum probable SMF tsunami, to compute tsunami hazard maps along theupper U.S. East coast.Far-field Tsunamigenic SourcesDue to the location of the Hudson River mouth on the U.S. northeast coast, IPEC may be impacted bytsunamis generated by far-field sources.
Grilli et al, 2011 identified the following discussions of far-field tsunamigenic sources that could impact the Hudson River mouth.Subaerial and Submarine Landslides:
The most notable far-field landslide source results from thepossible large scale flank collapse of the Cumbre Vieja, a volcano on La Palma in the Canary Islands.Abadie et al. (Abadie et al 2009, 2012, 2011) and Harris et al. (Harris et al, 2012), as part of the workcompleted for NOAA-NTHMP, recomputed both the tsunami generation and near-field and far-field propagation to the US East Coast, for Cumbre Vieja source. The maximum tsunami elevations for theU.S. East Coast, from a 19 mi3 slide scenario, presented in Figure 3.6-6, show some of the highesttsunami elevations (on the order of 10 feet) occurring off of northern New Jersey and Long Island.They found that, for the extreme case of 108 mi3, waves of 26 to 33 feet in height could reach thecontinental shelf at some locations in the general area of the Hudson River mouth. Propagation overthe shelf, however, which is site-specific by nature, caused significant dissipation through breaking ofthese waves, reducing their coastal impact.Azores-Gibraltar Convergence Zone: The Azores-Gibraltar convergence zone is another significant tsunamigenic source in the Atlantic basin. There are numerous potentially active faults within theconvergence zone, including the Gorringe Bank Fault, the Marque de Pombal Fault, the St. VincenteFault, and the Horseshoe fault. Those faults are presently active and collectively a source of some ofthe largest historical earthquakes and tsunamis in the Atlantic Ocean, including the 1755 Great LisbonEarthquake and tsunami (Grilli et al, 2011).Page 3-139 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3From historical
- records, it is known that the 1755 Great Lisbon Earthquake, along with its ensuingtsunami, caused waves of 16.4 to 49.2 feet along the southwest coast of Iberia and Morocco.
Runupfrom the trans-oceanic tsunami was documented in the Caribbean, Brazil, and Newfoundland.
Therewere no reports documenting flooding or runup along the U.S. East Coast, despite the presence of lowlying population centers along the U.S. and Canadian Atlantic coasts at the time (Grilli et al, 2009;NGDC, 2012). AGMTHAG, 2008 suggests that the lack of historic runup reports along the U.S. EastCoast may be due to the broad continental shelf, which contributed to dissipation.
Additionally, theGorringe Bank and the Madeira-Tore Rise (MTR) appear to have acted as topographic
- scatters, protecting most of the U.S. East Coast (AGMTHAG, 2008). Mader, 2001 employed the nonlinear SWAN model to simulate the 1755 Lisbon earthquake using a location near the Gorringe Bank.Mader's model simulations showed that the U.S. East Coast could have received maximum deep watertsunami wave amplitudes of 6.6 feet with a runup of approximately 10 feet.Barkan et al., 2009 performed additional simulations to assess tsunami hazard to the U.S. East Coastfrom potential future earthquakes along the Azores-Iberia plate boundary west of the Madeira-Tore Rise (MTR) or in the Gulf of Cadiz would only produce deep water tsunami amplitudes of roughly 0.26feet off the coast of New York (Barkan, 2009). Furthermore, tsunamis generated by earthquakes in theGulf of Cadiz would produce maximum wave amplitudes less than 1.3 feet (0.4, m) along the NewJersey and New York coastlines (AGMTHAG, 2008).Caribbean Subduction Zone: The Caribbean region is characterized as an active seismic area and isassociated with a large number of past tsunamis.
The Caribbean plate is bounded to the north by amajor transform fault at the boundary with the North American plate and to east by the large andsubducting South American plate. Its movement with respect to the North American plate causesvolcanic eruptions and earthquakes in the region (Grilli et al, 2011; Zahibo et al, 2001). The PuertoRico Trench (PRT) is the Caribbean fault that is most likely to cause tsunamis that could reach the U.S.Atlantic coast because of its location and east-west orientation (Grilli et al, 2011). The lack of a largeearthquake in the PRT in recent history and evidence of internal stress-build up in the nearbysubduction zone indicate that a large and potentially tsunamigenic earthquake in the trench may beimminent (Grilli et al, 2011).Due to potential for a large event, Knight, 2006 developed a first-order estimate of the most extremeearthquake that could occur in the PRT, a magnitude 9.1 earthquake resulting in an average slip of 39feet (Grilli et al, 2011). Knight also assessed the resulting potential tsunami hazard. He demonstrated that wave arrivals resulting from an earthquake occurring in the Puerto Rico trench along the Atlanticcoast have leading elevations with amplitudes up to 5 feet in Atlantic City, NJ and 2.2 feet in Montauk,NY. Knight noted that the far-field tsunamis generated from earthquakes in the Caribbean Sea causehigher amplitudes along the Gulf coast than the Atlantic coast due to dissipation through the GreaterAntilles Islands.
Grilli et al, 2010 performed a study for both an extreme (magnitude 9.1) and a smaller(magnitude 8.7) earthquake (which, based on limited historical
- records, were estimated to correspond to 600 and 300-year return periods, respectively) along the Puerto Rican Trench. Their results suggestthat a tsunami resulting from the extreme 9.1 magnitude earthquake could cause a maximum runup of6.6 to 9.8 feet in most locations along the upper U.S. East Coast. Grilli et al, 2012 also examine asimilar extreme 9.0 magnitude earthquake and also show the results on a low resolution regional grid,which is shown to cause a maximum tsunami elevation up to about 3 feet along the continental marginoff of New York.In summary, the results of the Regional Screening Test did not identify any historical tsunami impacts(runup heights greater than 2 to 3 feet). Several near field and several far field sources were identified that, under very conservative assumptions, could result in tsunamis that affect the coastal area in thePage 3-140 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3vicinity of northern NJ and Long Island. Preliminary, deterministic first-order models, conservatively assuming "worst case" failures at each of these sources indicated the following:
For near-field tsunamigenic
- sources, slope stability calculations for the 500-year return period tsunami,Grilli et al, 2009 identified two regions of relatively elevated hazard due to submarine mass failures(SMF) along the continental shelf:1) near Long Island, NY with a peak run-up of 10 ft; and2) near the New Jersey coast,with a peak run-up of 13 feet and peak breaking wave height of 20 to 23 feet at breaking distances (from the coastline) of about 800 to 1000 feet. These regions were also identified in Krause, 2011 ashaving elevated hazard; however runup was estimated on the order of 16 to 20 feet. The most notablesubmarine landslide complex along the U.S. Atlantic continental margin is the Currituck Landslide, located off the coast of North Carolina.
The Currituck Landslide is often conservatively used by NOAAas a source for the deterministic analysis of SMF tsunami impact at specific sites along the U.S. EastCoast, even if they are not located across from the actual Currituck Landslide.
The maximum modeledwave runup at Currituck Banks ranged from about 4 to 29 feet, while the near shore wave amplitude atthe same location ranged from approximately 9.8 to 22.9 feet.The Hudson Canyon is a major feature of the continental slope and rise offshore of New York. Due tothe Hudson River Canyon bathymetry, long tsunami waves from the far-field sources are expected tosignificantly refract away from the Hudson River Canyon, reducing their propagation toward the HudsonRiver (Harris et al, 2012), and thereby the tsunami risk to the Hudson River.For far-field tsunamigenic sources the following potential sources were identified:
- a. Cumbre Vieia Volcano (Canary Islands):
The maximum modeled tsunami elevations rangedfrom about 10 feet to 33 feet occurring offshore of northern New Jersey and Long Island(Abadie et al, 2012). The models indicated that propagation over the continental shelf causedsignificant dissipation through breaking of these waves, reducing their coastal impact.b. Azores-Gibraltar Convergence Zone: Modeled tsunami elevations and runup are insignificant inthe vicinity of northern NJ and Long Island (Abadie et al, 2010).c. Caribbean Subduction Zone: Modeled tsunami elevations and runup are insignificant in thevicinity of northern NJ and Long Island (Grilli et al, 2012).3.6.2.2 Site Screening TestDue to the significant distance of IPEC from the coast (about 60 miles) as well as the significant topographic relief present between IPEC and the coast, inundation in the vicinity of IPEC will not occurdue to coastal tsunami run-up. Propagation of tsunami waves in rivers and estuaries is complex andrequires site-specific modeling using a numerical model that is able to simulate nonlinearity, dispersion, and dissipative processes such as breaking and bottom friction.
- However, by inspection, significant attenuation of waves (or bores) propagating up the river will occur before reaching IPEC. The following observations on the hydraulic condition of the river are made (see Figure 3.6-1):* Waves propagating from the Lower Bay to the north pass through a constricted channel separating the New York Harbor and Lower Bay (the Narrows).
The Narrows is about 1 mile wide, with a deep(up to about 80 feet), 1/2 mile wide channel.Page 3-141 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3* The Narrows opens up to New York Harbor, a basin of about 5 miles length and 2.5 miles width,with depths ranging from about 2 feet to 40 feet, and typically about 20 feet. The land adjacent toNew York Harbor is the one portion of the river where significant overland flow can occur and thewidth of the area (including the harbor) characterized by elevations lower than 20 feet is about 5 to6 miles (for the entire length of the harbor).
This would be anticipated to reduce wave amplitude.
- At the north end of New York Harbor (the Battery),
the Hudson River begins to become a definedriver channel and continues as such for about 25 miles to the north of the Battery, maintaining achannel width of about 1 mile. Additional attenuation of waves would be anticipated to occur withinHaverstraw Bay." The IPEC site is located on the east shoreline of the Hudson River (looking upstream) andtherefore, the potential for impacts from a bore moving upstream are minimal." Subcritical flow conditions are also expected throughout the Hudson River owing to its significant depth and mild (or adverse) bottom slope.The results of this qualitative site screening analysis indicate that significant amplitude attenuation willlikely occur along the river, between the Lower Bay and IPEC (see Figure 3.6-1) and significant backwater effects are not expected at the location of IPEC, 60 miles from the ocean shoreline.
Therefore, tsunami is not expected to be a significant contributor to flooding at IPEC, nor the controlling flood hazard.3.6.3 Conclusions A probable maximum tsunami event is not considered to be a significant flood hazard for IPEC for thefollowing reasons:* The results of the Regional Screening Test indicate that the likelihood of a significant tsunamialong the U.S. East Coast is low. Review of the NOAA NGDC tsunami database (NGDC, 2012)did not identify any documented, historic tsunami events along the U.S. East Coast that resultedin significant, historical tsunami impacts (runup heights greater than 2 to 3 feet).* Due to the presence of the Hudson Canyon, tsunami waves from the far-field sources areexpected to significantly refract away from the Hudson River Canyon, reducing their propagation toward the Hudson River and thereby the tsunami risk to the Hudson River. As a result, theevent resulting in the probable maximum tsunami will likely be a near-field SMF along thecontinental shelf.* Due to the significant distance of IPEC from the coast (about 60 miles) as well as the significant topographic relief present between IPEC and the coast, inundation in the vicinity of IPEC will notoccur due to coastal tsunami run-up." By inspection of the river geometry and IPEC's distance from the coast, it appears thatsignificant attenuation of waves (or bores), should any propagate up the river, will occur beforereaching IPEC.Page 3-142 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.6.4 References Abadie et al, 2009. "3D Numerical Simulations of Waves Generated by Subaerial Mass FailuresApplication to La Palma Case", Abadie S., Gandon, C., Grilli, S., Fabre, R., Riss, J., Tric, E., Glockner, S., In J. McKee Smith (Ed.), Proceedings of the 31st International Engineering Conference (pp. 1384 -1395), Hamburg, Germany:
World Scientific Publishing, 2009.Abadie et al, 2011. "Numerical Simulation of tsunami generation by the potential flank collapse of theCumbre Vieja Volcano",
Abadie, S., Harris, J., & Grilli, S., Proceedings of the Twenty-first (2011)International Offshore and Polar Engineering Conference (pp. 687-694),
Cupertino, CA: International Society of Offshore and Polar Engineers, 2011.Abadie et al, 2012. "Numerical modeling of tsunami waves generated by the flank collapse of theCumbre Vieja Volcano (La Palma, Canary Islands):
Tsunami source and near field effects",
Abadie, S.,Harris, J. C., Grilli, S. T., & Fabre, R., Journal of Geophysical
- Research, 117, 1-26, 2012.AGMTHAG, 2008. "Evaluation of Tsunami Sources with the Potential to Impact the U.S. Atlantic andGulf Coasts -An Updated Report to the Nuclear Regulatory Commission",
Atlantic and Gulf of MexicoTsunami Hazard Assessment Group (AGMTHAG),
U.S. Geological Survey, 2008.ANSI/ANS-2.8, 1992. "American National Standard for Determining Design Basis Flooding at NuclearReactor Sites", American National Standards/American Nuclear Society, ANSI/ANS-2.8-1992.
AREVA, 2013a. "Indian Point Energy Center Flood Hazard Re-evaluation
-Tsunami Screening Analysis",
AREVA Document No. 51-9196310-000, 2013.Barkan et al, 2009. "Far field tsunami simulations of the 1755 Lisbon earthquake:
Implications fortsunami hazard to the U.S. East Coast and the Caribbean",
Barkan, R., ten Brink, U. S., & Lin, J.,Marine Geology, 264, 109-122, 2009.Geist et al, 2009. "Hydrodynamic modeling of tsunamis from the Currituck landslide",
Geist, E. L.,Lynett, P. J., & Chaytor, J. D., Marine Geology, 264, 41-52, 2009.Grilli et al, 2009. "A probabilistic approach for determining submarine landslide tsunami hazard alongthe upper east coast of the United States",
Grilli, S., Taylor, O.-D. S., Baxter, C. D., & Maretzki, S.,Marine Geology, 264, 74-97, 2009.Grilli et al, 2010. "Numerical simulation and first-order hazard analysis of large co-seismic tsunamisgenerated in the Puerto Rico trench: near-field impact on the North shore of Puerto Rico and far-field impact on the US East Coast", Grilli, S. T., Dubosq, S., Pophet, N., Perignon, Y., Kirby, J. T., & Shi, F.,Natural Hazards and Earth System Sciences, 10, 2109-2010, 2010.Grilli et al, 2011. "Literature review of tsunami sources affecting tsunami hazard along the U. S. EastCoast", Grilli, S. T., Harris, J. C., & Tajalli Bakhsh, T., Center for Applied Coastal Research, University of Delaware, 2011.Grilli et al, 2012. "Status of : Modeling Tsunami Inundation and Assessing Tsunami Hazards for theU.S. East Coast", Grilli, S. T., & Kirby, J. T., NTHMP, National Weather Service Program Office, 2012.Harris et al, 2012. "Near- and Far-field Tsunami Hazard from the Potential Flank Collapse of theCumbre Vieja Volcano",
Harris, J. C., Grilli, S. T., Abadie, S., & Tajalli Bakhsh, T., Proceedings of theTwenty-second (2012) International Offshore and Polar Engineering Conference (pp. 242-249),
Rhode,Greece: International Society of Offshore and Polar Engineers (ISOPE),
2012.Knight, 2006. "Model predictions of Gulf and Southern Atlantic coast tsunami impacts from adistribution of sources",
Knight, B., Science of Tsunami Hazards, 24(5), 304-312, 2006.Page 3-143 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Krause, 2011. "Probabilistic tsunami hazard assessment to the United States East Coast", Krause, T.,MS Thesis, University of Rhode Island, Department of Civil Engineering, 2011.Mader, 2001. "Modeling the 1755 Lisbon Tsunami",
Mader, C. L., Science of Tsunami Hazards, 19(2),93-98, 2001.NGDC, 2012. "Data Retrieval
-NOAAA/WDC Tsunami Runup", NOAA National Geophysical DataCenter, retrieved November 8, 2012,http://www.ngdc.
noaa.gov/nndc/struts/form?t=
101650&s=
167&d= 166, see AREVA Document No. 51-9196310-000.
NRC, 1976. "Regulatory Guide 1.102 -Flood Protection for Nuclear Power Plants, Revision 1", U.S.Nuclear Regulatory Commission, 1976.NRC, 1977. "Regulatory Guide 1.59 Design Basis Floods for Nuclear Power Plants, Revision 2", U.S.Nuclear Regulatory Commission, 1977.NRC, 2007. "NUREG-0800:
Standard Review Plan for the Review of Safety analysis Reports forNuclear Power Plants",
U.S. Nuclear Regulatory Commission, revised March 2007.NRC, 2009. "NUREG/CR-6966:
Tsunami Hazard Assessment at Nuclear Power Plant Sites in theUnited States of America",
U.S. Nuclear Regulatory Commission, Pacific Northwest NationalLaboratory, 2009.NRC, 2011. "NUREG / CR -7046: Design Basis Flood Estimation for Site Characterization at NuclearPower Plants",
U.S. Nuclear Regulatory Commission, November 2011.NTHMP, 2012. "National Tsunami Hazard Mitigation Program Data Retrieval",
retrieved November2012, http://nthmp.tsunami.gov/index.html, see AREVA Document No. 51-9196310-000.
Twichell et al, 2009. "Morphology of late Quaternary submarine landslides along the U.S. Atlanticcontinental margin",
- Twichell, D. C., Chaytor, J. D., ten Brink, U. S., & Buczkowski, B., Marine Geology,264, 4-15, 2009.USAGE, 2002. "Estimation of Nearshore Waves", U.S. Army Corps of Engineers, U.S. CoastalEngineering Manual Part II, Chapter 3, April 2002.Whitmore et al, 2009. "NOAA/West Cpoast and Alaska Tsunami Warning Center Atlantic Oveanresponse Criteria",
- Whitmore, P., ten Brink, U., Caropolo, M., Huerfano-Moreno, V., Knight, W.,Sammler, W., & Sandrik, A., Science of Tsunami Hazards, 28,86-107, 2009.Zahibo et al, 2001. "Evaluation of tsunami risk in the Lesser Antilles",
Zahibo, N., & Pelinovsky, E. N.,Natural Hazards and Earth System Sciences, 1, 221-231, 2001.Page 3-144 AAR EVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.6-1: Historic Tsunami Run-up events along the U.S. East coasteference NGDC, 2012)Run-up MaximumHeight Maximun Run- Run-upDate Time Validity Source Source Location Run-up Location along the U.S. East Coast Measurement Type (nm) up Location Height (m)1110111755 8!50 Defiit Earthqutak Lusiton Portugal-Lagos, Portugal 30(30.-,L88.67 "l W)09/24/1848
-Probable Landslide Fishing Ships Harbor,Newfoundland, Canada06/27'1864 2230 Probable Earthquake SWAvalon Penila .--Nefwln, Cwand09/01/1886 2:51 Definite Earthquake Charleston, SC Jacksonville, FL (30.317"N,81.65"W)
Water heightmeasurement Mayport FL (30.39"N,81.43"W)
Copper River, SC {32.87"N,7993"W) 09/01/1895 11:09 Probable Earthquake HifghBridge, NJ LongIl~andt, NY(40.591N,73,79M Water height -measreent 12/06/19172 13:04 Definite Explosion
- Halifax, Nova Scotba Bedford, Nova Scota (44.729'N, 63.664"W)
- Halifax, Nova 7ScotiaDartmouth, Nova Scota (44,667"N, 63,583"W)
(44,633N,
- Halifax, Nova Scotia (44.633"N, 63.583¶W) 7 63,583"W)
Tufts Cove, Nova Scotia (44.68"N, 63.6W)'Turtle Grove, Nova Scotia (44.68"N, 63.6"W)10/11/1918 14:14 Defnite Earthquake Puto Rimo (PR),Mona Aantc city, NJ (39364N,74A423VWM Tide-gagemeassuwemut 0.06 POWta U.1Passage Agujimaeda PR(18.51'N,7.167 1111811929 20:32 Definite Earthquake
& Grand Banks, Newfoundland, Ocean City, MD (38,333"N,75.083'W)
Tide-gage measurement 0.3 Taylor's Bay, 7Landslide Canada Newfoundland Atlantic City, NJ (39.35°N,74.417W) 0.6 (46.883,N,54.26 Charleston, SC (32.75"N,79.916W) 012 7W)2 Although the tsunami of 1917 is considered definite by the NGDC, it was not caused naturally.
The tsunami was the result of an explosion that occurred from the collision of two ships in the Narrows of HalifaxHarbour.Page 3-145 AAREVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Run-up MaximumHeight Maximum Run- Run-upDate Time Validity Source Source Location Run-up Location along the U.S. East Coast Measurement Type (m) up Location Height (m)0&%1946 17:51 Dfnt Eardtqu**
Nottern Coast Daytoa Beach, FL (29 20,K81.017*
Ttgage meamenut
-Rio Boba. DR 5Dominica Republ(R)
(19A67N,69,86 Awllatc City, NJ (39.364*N,74,423*W)
Nagua DR 5(19.417N,69A.81
.. .. 7*WM08/0811946 13:28 Definite Earthquake Northeastern Coast Daytona Beach, FL (29.21"N.81.02Vi)
Tide-gage measurement San Juan, PR 0.6Dominican Republic (DR) (18.483"N,66.13 Attanbc City, NJ (39.364"N,74.423W) 3"W)0O/19964 0:10 probale Landslde
- LngIland, NY Mo NY (41.03317t.0950)
Tide-gagemeasureent 0.1 Plum IalancNY 0.28... .. ...t. .NY... ..... ....1 ) (41181"N,72.19 Plu Island N(4 81'N.72.194*M0.8
)WWUlltts Point, NfY(40,683'N73.283*W) 0.1 W.Newp.t RI (41Ai93-N,71,327.W) 0.112/26/2004 0:58 Definite Earthquake Off Sumatra, Indonesia Trident Pier, FL (28.415*N,80,593"W)
Tide-gage measurement 0.17 Indonesia (entre 50.9-country)Atlantc City, NJ (39.35"N.74.417"W) 0.11Cape May, NJ (38.97°N,74.96"W) 0.0610/28/20080 Probablie Unkinown Maline Bootltbay Harbor, MiE (3.8523N,69.6281'M~
Eyewiteas 3.6 Bootttbay 3.6Measurement Hbor, MEB...o,. ME(43.95.-N w) 6I5MPortlan ME (43642'N, 70.85', Tidegage meuremnt 0.1Soautpoti ME (43.833°N, 69.65'W)
-Fort Point NH (4.072W, 7o.712-W)
Tid.gegmeaurement 0,06Page 3-146 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.6-1: Location of IPEC relative to Hudson River features and the continental slopePage 3-147 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Figure 3.6-2: Potential tsunami source locations for the U.S. East coast in the North AtlanticOcean basinPage 3-148 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 375 W70W65W40is-40 N-35 N200 300 400 500751W 70 W65WFigure 3.6-3: Shaded relief map of the East Coast of the U.S. with interpretation showing the 48landslide areas mapped by AGMTHAG (AGMTHAG, 2008)Page 3-149 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 38200'O"W 80*0'0"W 780',W 7600'01W 740,0.W 72007WFigure 3.6-4: The additional 46 shelf transects used in Krause (Krause, 2011) each used for15,000 stochastic stability analyses of submerged slopesPage 3-150 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Et C~ (~i '- 0 -N 4(w) dwu0:18..................t 1UU~ 0 N~ -0 7 N(w) -dwu070C.10COruto It CY(w) *duna C ITvFigure 3.6-5: Time series of tsunami amplitude at a nearshore location broadside of theCurrituck Landslide for the three different slide scenarios.
(a) volume =108 km3; (b) volume =57 km3; (c) volume =128-168 km3 (Geist et al, 2009)Page 3-151 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3E2to 00CN-4I0-4O 0z n zI. ZN N 'NC=NEC,7 CYJ 1VME0 N 9 03:AX3'0Nz Z z* -* 01 N4" n'z z z zZ*- N 0 D '0r"~ 0Vf N NFigure 3.6-6: Maximum surface elevation computed with FUNWAVE in 30" regional grids for the19 mi3 CW case (Harris et al, 2012).The regional grids include N. North America (top left), S. North America (bottom left), Western Europe(top right), and Western Africa (bottom right)Page 3-152 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.7 Ice-Induced FloodingThis section addresses the effects of ice-induced flooding on the water surface elevation at Indian PointEnergy Center (IPEC).The Hudson River forms the western boundary of the site. IPEC is located on the east bank of theHudson River in Buchanan, New York, approximately 2.2 miles southwest of Peekskill, New York, and40 miles north of New York City3.7.1 MethodThe hierarchical hazard assessment (HAA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of ice-induced flooding on water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011). Thus, the flood elevations herein areconservative and intended to demonstrate the safety of SSC against ice-induced
- flooding, and notintended to represent the most realistic estimation of flood elevations due to ice-induced flooding.
The HHA approach is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and3. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992)The criteria for ice-induced flooding is provided in NUREG/CR-7046, Appendix D (NRC, 2011). Twoice-induced events may lead to flooding at the site and are recommended and discussed inNUREG/CR-7046, Appendix D including:
- a. Ice jams or dams that form upstream of a site that collapse, causing a flood wave; andb. Ice jams or dams that form downstream of a site that result in backwater flooding.
With respect to ice-induced flooding on the Hudson River, the HHA used the following steps:1. Identify largest historic ice-induced flooding event and calculate water depth.2. Conservatively calculate peak water surface elevation resulting from failure of upstream ice jam.3. Conservatively calculate peak water surface elevation from backwater effects resulting from adownstream ice jam.Page 3-153 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.7.2 Results3.7.2.1 Ice-Induced Flooding (AREVA, 2013a)3.7.2.1.1 Identify largest historic ice-induced flooding event and calculate water depthRecords of historic ice jam flood stages were downloaded from the U.S. Army Corps of Engineers (USACE) ice jam database (USACE, 2013). The largest historic ice-induced flooding event occurredMarch 23, 1948 at Hadley, NY, 180 miles upstream of IPEC. The resultant calculated flood stage waterdepth behind the ice jam was 11.35 feet.3.7.2.1.2 Calculate peak water surface elevation resulting from failure of upstream ice jamThe peak water surface elevation at IPEC was calculated for an ice jam forming and breaching at BearMountain Bridge, the first bridge upstream of IPEC. The peak flood wave height was conservatively kept constant (i.e., did not allow for attenuation as the flood wave traveled 4.32 river miles southerly ordownstream to IPEC). The resultant peak water surface elevation at IPEC was considered to be equalto the mean tide elevation at IPEC combined with the water depth of the peak flood wave from theupstream ice jam failure.The ice jam at Bear Mountain Bridge was conservatively considered to be equivalent to the largesthistoric ice jam recorded at Hadley, New York (11.35 feet high). This is conservative because there areno historic ice jams south of Albany, NY, which is approximately 100 miles upstream of IPEC.The mean tide elevation was selected as the reference
/ antecedent water surface elevation becauseunder high tide conditions the Hudson River flows south to north and would convey ice northward.
Mean tide elevation was conservatively selected over mean low tide elevations.
The mean tideelevation at IPEC was approximately 1.13 feet. The peak water surface elevation at IPEC resulting from the upstream ice jam breach was therefore calculated to be 11.35 feet plus 1.13 feet which equals12.48 feet, or 2.77 feet below the maximum allowable surface water elevation at IPEC. (IPEC, 2010and IPEC, 2011)3.7.2.1.3 Estimate peak water surface elevation from backwater effects resulting from adownstream ice jamPeak water elevation was estimated for an ice jam forming at Tappan Zee Bridge, the first bridgedownstream of IPEC (about 15.6 river miles south or downstream of IPEC). Peak flood height at IPECwas considered to be equal to the top elevation of the downstream ice jam. The resultant peak watersurface elevation at IPEC was equal to the mean tide elevation at IPEC (described above) combinedwith the water depth of the backwater from the ice jam.Similar to Section 3.7.2.1.2, the ice jam at Bear Mountain Bridge was conservatively considered to beequivalent to the largest historic ice jam recorded at Hadley, New York (11.35 feet high).The peak water surface elevation at IPEC resulting from backwater as the result of a downstream icejam was 12.48 feet, or 2.77 feet below the maximum allowable surface water elevation at IPEC. (IPEC,2010 and IPEC, 2011).3.7.3 Conclusions The peak water surface elevation at IPEC, resulting from the upstream ice jam / ice dam breach wasconservatively calculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMFpeak water surface elevation of the Hudson River at IPEC of 14.6 feet (AREVA, 2013b).Page 3-154 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The peak water surface elevation at IPEC as a result from backwater caused by the ice jam wascalculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMF peak watersurface elevation on the Hudson River at IPEC of 14.6 feet (AREVA, 2013b).These results presented above are considered to be conservative in that they are based on an historicice jam which occurred far to the north and it is unlikely that a larger ice jam would occur on the tidalportion of the Lower Hudson River. The potential for any ice jam in the vicinity of IPEC is judged to beremote because the closest reported ice jam occurred in Albany approximately 100 miles upstream in1857.Ice-induced flooding is not specifically included as a mechanism to be combined with other extremeevents as per NURGE/CR-7046 (NRC, 2011).3.7.4 References AREVA, 2013a. "Ice-Induced Flooding",
AREVA Document No. 32-9196322-000, 2013.AREVA, 2013b. AREVA Document No. 32-9196316-000, "Probable Maximum Flood on Hudson River-Hydraulics",
- January, 2013.IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
IPEC, 2011. "Indian Point 3 Updated Final Safety Analysis Report Revision 04", Entergy, 2011, SeeAREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011. (ADAMS Accession No.ML11321A195)
USACE, 2013. U.S. Army Corps of Engineers (USACE),
Ice Engineering Research Group, ColdRegions Research and Engineering Laboratory, Website:
http:icejams.crrel.usace.army.mil/,
accessedJanuary 2013, See AREVA Document No. 32-9196322-000.
Page 3-155 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.8 Channel Migration or Diversion Natural river channels may migrate or divert either away from or toward the site. The relevant event forflooding is diversion of water towards the site. There are no well-established predictive models forchannel diversions.
Therefore, it is not possible to postulate a probable maximum channel diversion event. Instead, historical records and hydrogeomorphological data should be used to determine whether an adjacent
- channel, stream, or river has exhibited the tendency to meander towards the site.(NRC, 2011).3.8.1 MethodThe channel migration and diversion flooding evaluation followed the HHA approach described inNUREGCR-7046, Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants inthe United States of America (NRC, 2011). The HHA approach used is consistent with the following standards and guidance documents:
- 1. NRC Standard Review Plan, NUREG-0800, revised March 2007;2. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977;3. NUREG/CR-7046
-Design Basis Flood Estimation for Site Characterization at Nuclear PowerPlants in the United States of America, dated November 2011; andWith respect to channel migration and diversion, the HHA used the following two steps:1. Review historical records and hydrogeologic data to assess whether the Hudson River exhibitsthe tendency to migrate towards the site.2. Evaluate present-day channel maintenance measures in place to mitigate channel migration ofthe Hudson River.3.8.2 Results3.8.2.1 Review of Historical Records (AREVA, 2013)A literature review did not yield evidence suggesting there have been significant historical diversions ofthe Hudson River near Indian Point Energy Center (IPEC) over the last century.
A comparison of 1892(UNH, 2012) and 1981 (NY GIS, 2012b) USGS Topographic maps illustrates continuity of the rivercourse over the last 120 years.The Lower Hudson Valley has been subjected to repeated glacial advance and retreat, creating typicalglacial morphology of main and tributary valleys and bedrock ledges (Sirkin, 2006). The glaciers havecontrolled the deposition of unconsolidated deposits in the region, although these are absent locallydue to erosion and excavation (GZA, 2008). Glacial till lies directly on the bedrock surface and isgenerally less than 10 feet thick, but is locally thicker against steep north-facing bedrock slopes (GZA,2008). The Lower Hudson River Valley exhibits characteristics of a fjord within the high rock walls ofthe highlands (Sirkin, 2006).Page 3-156 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The site slopes downward relatively steeply towards the Hudson River and is characterized by groundsurface elevations ranging from approximately 15 to 60 feet MSL. Much of the critical shoreline at theIPEC site is composed of vertical steel sheet pile, but some portions of the southern shore are relatively steep, riprap covered slopes. As illustrated on Figure 6.18 from the Hydrogeologic Site Investigation (GZA, 2008), the majority of the critical structures are founded on bedrock;
- however, several structures including the intake structures are located along the shoreline in the overburden material.
This sectionof shoreline is protected from the river with the vertical steel sheet pile walls. It is therefore unlikely thatthe shoreline would erode and the Hudson River divert through the site.The steep slopes and glacial lake clay soil deposits of the land surrounding the Hudson River valleynear IPEC offer the potential for landslides.
The area is considered to be an area of high landslide incidence (NYSOEM, 2011). The Hudson River is approximately 3,500 feet wide about 2.5 milesupstream of IPEC. The maximum river depth in this area is approximately 70 feet (NY GIS, 2012a).While a landslide near IPEC is possible, a large landslide involving the substantial volume of materialneeded to cutoff and divert the Hudson River is unlikely.
No evidence of landslide induced channeldiversion near IPEC was found during the literature review.3.8.2.2 Evaluation of Present Day Channel Maintenance The U.S. Army Corps of Engineers, New York District performs maintenance dredging of the HudsonRiver federal navigation
- project, as necessary to maintain the authorized project dimensions, therebyassuring safe and economical use of the Hudson River by shipping interests.
The navigational channelnear IPEC is 600 feet wide, (from New York City to Kingston),
with depths of 32 feet in soft material and34 feet in rock (USACE, 2012).3.8.3 Conclusions A review of historical data indicates that the Hudson River has not exhibited a tendency to meandertowards the site. The Hudson River is a maintained, navigable waterway near IPEC and the U.S. ArmyCorps of Engineers, New York District is responsible for maintaining navigable conditions throughperiodic dredging.
Much of the critical shoreline at the IPEC site is composed of vertical steel sheet pilewall, but some portions of the southern shore are relatively steep, riprap covered slopes. As perNUREG / CR-7046, stream channels that are steeply incised, have limited flood plains, and are locatedin geologic formations relatively resistant to erosion would not be expected to be susceptible to channeldiversion.
Given these conditions, channel migration is not considered to be a potential contributor toflooding at IPEC.3.8.4 References AREVA, 2013. "Indian Point Energy Center Flood Hazard Re-evaluation
-Channel Migration orDiversion",
AREVA Document No. 51-9196309-000, 2013.GZA, 2008. "Hydrogeologic Site Investigation",
GZA GeoEnvironmental, Inc., January 2008.NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011.NY GIS, 2012a. Hudson River Estuary Bathymetry Polyline
- Contours, New York State GISClearinghouse, http://gis.ny.gov/gisdata/inventories/details.cfm?DSID=
1136, accessed 2012, seeAREVA Document No. 51-9196309-000.
Page 3-157 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3NY GIS, 2012b. "1981 Peekskill Quadrangle, 1:24,000 Quadrangle, U.S. Geologic Survey, New YorkState GIS Clearinghouse, http:/lgis.ny.gov/gisdata/quads/drg24/indexquadname.htm#W, accessed2012, see AREVA Document No. 51-9196309-000.
NYSOEM, 2011. "2011 New York State Standard Multi-Hazard Mitigation Plan -Chapter 3.13Landslide hazard Profile",
New York State Office of Emergency Management, 2011.Sirkin, 2006. "The Hudson River Estuary -Chapter 2 -The Hudson River Valley Geological History,Landforms, and Resources",
2006.UNH, 2012. "Historic USGS Maps of New England & NY", 1892 West Point, NY Quadrangle, http://docs.unh.edu/nhtopos/nhtopos.htm, accessed 2012, see AREVA Document No. 51-9196309-000.
USACE, 2012. "Hudson River, New York North Germantown Reach Federal Navigation ProjectMaintenance Dredging"
-New York District Public Notice, U.S. Army Corps of Engineers, March 13,2012.Page 3-158 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.9 Combined-Effect FloodThis section addresses the potential for flooding at Indian Point Energy Center (IPEC) due to combinedeffect flood events.3.9.1 MethodThe hierarchical hazard assessment (HHA) approach described in NUREG/CR-7046 (NRC, 2011) wasused for the evaluation of the effects of combined flood events on water surface elevation at IPEC. TheHHA approach is a progressively
- refined, stepwise estimation of site-specific flood hazards, startingwith the most conservative simplifying assumptions that maximize flood hazards.
If the site is notinundated by the flood mechanism evaluated, a conclusion that the SSC are not susceptible to floodingis valid and no further analyses were completed (NRC, 2011). Thus, the flood elevations herein areconservative and intended to demonstrate the safety of SSC against combined events flooding, and notintended to represent the most realistic estimation of flood elevations due to combined events flooding.
- 1. The HHA approach is consistent with the following standards and guidance documents:
- 2. NRC Standard Review Plan, NUREG-0800, revised March 2007;3. NRC Office of Standards Development, Regulatory Guides:a. RG 1.102 -Flood Protection for Nuclear Power Plants, Revision 1, dated September 1976;b. RG 1.59 -Design Basis Floods for Nuclear Power Plants, Revision 2, dated August1977; and4. American National Standard for Determining Design Basis Flooding at Power Reactor Sites(ANSI/ANS 2.8 -1992).The criteria for combined events floods are provided in NUREG/CR-7046, Appendix H and consist ofconsidering the following scenarios:
- 1. Floods Caused by Precipitation Events (NUREG/CR-7046, Appendix H, Section H.1)2. Floods Caused by Seismic Dam Failures(NUREG/CR-7046, Appendix H, Section H.2)3. Floods along the Shores of Open and Semi-Enclosed Bodies of Water(NUREG/CR-7046, Appendix H, Section H.3)4. Floods Caused by Tsunamis (NUREG/CR-7046, Appendix H, Section H.5)Tsunamis have been screened out as a potential flood mechanism at IPEC and therefore arenot subject to combined event flood analysis (AREVA, 2013c).The combined event evaluation for IPEC was conducted for the above applicable scenarios asdescribed in AREVA, 2013a for Floods Caused By Precipitation Events and Seismic Dam Failures andSection 3.4.2.5 and AREVA 2013d for Floods Along the Shores of Open and Semi-Enclosed Bodies ofWater and used the following steps:" Calculate the wind wave effects and wave runup on the Hudson River at IPEC.* Calculate the Probable Maximum Water Elevation on the Hudson River at IPEC resulting fromthe combined-effect flood.Page 3-159 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 33.9.2 ResultsThe results of the combined effect flood evaluation are summarized in Table 3.9-1. Floods along theShores of Open and Semi-Enclosed Bodies of Water (due to coastal storm surge) resulted in thehighest calculated combined flood elevation.
The potential combined effect scenarios are discussed below.Floods Caused by Precipitation Events (NUREG/CR-7046, Appendix H, Section H.1)Three alternatives for Floods Caused by Precipitation Events were evaluated in AREVA, 2013a. Thehighest flood level results from the peak water surface elevation on the Hudson River at IPEC due tothe Probable Maximum Flood (PMF) including hydrologic upstream dam failure, as described inAREVA,2013b.
The bounding stillwater elevation for flood events is 14.9 feet NGVD29. This scenario, with the inclusions of wave runup induced by 2-year wind speeds, is described as Alternative 3 ofSection H.1 of Appendix H of NUREG/CR-7046.
Floods Caused by Seismic Dam Failures(NUREG/CR-7046, Appendix H, Section H.2)The results of the dam failure calculation, (AREVA,2013b),
indicate that flood elevations from seismicdam failures (NUREG/CR-7046, Appendix H.2) resulted in a peak stillwater elevation of 13.5 feet atIPEC and is bounded by PMF with coincident hydrologic dam failure on the Hudson River that resultedin a peak stillwater elevation of 14.9 feet at IPEC. No overtopping of the shoreline bulkhead will occur.Therefore, further calculations to address NUREG/CR-7046 Appendix H.2 are not necessary.
Floods along the Shores of Open and Semi-Enclosed Bodies of Water (NUREG/CR-7046, Appendix H,Section H.3)As described in Section 3.4.2.5, Alternative 3 of Section H.3 of NUREG/CR-7046 (the combination ofthe 25-year flood in the stream, the probable maximum storm surge and seiche with wind-wave
- activity, and the antecedent 10 percent exceedance high tide) resulted in the highest flood elevation.
Probabilistic analysis of storm surge indicates that the storm surge flood elevation at IPEC associated with a 2x10-6 annual exceedance probability, including storm surge, tidal flow, projected sea level riseand steady-state river flow associated with a 25-year return period in the Hudson River, is elevation 14.8 feet NAVD88 (15.8 feet NGVD29).
The wave crest elevation is calculated to be 16.3 feet. Thelimit of wave run-up elevation is calculated to be 17.7 feet.3.9.3 Conclusions At IPEC, the bounding condition for impacts to the site from combined event on the Hudson Rivercombined with wind generated waves are summarized below.The wind generated wave crest applied along the critical direction on the Hudson River at IPEC wascalculated to be 0.5 feet (elevation 16.3 ft NGVD29);
and wave runup was calculated to be 1.9 feet(elevation 17.7 ft NGVD29).The bounding stillwater elevation for coastal flood events (the combination of the 25-year flood in thestream, the probable maximum storm surge and seiche with wind-wave
- activity, and the antecedent 10Page 3-160 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3percent exceedance high tide) is calculated to be 15.8 feet (AREVA, 2013d). This scenario, with theinclusions of wave runup induced by coincident wind speeds, is described as Alternative 3 of SectionH.3 of Appendix H of NUREG/CR-7046.
The Maximum Water Elevation resulting from combined events on the Hudson River at IPEC wascalculated as the sum of the bounding flood event (stillwater elevation 15.8 feet) and the coincident wind wave runup (0.5 feet). This Maximum Water Elevation resulting from combined coastal eventswas calculated to be elevation 17.7 feet.The results indicate that the combined effects flood maximum water elevation on the Hudson River atIPEC resulting from combined-effect flood is above the plant grade elevation of 15.0 feet (IPEC, 2010).3.9.4 References AREVA, 2013a. "Combined Events Flood Analysis
-Riverine",
AREVA Document No. 32-9196323-000, 2013.AREVA, 2013b. "Dam Failures",
AREVA Document No. 32-9196316-000, 2013.AREVA, 2013c. "Tsunami Screening Evaluation",
AREVA Document No. 51-9196310-000, 2013.AREVA, 2013d. "Flood Hazard Re-evaluation
-Combined Effect Floods -Coastal Processes forIndian Point Energy Center",
AREVA Document No. 32-9213356-000, 2013.IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
NRC, 2011. "Design Basis Flood Estimation for Site Characterization at Nuclear Power Plants -NUREG/CR-7046",
U.S. Nuclear Regulatory Commission, November 2011, (ADAMS Accession No.ML1 1321A195).
Page 3-161 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 3.9-1: Combined Effect Flood Scenario Summary ResultsScenario Stillwater (ft) Wave (ft)(e) Combined (ft)Floods Caused by 14.9 1.7 16.6Precipitation Events(e)
Floods Caused by 13.5 (a) (a)Seismic Dam FailuresFloods along the 15.8(b) 0.5 16.3/17.7 (c)Shores of Open andSemi-Enclosed Bodies of WaterFloods Caused by (d) (d) (d)TsunamisNotes:(a) Combined Event analysis not required.
Dam Failure is included in Flood Caused byPrecipitation Events(b) Based on estimated annual exceedance probability 2x10-6 storm surge event(c) Wave elevation/Limit of wave run-up(d) Effects of tsunamis were screened out as a controlling flood mechanism at IPEC(e) Waves for Precipitation Event are based on 2-year wind and are essentially deepwater wavesfor purposes of comparison with the waves calculated for the coastal surge which are based onhurricane winds.Page 3-162 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.0 COMPARISON OF CURRENT AND REEVALUATED FLOOD CAUSING MECHANISMS 4.1 Summary of Current Licensing Basis and Flood Reevaluation ResultsThis section compares the current and reevaluated flood-causing mechanisms.
It provides acomparison of the CLB flood elevation to the reevaluated flood elevation for each applicable flood-causing mechanism.
A comparison of the CLB elevations and the reevaluated flood elevations isprovided in Table 4.1-1.Screened mechanisms have been evaluated at a high level and determined to not be applicable to theflooding hazard for IPEC.4.1.1 Local Intense Precipitation 4.1.1.1 Current Licensing BasisThe CLB does not include an evaluation of LIP. Localized PMP was evaluated as part of IPEEE forUnit 2 and Unit 3, utilizing storm parameters presented in HMR-51 and HMR-52.The IPEEE evaluation for Unit 2 concluded that ponding could occur on the IPEC Unit 2 site, however,PMP related flood levels would not exceed the design allowable water buildup at safety-related SSC(IPEEE, 1995, IPEC, 2012a).The IPEEE evaluation for Unit 3 concluded that there were no pathways in the vicinity of safety-related SSC that would allow precipitation runoff to penetrate any buildings (IPEEE,1997).
4.1.1.2 Reevaluated Flood Elevation In the immediate vicinity of Unit 2, the maximum water surface elevations are up to elevation 19.0 feetin the transformer yard. The calculated flood elevation varies between 0 and 0.2 feet higher thanbuilding entrances abutting the Unit 2 Transformer Yard.In the immediate vicinity Unit 3 the maximum water surface elevations are up to elevation 19.2 feet inthe transformer yard. The calculated flood elevation does not exceed building entrances abutting theUnit 3 Transformer Yard.Details of this evaluation are provided in Section 3.1.4.1.1.3 Comparison As the CLB does not include localized PMP effects, direct comparison is not possible.
The new evaluation resultsin higher flood levels than the IPEEE evaluation, and results in impacts to safety-related SSC at Unit 2.4.1.2 Flooding on Rivers and Streams4.1.2.1 Current Licensing BasisThe PMF in the Hudson River with no tidal influences is defined in the Unit 2 FSAR as 1,100,000 cfs,resulting in a water surface elevation of 12.7 ft (IPEC, 2010).4.1.2.2 Reevaluated Flood Elevation The PMF in the Hudson River at IPEC after hydraulic routing within HEC-RAS is conservatively calculated at 1,185,300 cfs. Historical records do not indicate flooding in excess of this PMF flow.Page 4-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3The peak PMF water surface elevation at Indian Point Energy Center is 14.6 feet, which is 0.4 feetbelow the plant grade elevation of 15.0 feet (IPEC, 2010 and IPEC, 2011).Based on the re-evaluated peak PMF elevation on the Hudson River at IPEC, the peak PMF watersurface elevation from the Hudson River flood is below the plant grade elevation.
Details of this evaluation are provided in Section 3.2.4.1.2.3 Comparison The results of the new evaluation are 1.9 ft higher than the CLB for PMF on the Hudson River. Theresulting PMF elevation remains below the site grade of 15.0 ft.4.1.3 Dam Breaches and Failures4.1.3.1 Current Licensing BasisThe CLB reports a failure of the Ashokan Dam coincident with a Standard Project Flood on the HudsonRiver to have a resulting flow rate of 705,000 cfs. The peak water elevation associated with this eventat IPEC is 7.2 ft (IPEC, 2010).4.1.3.2 Reevaluated Flood Elevation The controlling dam failure scenario is the hydrologic event (PMF) with the forced failure ofConklingville Dam. Combination of the dam breach outflow and PMF at IPEC after hydraulic routing iscalculated to be 1,217,700 cfs. The resultant peak water surface elevation from the combined dambreach peak outflow and PMF in the Hudson River at IPEC is 14.9 feet, which is 0.1 feet below theplant grade elevation of 15.0 feet.Details of this evaluation are provided in Section 3.3.4.1.3.3 Comparison The new evaluation uses a different dam and a higher base river flow. The resulting flood elevation is7.7 ft higher than the CLB. The resulting flood elevation is below the site grade of 15.0 ft.4.1.4 Storm Surge4.1.4.1 Current Licensing BasisThe CLB does not include a separate evaluation of flooding solely due to storm surge. The IPEC CLBof elevation 15 feet NGVD29 provides plant storm surge protection.
4.1.4.2 Reevaluated Flood Elevation The reevaluated storm surge due to a hurricane with tidal flow and sea level rise is calculated to be15.8 feet based on an annual exceedance probability of 2x10-6.4.1.4.3 Comparison The reevaluated storm surge elevation exceeds the CLB by 2.3 ft (15.8 ft vs. 13.5 ft).Page 4-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.1.5 Seiche4.1.5.1 Current Licensing BasisProbable Maximum Seiche caused flooding was not evaluated as part of the CLB.4.1.6 Tsunami4.1.6.1 Current Licensing BasisFlooding from tsunamis was not evaluated quantitatively because flood from a tsunami was notscreened out by other flood mechanisms (IPEC, 2011, Section 1.3.1).4.1.6.2 Reevaluated Flood Elevation The Probable Maximum Tsunami is not considered to be a significant flood hazard for IPEC due to theinland location of the site, the necessary geometry of a tsunami wave to enter the Hudson River, andthe predicted attenuation of a tsunami wave traversing the Hudson River.Details of this evaluation are provided in Section 3.6.4.1.6.3 Comparison Tsunamis were not evaluated as part of the CLB, so no direct comparison is possible.
Based on thenew evaluation, the probable maximum tsunami event would not impact safety-related SSC at IPEC.4.1.7 Ice-Induced Flooding4.1.7.1 Current Licensing BasisIce-induced flooding was not evaluated as part of the CLB.4.1.7.2 Reevaluated Flood Elevation The peak water surface elevation at IPEC, resulting from the upstream ice jam / ice dam breach wasconservatively calculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMFpeak water surface elevation of the Hudson River at IPEC of 14.6 feet.The peak water surface elevation at IPEC as a result from backwater caused by the ice jam wascalculated to be 12.48 feet, 2.77 feet below site grade. This was bounded by the PMF peak watersurface elevation on the Hudson River at IPEC of 14.6 feet.Details of this evaluation are provided in Section 3.7.4.1.7.3 Comparison Ice-induced flooding was not evaluated as part of the CLB, so no direct comparison is possible.
Basedon the new evaluation, ice-induced flooding elevations are bound by the PMF on the Hudson River.4.1.8 Channel Migration or Diversion 4.1.8.1 Current Licensing BasisMigration of the Hudson River is not evaluated as part of the CLB.Page 4-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.1.8.2 Reevaluated Flood Elevation A review of historical data indicates that the Hudson River has not exhibited a tendency to meandertowards the site. The Hudson River is a maintained, navigable waterway near IPEC and the U.S. ArmyCorps of Engineers, New York District is responsible for maintaining navigable conditions throughperiodic dredging.
Details of this evaluation are provided in Section 3.8.4.1.8.3 Comparison Channel Migration was not evaluated as part of the CLB, so no direct comparison is possible.
Due tothe geology of the watershed and man-made controls on the Hudson River, channel migration is notconsidered a hazard for IPEC.4.1.9 Combined Effect Flooding4.1.9.1 Current Licensing BasisThe controlling CLB flood level is the dam failure water level coincident with a probable maximumhurricane, resulting in a stillwater elevation of 14.0 ft. Wave runup was determined to be 1.0 ft,resulting in a maximum water surface elevation of 15.0 ft (IPEC, 2010).The NRC performed an independent evaluation of combined event flood elevations for Unit 2 (NRC,1988). The result of this evaluation was a stillwater elevation of 15.0 ft with 3.25 ft of wave runup,resulting in a maximum water surface elevation of 18.25 ft. This evaluation concluded that the physicalseparation of safety related SSC from the river bank provided a sufficient attenuation distance tomitigate this wave runup height.4.1.9.2 Reevaluated Flood Elevation The Maximum Water Elevation resulting from combined external flood effects, is associated withcoastal processes and includes storm surge, 25-year storm-related river flooding, antecedent 10percent exceedance tide, and coincident wind-generated wave activity.
The flood associated with astorm surge stillwater annual exceedance probability of 2 x 10.6 is calculated to be 15.8 feet. The wavecrest elevation is calculated to be 16.3 feet. The limit of wave run-up elevation is calculated to be 17.7feet.Details of this evaluation are provided in Section 3.9.4.1.9.3 Comparison The 17.7 ft elevation of the new evaluation exceeds the CLB combined event elevation by 2.7 ft.However, the 17.7 ft combined event elevation is bound by the NRC independent evaluation value of18.25 ft, which was considered to not impact safety-related SSC at IPEC as described in Section4.1.9.1.Page 4-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 34.2 Summary of Walkdown FindingsThe following sections provide summaries of walkdown findings for the two UPEC units from (IPEC,2012a and IPEC 2012b).4.2.1 IPEC Unit 2 Walkdown Findings (IPEC, 2012a)There were some observed conditions of features that did not meet the NEI 12-07 acceptance criteria.
These conditions were entered into the plant Corrective Action Program;
- however, only two of theseobservations were determined to be deficiencies as defined in NEI 12-07. The operability determinations for these deficient conditions concluded that the features did not pose a threat tooperability.
A feature found to be deficient was Item IP2-CTL-001, a double door between the 480V switchgear room and the transformer yard. It was observed that the bottom seal on the east section of Item IP2-CTL-001 was degraded.
Light could be seen and air cold be felt coming through the seal area. A workorder was created to repair the deficient condition.
An existing observation in the CAP identified an incident of water intrusion into the 480V Switchgear room in the Control Building during a volumetric data test of the #22 moat. In-leakage was observednear the north east corner of this room. Repairs to the moat have been made and the latest moat testshowed no indication of water leakage into the room.There were several conduits whose internal seals are currently not part of a preventive maintenance program.
These include the conduits that run from Manhole 24 to the 480V Switchgear room and thosethat run from Manhole 21 to the Zurn Strainer Pit.4.2.2 IPEC Unit 3 Walkdown Findings (IPEC, 2012b)There were some observed conditions of features that did not meet the NEI 12-07 acceptance criteria.
These conditions were entered into the plant Corrective Action Program (CAP); however, only four ofthese observations were determined to be a deficiency as defined in NEI 12-07. The operability determinations for the deficiencies concluded that the features did not pose a threat to operability.
A manhole near the southwest corner of the Diesel Generator
- Building, Manhole D1, contains backflowprevention for the building.
A 2 ft flapper valve is located in the manhole and prevents any site drainageor river high water level from backing up into the Diesel Generator Building.
During a visual inspection, it was noted the valve did not fully close and seal completely.
This valve has subsequently beenreplaced."
During preparations for Hurricane Sandy from 10/27/2012-10/29/2012, sandbagging was initiated around the IP3 Intake Structure Service Water Pump motors and around the Zurn Strainer Pit inside theIP3 Intake Structure.
Several issues were identified:
" There does not appear to be a dedicated sand pile solely for use for flooding mitigation toassure there will be enough sand available to meet the requirements of the flood procedure.
" The flood procedure does not cross-reference the maintenance procedure which provides thedetails and extent of the sandbagging requirements.
Page 4-5 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3" The sandbagging requirements of the maintenance procedure need to be revisited, as itrequires the building of a berm six feet tall and two sandbags deep around the perimeter of theservice water pumps." The maintenance procedure does not address the sandbagging around the Zurn Strainer Pitarea.* It was observed that three persons were only able to fill 300 sandbags over a period of roughlyone day. This number of sandbags is not adequate to meet the needs of the plant in a CLBflood event.It was also observed during the reasonable simulations that the flood procedure did not correctly identify the location of the temporary pumps on the 33 ft Elevation of the Unit 1 Turbine Building andthe incorrect valve number for the Zurn strainer pit sump pump discharge isolation valve wasreferenced in the procedure.
These conditions have been corrected by the purchase of pre-filled sandbags staged on pallets, Tiger Dam flood barriers and revision of appropriate procedures.
Water damage was observed during a visual inspection of IP3-CTL-009.
Box XV2, located in the 480VSwitchgear room of the IP3 Control Building, showed signs of prolonged exposure to water on theterminals.
There were two conduits that penetrate the south wall and one that penetrates the east wall of theStrainer Pit that do not have internal seals and therefore are potential leak paths into the pit. The 4 inchand 2 inch conduits that penetrate the south wall terminate in Manhole 31. Subsequent inspection ofManhole 31 observed that these conduits are not sealed at the manhole either. The termination point ofthe 2 inch conduit that penetrates the east wall is unknown.
Plant procedures have been revised toprotect manhole 31 from river flooding by sandbagging around the manhole.There were several conduits whose internal seals are currently not part of a preventive maintenance program.
These include the conduits that run from Manhole 34 to the 480V Switchgear room and thosethat run from Manhole 31 to the Zurn Strainer Pit. A PM program is now in place to periodically inspectthese seals.4.3 Impacts of Flood Elevations Based on the results of the new flood evaluation, four flood mechanisms exceed the IPEC CLB forthose specific mechanisms.
Flooding due to combined effects from coastal processes exceeds the CLB by 2.7 ft. However theNRC independent evaluation (NRC, 1988), which predicted a combined effect flood level of 18.25 ft,indicated that wave runup would not impact safety-related SSC at IPEC due to sufficient physicalseparation from the river edge. The NRC evaluation bounds the new flood results, and as a result thenew combined effect evaluation will not impact safety-related SSC at IPEC.The results of the new flooding on streams and rivers is 14.6 ft, compared to 12.7 ft in the CLB forstreams and rivers. The results of the new flooding due to dam failures is14.9 ft compared to 7.2 ft inthe CLB for dam failures.
Both reevaluations of the flooding on streams and rivers and dam failuresresult in flood elevations less than site grade or 15 ft.LIP caused flooding of the Unit 2 transformer yard results in 0.0 ft to 0.2 ft above door entry levels,which could impact safety-related SSC. Maximum water depths in the vicinity of the doors adjacent tothe Unit 2 transformer yard are shown in Table 4-2. Pre-filled Sandbags have been staged in thePage 4-6 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3transformer yards and procedures revised to protect all of the vulnerable doors with respect to thebeyond-CLB LIP event.4.4 References IPEC, 2010. "Indian Point 2 Updated Final Safety Analysis Report Revision 22", Entergy, 2010, SeeAREVA Document No. 38-9193643-000.
IPEC, 2011. "Indian Point 3 Updated Final Safety Analysis Report Revision 04", Entergy, 2011, SeeAREVA Document No. 38-9193643-000.
IPEC, 2012a. "Indian Point Energy Center Unit 2 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding",
Entergy Nuclear, Engineering Report No. IP-RPT-12-00036, November 2012, See AREVA Document No. 38-9193643-000.
IPEC, 2012b. "Indian Point Energy Center Unit 3 Flooding Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Flooding",
Entergy Nuclear, Engineering Report No. IP-RPT-12-00038, November 2012, See AREVA Document No. 38-9193643-000.
IPEEE, 1995. "Individual Plant Examination of External Events for Indian Point Unit No. 2 NuclearGenerating Station",
Consolidated Edison Company of New York, Inc., December 1995, See AREVADocument No. 38-9193643-000.
IPEEE, 1997. "Indian Point Three Nuclear Power Plant -Individual Plant Examination of ExternalEvents",
New York Power Authority, IP3-RPT-UNSPEC-02182, September 1997, See AREVADocument No. 38-9193643-000.
NRC, 1988. "External Flooding Condition Technical Specifications for Indian Point Nuclear Generating Unit No. 2 (TAC No. 51921)",
U.S. Nuclear Regulatory Commission, November 15 1988.Page 4-7 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4.1-1: Flood Elevation Comparisons New Elevation Mechanism CLB Elevation (ft) (NGVD29)**..
(NGVD29)
(ft) Difference (ft)Local Intense Precipitation Unit 2 See Table 4-2 19.0 See Table 4-2Unit 3 See Section 4.3 19.2 BoundProbable Maximum Flood (PMF)- 12.7 14.6 +1.9, Bound***Hudson River (Tide Elev. at Battery5.35 ft.)PMF Including Local Oscillatory Wave 13.7 NE N/APMF and High Tide 12.4 14.6 +2.2, Bound***(Tide Elev. at Battery +2.2 ft.) (Tide Elev. at Battery5.35 ft.)PMF and High Tide Including Local 13.4 NE N/AOscillatory WavePMF and Low Tide 13.0 NE N/APMF and Low Tide Including Local 14.0 NE N/AOscillatory WaveStandard Project Flood and Ashokan 7.2 NE N/ADam FailurePMF and Dam Failure NE 14.9 N/AStandard Project Flood and Ashokan 8.2 NE N/ADam failure Including Local Oscillatory WavePMF and Dam Failure with Coincident NE 15.8 N/AWind-Wave ActivityProbable Maximum Hurricane (PMH) 13.5 NE N/Aand Spring High TideProbable Maximum Hurricane (PMH) 14.5 NE N/Aand Spring High Tide Including LocalOscillatory WavePage 4-8 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4.1-1: Flood Elevation Comparisons (cont.)Standard Project Hurricane and Standard 13.0 NE N/AProject Flood on Hudson RiverStandard Project Hurricane and Standard 14.0 NE N/AProject Flood on Hudson River Including Local Oscillatory WaveStandard Project Flood plus Standard 14.0 NE N/AProject Hurricane plus Dam FailureStandard Project Flood plus Standard 15.0 NE N/AProject Hurricane plus Dam FailureIncluding Local Oscillatory WaveHurricane resulting in 500,000-Year Surge NE 15.8 N/Aplus 25-Year Flood on Hudson River and 10Percent Exceedance High TideHurricane resulting in 500,000-Year Surge NE 17.7 N/Aplus 25-Year Flood on Hudson River and 10Percent Exceedance High Tide withCoincident Wind-Wave ActivitySeiche N/A Screened N/ATsunami N/A Screened N/A,Bound***Ice-Induced Flooding N/A 12.48 N/A,Bound***Channel Migration or Diversion N/A Screened N/ACombined Effects Flooding 15.0/ 18.25* 17.7 +2.7/-0.5*** Note: The NRC independently calculated the probable maximum combined effect flood to be a stillwater level of 15.0 ft pluswave runup of 18.25 ft, and this flood level had no impact to safety-related SSC.** Note: Value conservatively rounded down.***Note:
"Bound" indicates that the flood hazard has increased for a specific flood mechanism, but does not exceed the plantdesign****Note:
All values are from Table 2.5-1 of Unit 2 UFSAR Rev 22NGVD29 is equivalent to MSLCLB Combined Effects Flooding is based on Standard Project Flood plus Standard ProjectHurricane plus Dam Failure with Coincident Wind-Wave Activity.
Reevaluated Combined Effects Flooding based oncombination of the 25-year flood in the stream, the hurricane resulting in 500,000-year storm surge with wind-wave
- activity, and the antecedent 10 percent exceedance high tideNE indicates mechanism not evaluated.
Page 4-9 AAREVADocument No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Table 4-2: Unit 2 Transformer Yard Doorway LIP Flood ImpactsFlood Elevation (ft) Water Depth at DoorUnit 2 Doorway Door Elevation (ft) near Door (f)U2-PAB-1 18.9 18.9 0.0U2-ABFP-1 18.6 18.5 -0.1U2-ABFP-2 18.7 18.8 +0.2U2-ABFP-2 18.7 18.8 +0.2U2-CB-1 18.7 18.9 +0.2Page 4-10 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 35.0 INTERIM EVALUATION AND ACTIONS TAKEN OR PLANNEDStorm surge and combined effects resulting from the postulated hurricane is the bounding event thatexceeds the Current Licensing Basis (CLB) flood level. These results are shown below in Section 5.1.Additional results for the new flooding on streams and rivers is 14.6 ft, compared to 12.7 ft in the CLBand the new flooding due to dam failures is14.9 ft compared to 7.2 ft in the CLB for dam failures.
Bothreevaluations of the flooding on streams and rivers and dam failures result in flood elevations less thansite grade or 15 ft and are thus bounded by the storm surge and combined events results.Although not part of the CLB, Local Intense Precipitation (LIP) based on the new hazard evaluation willproduce ponding in the transformer yard areas that will require certain doors to be protected fromflooding.
This section describes the interim actions to be taken to mitigate the effects of the Surge andLIP.Activities to mitigate the effects of External Flood events are performed in accordance with Operations and Maintenance procedures.
Both Sandbag and Tiger Dam placement is controlled by maintenance procedure 0-MET-402-GEN.
The guidance set forth in the maintenance procedure for placement ofsandbags is based on guidance contained in literature for good practices.
Placement of the Tiger Damsis in accordance to manufacturer's instructions.
Since the wave crest elevation is only projected to be1.3 ft above the flood stage level, the wall height of the sandbags, only approximately 3 ft, and theplacement locations either indoors or in outdoor areas shielding from direct wave action, it is notanticipated that the sandbag walls or Tiger Dams will be adversely affected by the floodwaters.
Evenconservatively considering wave run up heights estimated to be 2.7 ft above flood stage, a 3 ft tallsandbag or Tiger Dam wall has margin. With the exception of the protection of manholes 21, 23, 31, 33& 37, the interim actions described herein have been in place since July of 2011.5.1 Storm Surge and Local Intense Precipitation The results of the evaluation for Storm Surge in Section 3.4 for a 500,000 year storm determined thatthe maximum water levels at the waterfront as a result of the postulated hurricane are as follows:Stillwater Elev. Wave Crest Limit of Run-upElev. Elev.15.8' 16.3' 17.7'These levels exceed the maximum CLB stillwater Elevation of 15' resulting from the postulated stormsurge combined with the 25 year flood, 10% antecedent high water level and wave action. The stormsurge results govern over the LIP for areas located below the 18' elevation.
IPEC currently has actions in place to protect vital SSC located in the following areas of the facility toflood levels up to El. 17'-11'"
and the postulated LIP event:* Unit 2 Intake Structure (Service Water Pumps)* Unit 3 Intake Structure (Service Water Pumps)* Unit 2 480 Volt Switchgear RoomPage 5-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3" Unit 3 480 Volt Switchgear Room* Unit 2 Turbine Building for MCC 24A" Unit 3 Turbine Building for MCC 34" Unit 3 Emergency Diesel Generator Building" Unit 2 Service Water Valve Pit* Unit 3 Service Water Valve PitDue to the general elevation of the transformer yard (Elevation 18') and location with respect to theriver, river flooding will not affect the transformer yard. As a result, with the stillwater elevation postulated to be 15.8', storm surge will not affect this area. Only ponding resulting from the LIP needsto be considered.
This affects the following plant components:
" Door 224 (U2-ABFP-1)
- Door 225 (U2-ABFP-2)
- Door 226 (U2-ABFP-3)
- Door 227 (U2-PAB-1)
- Door 229 (U2-CB-1)
- Door 215 (U3-ABFP-1)
" Door U3-ABFP-2
" Door 212 (U3-ABFP-3)
" Door FDR-11-PA (U3-PAB-1)
" Door 305 (U3-PAB-2)
" Door 208 (U3-CB-1)
Current LIP mitigation strategies for the above doors are in place.No actions are required for flooding due to mechanisms other than LIP or storm surge events. Floodsdue to all other mechanisms have peak elevations below the plant's CLB or are bounded by the LIP orstorm surge events.5.1.1 Intake Structure The Intake Structures at both Unit 2 and Unit 3 are difficult targets to defend from the postulated stormsurge levels due to their proximity to the shoreline.
The vulnerable components at the Intake Structure are the Service Water Pump Motors which are located on top of the pumps at an approximate bottomelevation of 18'. The pump and motors are protected from direct wave action due to large equipment (traveling screen system) located between them and the river. The maximum stillwater river level fromthe 500,000 year storm is 15.8 ft and including wave run up is 17.7 ft, which are both below theapproximate elevation of the pump motors and should not adversely affect pump operation.
However,Page 5-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3mitigating actions are in place to keep the river flood waters from directly impacting the pumps/motors up to a level of 17'-11" through the placement of sandbags.
5.1.2 Protection of the Unit 2 and Unit 3 480V Switchgear RoomsSwitchgear rooms at Unit 2 & 3 are protected up to a river water elevation of 17'-11".
These areas areaway from the river front and their access points are located within the existing Turbine Buildings.
Although the Turbine Buildings will be allowed to flood, the buildings will protect the access doors to theSwitchgear rooms from wave action. The expected water elevations at the access door locations areequal to the determined stillwater elevation of 15.8 ft. As a result, the mitigating actions are sufficient toprotect the Switchgear rooms. These actions are summarized below:* The Unit 2 480 Volt Switchgear Room is located at El. 15-0" in the Control Building.
There aremultiple locations that require flood protection.
The first is the fire door just outside of Door 234and the second is Door 235. There are also three floor drains and six hub cleanouts.
TigerDams and or sand bags will be used for Door 235 since this area is clear of interferences and isrelatively flat. Sand bags will be used at Door 234 since there is no water source in the vicinityto fill the Tiger Dam. Inflatable drain plugs will be used to seal the floor drains and hubcleanouts.
" The Tiger Dam comes in a standard 50' length. A single 50' long tube can be pinched asnecessary to reduce the length. Three Tiger Dams are required at Door 235 setup in a pyramid(two tubes followed by one on top). The water source for Door 235 is FP-150 which has a hoseassembly that is adequate to reach the Tiger Dam location.
An additional coupler is required toattach the fire hose to the Tiger Dam prior to filling with water." Considering a sand bag wall that is 2 sand bags deep and 3 foot tall is approximately 12 sandbags per foot. One foot of height is required on the 6'-5" side because a concrete wall alreadyexists which is 25" tall. This results in approximately 4 sandbags per foot." The Unit 3 480 Volt Switchgear Room is located at El. 15'-0" in the Control Building and alreadyhas a flood barrier that is 4'-0" tall (verified via field measurements) located directly outside FireDoor FDR-1-CG.
- However, this flood barrier is typically removed during outages to allow craftto enter and exit the Switchgear Room more quickly.
Therefore, if this flooding event were tooccur during an outage, the 480 Volt Switchgear Room would be vulnerable.
The flood barrierwill be reinstalled in the event that this flood scenario occurs during an outage, or, in the unlikelyevent that the flood barrier cannot be re-installed, sand bags will be utilized.
In addition to the measures discussed above, manholes 21,23,31,33 and 37 will be protected by theplacement of sandbags.
These manholes contain conduits that communicate with the Unit 2 & 3switchgear rooms and require protection from inundation by the storm surge. Due to the potential ofgroundwater intrusion and some sandbag leakage, and to enhance this protection, these conduits willbe sealed as discussed in Section 6 of this report.Page 5-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 35.1.3 Protection of MCC 24A & 34AThese MCCs are located in the Turbine Buildings and provide power to certain EDG auxiliaries, including the EDG Compressors, Jacket Water Heaters and Lube Oil Heaters.
As with the doors to theswitchgear rooms, the expected water elevations at the MCC locations are equal to the determined stillwater elevation of 15.8'. The protections set up are adequate to protect these MCC's from thepostulated flood. These protection descriptions are summarized below are based on the protection levelup to elevation 17'-11 ".* MCC 24A is located at El. 15' in the Unit 2 Turbine Building.
Two existing concrete wallsprovide adequate flood protection on the north and east sides and a 1 ft tall concrete curbsurrounds the south and west sides. In order to provide flood protection up to 17'-11",
TigerDams will be used on the south and west sides of the MCC." Three standard Tiger Dams are required around MCC 24A setup in a pyramid (two tubesfollowed by one on top). The proposed water source for the MCC 24A Tiger Dam is FP-686,which has a hose assembly that is adequate to reach the Tiger Dam location.
An additional coupler is required to attach the fire hose to the Tiger Dam prior to filling with water." MCC 34 is located at El. 15' in the Unit 3 Turbine Building.
There is adequate clearance on thesouth and west sides to install Tiger Dams. These features will provide flood protection to aheight of 17'-11".
For the north side sand bags or equivalent barrier will be used since the floorspace available is considerably smaller than the other sides. Additional plastic sheeting can beused as well to supplement the sand bags.* Three standard Tiger Dams are required around MCC 34 setup in a pyramid (two tubes followedby one on top). The proposed water source for the MCC 34 Tiger Dam is FP-149, which has ahose assembly that is adequate to reach the Tiger Dam location.
An additional coupler isrequired to attach the fire hose to the Tiger Dam prior to filling with water.5.1.4 Protection of Unit 3 EDG Diesel CellsThe Unit 3 EDG diesels are located in the Unit 3 Control Building at the 15' elevation.
The EDG dieselsare located in separate reinforced concrete cells adjacent to the 480V switchgear room. The current 4'tall wall in front of the entrance to the switchgear room will protect the diesel cells from floodwaters entering through the access doors to the room and cells.The other area of vulnerability for flooding of the diesel cells is through the drain pipes located in thesumps of each cell. These drain lines are connected to a common drain header that discharges tomanhole D-1 located outside and south of the Control Building.
Manhole D-1 then discharges into theriver. To prevent river water from being able to back up into the diesel cells through the common drainheader, a flapper valve is installed at the discharge point of the drain header in Manhole D-1. Thisvalve acts as a check valve that is shut against the header pipe when water floods the manhole.
Thisvalve was recently replaced as a result of the Fukushima flooding walk down inspections.
Page 5-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3Therefore, the Unit 3 EDG cells are currently protected from the new flooding hazard and require noadditional interim measures.
5.1.5 Protection of Unit 2 & 3 Service water Valve PitThe Unit 2 & 3 Service water Valve Pits are located just west and outside of the Turbine Buildings.
Theopenings to these pits are approximately located at the 15' elevation and would be subject to flooding.
These pits contain manually operated valves that allow operations personnel to swap service waterheaders as necessary during plant operations.
During the postulated hurricane that produces the stormsurge, it is not expected that these valves will need to be operated.
As a result, no interim protection measures are required for the service water valve pits.5.1.6 Flood Warning Times and Durations Time series plots of flood water elevations during the critical flooding scenarios are provided in Section3.1 (Figures 3.1-2 and 3.1-3) for LIP. These figures provide timing and duration of the flooding.
Warning time will be on the order of hours based on standard information from the National WeatherService for a LIP event. The National Weather Service, Hydrometeorological Prediction Center,produces various guidance forecast products to assist weather and river forecast centers.
Quantitative precipitation forecasts (QPFs) are particularly useful in determining when an LIP event might occur.The QPF provides rainfall over the continental U.S. for up to seven days at various intervals.
Theseforecasts depict isohyets in varying increments of accumulated precipitation expected in each interval.
(NOAA 2013) The longer term QPF provides an awareness level as to the potential for a minimum LIPevent. Similarly, an alert level requiring standby action could be taken using a shorter period QPF.Again, if the total precipitation estimated in three days is a certain percentage (to be determined) of theminimum LIP operating procedures will be taken.Current plant operating procedures begin preparations for flooding protections 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to apredicted hurricane impact or of a high tide warning with tides expected to exceed 4.5'(Unit
- 2) or 7'(Unit 3). For LIP type events, the procedures enter into the flood preparations for forecasted 24 hourrainfall that would exceed 5", which is significantly less than the postulated LIP event. With the use ofpre-filled
- sandbags, the staging of the sandbags on pallets in the vicinity of vulnerable areas, and TigerDams staged in a trailer, sufficient time will be available to implement the interim measures prior to thearrival of floodwaters.
Surge duration, a duration for flood waters to be above the CLB elevation of 15feet (NVGD29) is expected to be approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> (AREVA 2013, Figure 6).5.2 Reference AREVA, 2013. "Combined Events Flood Analysis
-Riverine",
AREVA Document No. 32-9196323-000, 2013.NOAA 2013. National Oceanic and Atmospheric Administration, National Weather Service,Hydrometeorological Prediction Center. Website:
Page 5-5 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 36.0 ADDITIONAL ACTIONSCurrently, mitigation measures are in place at IPEC to provide protection against a river flood level up.17'-11",
which is 2'-11" above the current design basis (CLB). As described in Section 5 of this report,the protection measures primarily involve placement of sandbags and or Tiger Dams to hold backfloodwaters from adversely affecting critical equipment.
This includes placement of sandbags aroundcertain manholes that contain conduits which communicate with the switchgear rooms at both units. Ifthese manholes become inundated with floodwaters, these conduits could provide a leak path into the480V switchgear rooms of both units.To enhance the current protection measures and provide additional protection against normal seepagethrough sandbag walls and the potential of some groundwater intrusion into the manholes, conduits thatcommunicate with the 480V switchgear rooms through manholes 23 & 33 will be sealed. Theseconduits will be sealed in the manholes with sealant tested and shown to be capable of resisting hydrostatic head pressures that can result from the beyond design basis flood levels discussed in thisreport. These seals will be installed in accordance to Entergy procedures governing the modification process.Manholes 24 & 34, which are located in the transformer yards and have conduits that communicate with the 480V switchgear rooms, are not subject to the storm surge event, but are subject to pondingcaused by the LIP. To prevent water due to the potential ponding from entering these manholes, thesemanholes will be raised approximately 18". All modifications to these manholes will be performed inaccordance to Entergy procedures governing the modification process.Page 6-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3APPENDIX A: ADDITIONAL SIMULATION MODEL USE DESCRIPTIONS A.1 Additional Computer Software Used for Flood Simulations All software codes used for IPEC flood analyses are those recommended in NUREG/CR-7046, withone exception:
FLO-2D. That program is described below.A.1.1 FLO-2D for LIP Simulations The example LIP calculation presented in Appendix B of NUREG/CR-7046 (NRC, 2011) used HEC-HMS and HEC-RAS, developed by Hydrologic Engineering Center of US Army Corps of Engineers.
The hydrologic part of the calculation was performed within HEC-HMS, whereas the hydraulic part ofthe calculation was performed within HEC-RAS.
In this flood re-evaluation study, FLO-2D was selectedfor calculation of the LIP-induced PMF at IPEC. For the LIP calculation, rainfall runoff was calculated internally by FLO-2D and translated into overland flow within FLO-2D.Appendix A was prepared as per Section 5.3 of NUREG/CR-7046 (NRC, 2011) to describe FLO-2D.A.1.2 Software Capability The FLO-2D computer program was developed by FLO-2D Software, Inc., Nutrioso, Arizona.
FLO-2Dis a combined two-dimensional hydrologic and hydraulic model that is designed to simulate riveroverbank flows as well as unconfined flows over complex topography and variable roughness, splitchannel flows, mud/debris flows and urban flooding.
FLO-2D is a physical process model that routes rainfall-runoff and flood hydrographs over unconfined flow surfaces using the dynamic wave approximation to the momentum equation.
The model hascomponents to simulate riverine flow including flow through culverts, street flow, buildings andobstructions, levees, sediment transport, spatially variable rainfall and infiltration and floodways.
Application of the model requires knowledge of the site, the watershed (and coastal, as appropriate)
- setting, goals of the study, and engineering judgment.
This software will be used to simulate the LIP,propagation of storm surge, seiches, and riverine flow through overland flow and channels to establish stillwater levels at various Flood Hazard Re-evaluation Project sites.The major design inputs to the FLO-2D computer model are digital terrain model of the land surface,inflow hydrograph and/or rainfall data, Manning's roughness coefficient and Soil hydrologic properties such as the SCS curve number. The digital terrain model of the land surface is used in creating theelevation grid system over which flow is routed. The specific design inputs depend on the modelingpurpose and the level of detail desired.The following executable modules compose the FLO-2D computer program:*.exe File SizeFLO.exe 10.76 MBGDS.exe 6.00 MBPage A-1 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3*.exe File SizePROFILES.exe 2.84 MBHYDROG.exe 2.07 MBMapper_2009.exe 3.33 MBMAXPLOT.exe 2.32 MBFLO.exe is the model code that performs the numerical algorithms for the aforementioned components of the overall FLO-2D computer model.GDS.exe graphically creates and edits the FLO-2D grid system and attributes and creates the basicFLO-2D data files for rainfall
-runoff and overland flow flood simulation.
PROFILES.exe displays thechannel slope and permits interactive adjustment of the channel properties.
HYDROG.exe enablesviewing of channel outputs hydrographs and lists average channel hydraulic data for various reaches ofriver. Mapper 2009.exe and Maxplot.exe enables graphical viewing of model results and inundation mapping.A description of the major capabilities of FLO-2D which will be used for this project is provided inSection A.1.3 below.A.1.3 Model Components Overland Flow Simulation This FLO-2D component simulates overland flow and computes flow depth, velocities, impact forces,static pressure and specific energy for each grid. Predicted flow depth and velocity between gridelements represent average hydraulic flow conditions computed for a small time step. For unconfined overland flow, FLO-2D applies the equations of motion to compute the average flow velocity across agrid element (cell) boundary.
Each cell is defined by 8 sides representing the eight potential flowdirections (the four compass directions and the four diagonal directions).
The discharge sharingbetween cells is based on sides or boundaries in the eight directions one direction at a time. Atruntime, the model sets up an array of side connections that are only accessed once during a time stepinstead of the dual algorithm required by searching for available elements.
The surface storage area orflow path can be modified for obstructions including buildings and levees. Rainfall and infiltration lossescan add or subtract from the flow volume on the floodplain surface.Channel Flow Simulation This component simulates channel flow in one-dimension.
The channel is represented by natural,rectangular or trapezoidal cross sections.
Discharge between channel grid elements are defined byaverage flow hydraulics of velocity and depth. Flow transition between subcritical and supercritical flowis based on the average conditions between two channel elements.
River channel flow is routed withthe dynamic wave approximation to the momentum equation.
Channel connections can be simulated by assigning channel confluence elements.
Flood Channel Interface This FLO-2D component exchanges channel flow with the floodplain grid elements in a separateroutine after the channel, street and floodplain flow subroutines have been completed.
An overbankdischarge is computed when the channel conveyance capacity is exceeded.
The channel-floodplain Page A-2 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3flow exchange is limited by the available exchange volume in the channel or by the available storagevolume on the floodplain.
Flow exchange between streets and floodplain are also computed during thissubroutine.
The diffusive wave equation is used to compute the velocity of either the outflow from thechannel or the return flow to the channel.Floodplain Surface Storage Area Modification and Flow Obstruction This FLO-2D component enhances detail by enabling the simulation of flow problems associated withflow obstructions or loss of flood storage.
This is achieved by the application of coefficients (Areareduction factors (ARFs) and width reduction factors (WRFs) that modify the individual grid elementsurface area storage and flow width. ARFs can be used to reduce the flood volume storage on gridelements due to buildings or topography and WRFs can be assigned to any of the eight flow directions in a grid element to partially or completely obstruct flow paths in all eight directions simulating floodwalls, buildings or berms.Rainfall
-Runoff Simulation Rainfall can be simulated in FLO-2D. The storm rainfall is discretized as a cumulative percent of thetotal. This discretization of the storm hyetograph is established through local rainfall data or throughregional drainage criteria that defines storm duration, intensity and distribution.
Rain is added in themodel using an S-curve to define the percent depth over time. The rainfall is uniformly distributed overthe grid system and once a certain depth requirement (0.01-0.05 feet) is met, the model begins to routeflow.Hydraulic Structures Hydraulic structures including bridges and culverts and storm drains may be simulated in FLO-2D Pro.Discharge through round and rectangular culverts with potential for inlet and outlet control can becomputed using equations based on experimental and theoretical results from the U.S. Department ofTransportation procedures (Hydraulic Design of Highway Culverts; Publication Number FHWA-NHI 020 revised May, 2005).LeveesThis FLO-2D component confines flow on the floodplain surface by blocking one of the eight flowdirections.
A levee crest elevation can be assigned for each of the eight flow directions in a given gridelement.
The model predicts levee overtopping.
When the flow depth exceeds the levee height, thedischarge over the levee is computed using the broad-crested weir flow equation with a 2.85 coefficient.
Weir flow occurs until the tailwater depth is 85% if the headwater depth. At higher flows, the water isexchanged across the levees using the difference in water surface elevations.
A.1.4 FLO-2D Model TheoryGoverning equations and solution algorithm are presented in details in FLO-2D Reference Manual(FLO2D, 2009a). The general constitutive fluid equations include the continuity equation and theequation of motion (dynamic wave momentum equation)
(FLO-2D, 2009a, Chapter II):Page A-3 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3ah ahvat aah V aV I aVSf = axaoa&~ g a twhereh = flow depth;V = depth averaged velocity in one of the eight flow directions; x = one of the eight flow directions; i = rainfall intensity; Sf = friction slope based on Manning's equation; So = bed slopeg = acceleration of gravityThe partial differential equations are solved with a central finite difference numerical scheme, whichimplies that final results are just approximate solutions to the differential equations.
Details on theaccuracy of FLO-2D solutions are discussed in FLO-2D Validation Report (FLO-2D, 2011).A.1.5 Model Inputs and OutputsInputs to FLO-2D are entered through a graphical user interface (GUI), which creates ASCII text filesused by the FLO-2D model (FLO-2D, 2009b). The ASCII text files can be viewed and edited by otherASCII text editors such as MicroSoft WordPad.Calculated results from FLO-2D simulations are saved in the ASCII text format in a number of individual files. The results can be viewed with the post-processor programs as follows:* Mapper -to view grid element results such as elevation, water surface elevation, flow depth andvelocity, to create contour maps and to generate shapefiles that can later be used by GISmapping software such as ArcMap." MAXPLOT -to view grid element maximum flood elevation, flow depth, velocity, channel flowdepth/elevation/velocity, and levee minimum free board/overtopping.
" HYDROG -to generate hydrographs for channel elements.
- PROFILES
-to plot channel water surface and channel bed profiles.
A.1.6 Conclusions FLO-2D is a FEMA-approved software (FLO-2D, 2011). The model validation report prepared forFEMA and the FLO-2D software certification prepared for Flood Re-evaluation Projects (AREVA, 2012)have demonstrated its modeling capabilities and numerical accuracy.
It is therefore judged to be anappropriate modeling tool for the Grand Gulf flood re-evaluation study where 2-dimensional overlandflow is predominant.
Page A-4 AAR EVA Document No.: 51-9195289-002 Entergy Fleet Fukushima ProgramFlood Hazard Reevaluation Report for Indian Point Energy Center (IPEC) Units 2 and 3A.1.7 References AREVA, 2012. AREVA Document No. 38-9191747-000, Computer Software Certification
-FLO-2DPro, GZA GeoEnvironmental, Inc., October 2012.NRC, 2011. NUREG/CR-7046:
Design-Basis Flood Estimation for Site Characterization at NuclearPower Plants in the United States of America" U.S. Nuclear Regulatory Commission (U.S. NRC),Springfield, VA: National Technical Information
- Service, 2011.FLO-2D, 2009a. FLO-2D Reference Manual, FLO-2D Software, Inc.FLO-2D, 2009b. FLO-2D Data Input Manual, FLO-2D Software, Inc.FLO-2D, 2011. FLO-2D Model Validation for Version 2009 and up prepared for FEMA, FLO-2DSoftware, Inc., June 2011.Page A-5