UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Thomas D. Gatlin Vice President, Nuclear Operations South Carolina Electric
& Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065 July 28, 2015
SUBJECT:
VIRGIL C. SUMMER N.UCLEAR
- STATION, UNIT 1 -ACCEPTANCE REVIEW (TAC NO. MF6503) De*ar Mr. Gatlin: By letter dated July 22, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15205A291) the South Carolina Electric
& Gas Company (SCE&G, the licensee) submitted a license amendment request to revise Technical Specification Section 6.0, "Administrative Controls" by changing the "Shift Supervisor" title to "Shift Manager."
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request.
The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 O CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.
Section 50.34 of 1 O CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate T. Gatlin acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-1009.
Docket No. 50-395 cc: Distribution via Listserv Sincerely, Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation T. Gatlin acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-1009.
Docket No. 50-395 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-1 R/F
- RidsAcrsAcnw_MailCTR Resource RidsNrrDorllpl2-1 Resource RidsNrrLASFigueroa Resource RidsNrrPMSummer Resource RidsRgn2MailCenter Resource ADAMS Accession No.: ML 15197 A037 OFFICE LPL2-1/LA NAME SWilliams SFigueroa DATE 07/28/15 07/28/15 Sincerely,
/RA/ Shawn Williams, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL2-1/BC LPL2-1/PM RPascarelli SWilliams 07/28/15 07/28/15 OFFICIAL RECORD COPY