UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
-1257 March 4, 2015 Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001
Dear Mr. Heacock:
On February 12, 2015, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1 through December 31, 20 14. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, the NRC plans on conducting one non-ROP baseline inspection which includes an Operating License Initial Exam. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404
-997-4609 with any questions you may have regarding this letter.
Sincerely,/RA/ Steven D. Rose
, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50
-280, 50-281 License Nos.: DPR
-32, DPR-37
Enclosure:
Surry Inspection/Activity Plan (03/01/2015
- 06/30/2016)
cc Distribution via ListServ
_________________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB3 SON SDR2 NAME B. Bishop S. Ninh S. Rose DATE 02/27/2015 02/24/2015 03/02/2015 E-MAIL COPY?
YES NO YES NO YES NO Letter to David from Steven D. Rose dated March 4, 2015.
SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2014001 AND 05000281/2014001 DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource
ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 1 03/04/2015 09:42:47Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteSurryInspection / Activity Plan 03/01/2015
-06/30/2016 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 61,2 IPFire Protection [Triennial]7111105T03/09/2015 03/13/2015 1,2 IPFire Protection [Triennial]7111105T03/23/2015 03/27/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/27/2015 05/01/2015 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P04/27/2015 05/01/2015 RP-RP PUBLIC RAD SAFETY BASELINE 21,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/18/2015 05/22/2015 1,2 IPRadiological Environmental Monitoring Program71124.0705/18/2015 05/22/2015 1,2 IPPerformance Indicator Verification7115105/18/2015 05/22/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 41,2 IPProblem Identification and Resolution71152B07/13/2015 07/17/2015 1,2 IPProblem Identification and Resolution71152B07/27/2015 07/31/2015OL EXAM-INITIAL LICENSE EXAM PREP 31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V2343708/24/2015 08/28/2015 MODS-PLANT MODIFICATIONS INSPECTION 31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/14/2015 09/18/2015 1,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T09/28/2015 10/02/2015OL EXAM-INITIAL LICENSE EXAM 31 SURRY/SEPTEMBER 2015 INITIAL EXAM AT POWER FACILITIES V2343709/21/2015 10/02/2015 ISI-UNIT 2 IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P10/19/2015 10/23/2015 RP-RP OCCUPATIONAL BASELINE 21,2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/2015 10/23/2015 1,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/19/2015 10/23/2015 1,2 IPPerformance Indicator Verification7115110/19/2015 10/23/2015 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 12 IPInservice Inspection Activities - PWR7111108P10/26/2015 10/30/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.