IR 05000416/2015403
| ML15126A586 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/05/2015 |
| From: | Haire M S Division of Reactor Safety IV |
| To: | Kevin Mulligan Entergy Operations |
| References | |
| IR 2015403 | |
| Download: ML15126A586 (4) | |
Text
" " May 5, 2015
Mr. Kevin Mulligan
Site Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2015403
Dear Mr. Mulligan:
On April 16, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Grand Gulf Nuclear Station, Unit 1. An NRC inspector discussed the results of this inspection with Mr. V. Fallacara, General Manager Plant Operations, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspector did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronic ally for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room)
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security
vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
your response.
Sincerely,/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-416 License No. NPF-29
Nonpublic
Enclosure:
NRC Inspection Report 05000416/2015403
w/Attachment:
Supplemental Information cc w/enclosure:
Mr. James Dorsey
Manager, Security Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
cc w/o enclosure:
Electronic Distribution for Grand Gulf Nuclear Station
ML15126A586 Entire Report: SUNSI Review Complete By: J. Rollins Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
SUNSI Review Complete By: J. Rollins Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBC C:PSB1 NAME JRollins DHolman MHaire GWarnick MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/
DATE 4/22/15 4/22/15 4/23/15 4/23/15 5/5/15 Letter to Kevin Mulligan from Mark Haire, dated May 5, 2015
SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000416/2015403
Electronic distribution by RIV w/enclosure
- Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov
) Senior Resident Inspector (Mark.Schwieg@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov)
Electronic distribution by RIV w/o enclosure
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Mark.Schwieg@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov) Acting Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Ray.Azua@nrc.gov)
Project Engineer, DRP/C (Paul.Nizov@nrc.gov)
Project Engineer, DRP/C (Michael.Stafford@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSS (Don.Allen@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov) ROPreports