| | Site | Start date | Title | Description |
|---|
| 05000277/LER-2025-001, Invalid Actuation Due to Bus Failure | Peach Bottom | 8 October 2025 | Invalid Actuation Due to Bus Failure | |
| ML25273A236 | | 30 September 2025 | Draft Appendix a to LIC-112, Power Uprate Process Graded Approach for Determining Power Uprate Level of Review | |
| L-MT-25-031, Site Specific Emergency Action Level Technical Basis Documents Change | Monticello | 24 September 2025 | Site Specific Emergency Action Level Technical Basis Documents Change | |
| ML25248A231 | Nine Mile Point Ginna | 11 September 2025 | Constellation Pre-Submittal Slides for Nine Mile Point, Unit 1 SLRA | |
| JAFP-25-0046, License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | FitzPatrick | 5 September 2025 | License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | |
| ML25224A024 | Hatch | 5 September 2025 | Edwin I Hatch Units 1 and 2 - Issuance of Amendment Nos. 329 and 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation | |
| IR 05000321/2025002 | Hatch | 14 August 2025 | Integrated Inspection Report 05000321/2025002 and 05000366/2025002 | |
| IR 05000458/2025002 | River Bend | 12 August 2025 | Integrated Inspection Report and Independent Spent Fuel Storage Installation Report 05000458/2025002 and 07200049/2025001 | |
| IR 05000341/2025002 | Fermi | 11 August 2025 | Integrated Inspection Report 05000341/2025002 | |
| IR 05000440/2025002 | Perry | 7 August 2025 | Integrated Inspection Report 05000440/2025002 | |