ML18040A132
| ML18040A132 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 07/11/1994 |
| From: | MCCORMICK M NIAGARA MOHAWK POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17059A356 | List: |
| References | |
| NMP2L-1482, NUDOCS 9407150239 | |
| Download: ML18040A132 (10) | |
Text
k'H.j.MML'.
'Y(ACCELERATED BIDSPROCESSIREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9407150239 DOC.DATE:
94/07/11NOTARIZED:
NODOCKETFACIL:50-410 NineMilePointNuclearStation,Unit2NiagaraMoha05000410AUTH.NAMEAUTHORAFFILIATION MCCORMICK,M.
NiagaraMohawkPowerCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)
SUBJECT:
Forwards"NineMilePointUnit2EALsRevBasedonNUMARCNESP-007."
Upgradeprojectinvolvedlistedplants.DISTRIBUTION CODE:AO45DCOPIESRECEIUED:
LTR2ENCL/SIZE:&400TITLE:ORSubmittal:
Emergency Preparedness Plans,Implement'g Proceures,CNOTES:License Expdateinaccordance with10CFR2,2.109(12/22/72).
05000237LicenseExpdateinaccordance with10CFR2,2.109(9/19/72).
05000244RECIPIENT IDCODE/NAME PD1-1PDPD1-3PDBRINKMAN, D.STANG,JJOHNSON.,A INTERNAL:
AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL:
NRCPDRCOPIESLTTRENCL1111111111111111REPIENTCONAMEBRINKMAN,D MENNING,J CONICELLA,N.
NRI~RSSgPEPBREG~~LE)01NSICCOPIESLTTRENCL11111111111111gQu/@exNOTETOALL"RIDS'ECIPIENTS:
PLEASEHELPUSTOREDUCEXYASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMPl-37(EXI:504-2083)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDITOTALNUMBEROFCOPIESREQUIRED:
LTTR15ENCL15
tTNIAGARAUMOHAWKONEAS1LEPONTNUCLEARTRANNGCENTERIRD01,BOX1481OSWEGO
~NEWYORK13126/TELEPHONE (315)349-2080UnitedStatesNuclearRegulatory Commission DocumentControlDeskWashington, DC20555NineMilePointNudearPowerStationUnit2DocketNo,50-410LicenseNo.NPF-69July11,1994NMP2L1482
SUBJECT:
NineMilePointUnit2Emergency ActionLevelsRevisionBasedonNUMARCNESP-007Inaccordance withtheguidanceprovidedbytheNRCstaffatrecentNEImeetings, NiagaraMohawkissubmitting forreviewandapprovaltheenclosedEmergency ActionLevels(EALs)forNineMilePointNudearStationUnit2.NiagaraMohawk,inaccordance with10CFR50,54 (q),hasreviewedtheseEALsanddetermined thattheyrepresent anenhancement totheNineMlePointEmergency Plan,TheEALshavebeenrevisedconsistent withtheNUMARCNESP407methodology, andweredeveloped aspartofajointprojectwithallnudearutilities withinNewYorkState.Inordertoassistyourreviewwehaveincludedanumberofdevelopmental documents intheendosedEALGeneration Package.TheEALGeneration Packageconsistsofthefollowing:
~Plant-Specific EALGuideline
~EALTechnical Bases~FissionProductBarrierEvaluation
~Emergency ActionLevelMatrix~EALBinningDocument~Validation andVerification ReportAttachment 1providesanexplanation ofthecontentsoftheEALGeneration Package.TheseEALsweredeveloped asajointprojectwiththeNewYorkPowerAuthority, Consolidated Edison,Rochester GasandElectric, andNiagaraMohawk.Thisprocessensuresconsistent emergency classification betweenallNewYorkStatenuclearutilities tothegreatestextentpossible, limitedonlybyplantdesigndifferences.
Webelievethatacoordinated reviewofalltheNewYorkStatenuclearutilityEALrevisions willpromotethisconsistency andwillresultinthemostadvantageous useoftimeandresources.
PleasecontactMs.ColeenWare,DirectorofEmergency Preparedness, at349-2066shouldyouhaveanyquestions orrequireadditional information regarding thismatter.Verytrulyyours,cMJM/JDJ/bh M.McCormick, Jr.VicePresident-Nudear SafetyAssessment andSupportCC:Mr.B.S.Norris,SeniorResidentInspector Mr.M.L.Boyle,ActingDirector, ProjectDirectorate I-1,NRRMr.D.S.Brinkman, Sr.ProjectManager,NRRMr.T.T.Martin,RegionalAdministrator, Region194072502399407>>1PDRADOCK05000410PP'DPpgyg(()
ATTACHMENT 1NINEMILEPOINTNUCLEARSTATIONUNIT2EALGENERATION PACKAGECONTENTSUMMARYINTRODUCTION Priortotheacceptance bytheNRCofNUMARC/NESP-007 "Methodology forDevelopment ofEmergency ActionLevels"asanacceptable alternative totheNUREG0654EALguidance, thefournuclearutilities intheStateofNewYorkdecidedtoperformajointimplementation ofthenewmethodology.
Thisupgradeprojectinvolvedthefollowing plants:NineMilePointUnit1(NMP1)-NiagaraMohawkPowerCorporation NineMilePointUnit2(NMP2)-NiagaraMohawkPowerCorporation JamesA.FitzPatrick NuclearPowerPlant-NewYorkPowerAuthority IndianPointStation2-Consolidated EdisonIndianPoint3NuclearPowerStation-NewYorkPowerAuthority R.E.GinnaNuclearPowerStation-Rochester GasandElectricWhiletheresulting upgradedEALsaresitespecific, anobjective oftheupgradeprojectwastoensureconformity andconsistency betweenthesitestotheextentpossible.
Thefollowing paragraphs describethesitespecificEALdevelopmental documents whichareincludedintheEALreviewpackage.~~1ThePEGistheNMP2Interpretation oftheNUMARCmethodology fordeveloping EALs.ThePEGidentifies deletions fromtheNUMARCmethodology bystrikingoutwordsandphrasesthatarenotapplicable, additions areidentified byunderlining newwordsandphrases.Thedocuments whichprovidethebasisforthesechangesfromNUMARCmethodology arelistedinthereferences sectionofthePEG.inPB'rvliTheFPBEcontainstheevaluation oftheNUMARCexampleEALsforeachofthethreefissionproductbarriers.
Theresultofthisevaluation isadiscretesetofquantifiable EALswhichrepresent theNUMARCfissionproductbarrierlossmatrices.
,~
BasedonthenumberoexampleEALs,andthenumberoossandpotential lossconditions, thesetofconditions thatcanyieldagivenemergency classification canbedetermined.
Anevaluation ofeachcondition orsetofconditions wasmadetodetermine ifitproperlydefinestheappropriate threshold forthedassification.
Ifacondition orsetofconditions wasappropriate, acommentreflecting thisconclusion wasrecordedinthisdocument, Ifacondition orsetofconditions isdetermined tobeinappropriate, itislinedoutandthereasonforthisconclusion issimilarly recorded.
P2ELBSincetheformatpresented inNUMARC/NESP-007 isinadequate forimplementation; theEALs.defined-by-the.PEG-and FPBE-must bebinnedintocategories andsubcategories whichsupporteaseofuse.Thebinningdocumentidentifies whereeachPEG/FPBEInitiating Conditions (IC)isaddressed withinthepresentation scheme,NMP2EALTechnical BasesDocumentTheEALTechnical BasesDocumentprovidesanexplanation andrationale foreachoftheemergency actionlevel(EALs)includedintheEALUpgradeProgram.Itisalsointendedtofacilitate thereviewprocessoftheNMP2EALsandprovidehistorical documentation forfuturereference.
Thisdocumentisalsointendedtobeusedbythoseindividuals responsible forimplementation oftheNMP2dassification procedure asatechnical reference andaidinEALinterpretation.
NMP2EmerenAionLevelMatrixTheEmergency ActionLevelMatrixistheuserlevelresultoftheEALdevelopment project.Thismatrixwillbeincorporated intheEmergency PlanImplementing Procedures andisuseddirectlybyoperations personnel toclassifyanevent.P2Vr'liiTheNMP2Verification andValidabon Reportdocuments theprocessconducted toverifyandtovalidatethesitespecificEALsandsupporting documentation, Thisdocumentalsoincludesthecommentsreceivedduringvalidation alongwithcommentresolutions.
Theverification processwasperformed toensuretheNMP2EALsandclassification procedures aretechnically correct.TheNMP2EALverification wasconducted priortotheEALvalidation exercises.
Thetechnical accuracyoftheupgradedEALswereverifiedthroughtabletopreviews.
,0 Thevalidation processsuresthattheNMP2EALsandcassification procedures areusableandcorrect,andensuresthatemergency responsepersonnel areabletoarriveatconsistent interpretations ofEALsundersimilarconditions.
TheEALswerevalidated throughobservation ofemergency responseorganization personnel responding tosimulated emergency events.ThegroupofEALsselectedforvalidation weresufficiently representative ofalltheEALs.
OSSI93-402A-10-NMP2 Docketf,'~-'ft~
Accession 8azuz>Date~OfLti'eguiatol IDo;l:.-tFiloeworaemerenccioneveraeroecNineMilePoint1&2NiagaraMohawkPowerCorporation NineMilePointUnit2Generation PackageOperations SupportServices, Inc.233WaterStreet2ndFloorPlymouth, MA02360 1t$rIggqf't'iiwI$4+l+PlII,'.~chIl'U~~~r