ML17320A475

From kanterella
Revision as of 08:52, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Application for Amend to Licenses DPR-58 & DPR-74 Changing Tech Spec Figure 6.2.2 Re Facility Organization by Deleting Senior Operator License from Operations Superintendent Licensed Functions
ML17320A475
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/18/1983
From: HERING R F
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
Shared Package
ML17320A476 List:
References
AEP:NRC:0659A, AEP:NRC:659A, NUDOCS 8304260368
Download: ML17320A475 (6)


Text

REGULATRYINFORMATION DISTRIBUTIO SYSTEM(RIDS)ACCESSION NBR:8300260 6DOC~DATE+83/00/18NORIZED;YESDOCKET'gFACIL:50315DonaldC,CookNuclearPowerPlant~Uni~t1~IndianaL0500031550316DonaldO,CookNuclearPowerPlantiUnit2iIndiana805000316AUTHINANEAUTHORAFFILIATION HERINGiR,F<

Indiana8MichiganElectricCo~RECIP~NAMERECIPIENT AFFILIATION DENTONiH~R

~OfficeofNucl'earReactorRegulationgDirector

SUBJECT:

Application foramendtoLicesnesDPR~58,&DPR74changingTechSpecFigure6,2'refacilityorganiration by,deletingsenior'perator licensefromoperations superintenden't licesned.functions, DISTRIBUTION CODE:A001S'COPIESRECEIYED+LTR

'NCLgSIZE!"++TITlE:ORSubmittal:

GeneralDistributionN0TEs:~/cled.+4/,too@RECIPIENT IDCODE/NAME NRRORB1BC01COPIESCTTRENCL77RECIPIENT IDCODE/NAME COPIESLT~TRENCLINTERNAL:

ELD/HDS3NRR/DLDIRNRA/METBEXTERNAL+

ACRSNRCPDRNTlSOQ09021011111611NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/RAB RGN3LPDRNSIC0305111011TOTAlNUMBEROFCOPIESREQUIRED:

LTTR26ENCL20

,(Ihwjh4IIIlIIiii,ittt(iIIVIhwNgr()hrI>>If'ii'if4lih>>(IlII0httw(t)hiitI4IIgl,k'0,~ttii~4t,IHeeHoJlHt(yllI'I)Ih'1Ih'"Iitr>i(rfA(hi'iiIlhIiw(IilI'hlrPealillIt'IwilwLil44,4hhWIIilIKit"I444114IWH INDIANALMICHIGANELECTRICCOMPANYP.O.BOX18BOWLINGGREENSTATIONNEWYORK,N.Y.10004April18,1983AEP:NRC:0659ADonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74TECHNICAL SPECIFICATION CHANGEREQUESTFACILITYSTAFFREQUIREMENTS Mr.Harold,R.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555

DearMr.Denton:

ThisletteramendsoneoftheTechnical Specification (T/S)changerequestscontained inourletterNo.AEP:NRC:0659, datedMarch29,1982.Morespecifically, ChangeNo.3ofthatletterrequested thatanewspecification (T/S6.3.2)beissuedtoaccommodate thesituation ofthethennewCookPlantOperations Superintendent.

Thepreviously proposedT/S6.3.2wouldhavealloweda"fulltimeassistant" holdingaSROlicensetoperformtheOperations Superintendent's "licensed functions."

Inthisletterwearerequesting, first,achangetoT/SFigure6.2.2(Facility Organization) bydeletingtheSOL(SeniorOperatorLicense)intheOperations Superintendent's identification box.Secondly, wearerequesting achangetoT/S6.3.1toincludethestatement.

"and(3)theOperations Superintendent whoshallnotberequiredtoholdaFacilitySeniorReactorOperator's License."

TheAttachment tothislettercontainstherevisedT/Spages.J)hQ/ItshouldbenotedthattheattachedamendedpagesreflectthechangesPbeingproposedinthisletter,aswellasthosechangespreviously r4'roposed inourletterNo.AEP:NRC:0659.'ll changesareindicated byverticalbarsontherighthandmarginofthepageos/I,00.0oPresently, ourOperations Superintendent, whohaspreviously heldaSOLatanotherfacility, doesnothavehisSOLforourPlant.Heisscheduled toacquirehisSOLforourPlantpriortoOctober1,1983.However,uponreviewofthecurrentT/Srequirement wefeelthat.8304380368 830418IIIPDRADOCK050003is,IP...,.PDR 4\IIPl1I C~~Mr.HaroldR.onARC:0659Atherequirement isundulyrestrictive andinconflictwithnormalmanagerial prerogatives whichareusedtoassurethequalityofoursupervisory personnel.

Thisargumenthasbeenrecentlysupported byanOakRidgestudy(asdescribed intheOctober18,1982,issueofINSIDENRC)whichsurveyedthenuclearindustry(including NRCpersonnel) onthesubjectofmanagerial licensing.

Thisstudydepictedastrongopposition totheenforcement ofmanagerial licensing, andsupported insteadtohavetheNRCencourage theindustrytoassuremanagerial qualitybyestablishing standards ontherecruitment,

training, andassessment ofmanagers.

Furthermore, Revision3toNUREG-0452

("StandardTechnical Specifications forWestinghouse Pressurized WaterReactors"

)doesnotrequirethatthefacility's Operations Superintendent betheholderofaSOL.Webelieve,basedonalloftheabove,thattherequested T/Schangeswillnotdegradethequalityofmanagement attheCookPlantandwillnotendangerthehealthandsafetyofthepublic.Weinterpret theproposedT/Schangestoconstitute ClassIandClassIIAmendments.

Therefore, wehaveenclosedacheckforonethousandsixhundreddollars($1,600).TheseproposedchangeshavebeenreviewedbythePlantNuclearSafetyReviewCommittee (PNSRC)andwillbereviewedbytheNuclearSafetyandDesignReviewCommittee (NSDRC)atitsnextmeeting.Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.

Verytrulyyours,R,F,HeringVicePresident cc:JohnE.Dolan-ColumbusM.P.AlexichR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffNRCResidentInspector atCookPlant-Bridgman gnat~h1lt-h"e.t'Iall/hI~-hC~7'0~<FFh