IR 05000272/2016006

From kanterella
Revision as of 09:33, 10 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Salem Nuclear Generating Station (Salem), Units 1 and 2 (Reports 05000272/2016006 and 05000311/2016006)
ML17058A401
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/01/2017
From: Scott M L
Division Reactor Projects I
To: Sena P
Public Service Enterprise Group
References
IR 2016006
Download: ML17058A401 (5)


Text

March 1, 2017

Mr. Peter Sena President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT: ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION (SALEM), UNIT NOS. 1 AND 2 (REPORTS 05000272/2016006 AND 05000311/2016006)

Dear Mr. Sena:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Salem Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRC's Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program," because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Salem Unit 1. The NRC determined the performance of Salem Unit 2 during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRC's ROP Action Matrix. This conclusion was based on all inspection findings having very low safety significance (i.e., Green) and a single White PI for "Unplanned Scrams per 7,000 Hours Critical." Specifically, Salem Unit 2 crossed the Green-White threshold in the second quarter of 2016 due to four unplanned scrams that occurred on August 5, 2015, February 2 and 14, 2016, and June 28, 2016. This PI remains White because the supplemental inspection in accordance with Inspection Procedure (IP) 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs," has not been completed and an additional unplanned scram occurred on August 31, 2016. As previously noted in the 2016 mid-cycle letter (Reports 05000272/2016005 and 05000311/2016005; ML16242A0991), the NRC plans to conduct this supplemental inspection after you notify the NRC of your readiness for it. 1 The designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Temporary Instruction 2515/192, "Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems." The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Fred Bower at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,/RA/

Michael L. Scott, Director Division of Reactor Projects Docket Nos.: 50-272 and 50-311 License Nos.: DPR 70 and DPR 75

Enclosure:

Salem Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML17058A401 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME RBarkley FBower MScott DATE 2/22/17 2/27/17 2/27/17 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSalemInspection / Activity Plan01/01/2017-12/31/2018Page 1 of 202/02/2017 15:51:3771124-RAD PROTECTION11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0101/09/201701/13/20171,2 IPOccupational ALARA Planning and Controls71124.0201/09/201701/13/20171,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0301/09/201701/13/20171,2 IPRadiation Monitoring Instrumentation71124.0501/09/201701/13/2017EP-EP PROGRAM INSPECTION11,2 IPAlert and Notification System Testing711140206/05/201706/09/20171,2 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/05/201706/09/20171,2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/05/201706/09/20171,2 IPPerformance Indicator Verification7115106/05/201706/09/20177111108P-U2 INSERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P04/24/201705/05/201771124-RAD PROTECTION1 2 IPRadiological Hazard Assessment and Exposure Controls71124.0105/01/201705/05/2017 2 IPOccupational ALARA Planning and Controls71124.0205/01/201705/05/20177111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)61,2 IPComponent Design Bases Inspection (Teams)7111121M06/26/201706/30/20171,2 IPComponent Design Bases Inspection (Teams)7111121M07/10/201707/14/20177111111B-SALEM REQUAL INSP WITH P/F RESULTS21,2 IPLicensed Operator Requalification Program - Annual Review7111111A09/12/201709/16/20171,2 IPLicensed Operator Requalification Program7111111B09/12/201709/16/201771152B-PI&R BIENNIAL51,2 IPProblem Identification and Resolution71152B08/14/201708/18/20171,2 IPProblem Identification and Resolution71152B08/28/201709/01/20171/22EXM-SALEM INITIAL EXAM41 FY18-SALEM INITIAL OPERATOAR LICENSING EXAMU0194912/11/201712/15/20181 FY18-SALEM INITIAL OPERATOAR LICENSING EXAMU0194901/22/201802/02/201871124.06-RETS11,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/28/201709/01/201771124-RAD PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0110/23/201710/27/20171 IPOccupational ALARA Planning and Controls71124.0210/23/201710/27/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSalemInspection / Activity Plan01/01/2017-12/31/2018Page 2 of 202/02/2017 15:51:377111108P-U1 INSERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P10/23/201711/03/201771124.08-RADWASTE11,2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/04/201712/08/20171,2 IPOccupational Exposure Control Effectiveness71151-OR0112/04/201712/08/20171,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0112/04/201712/08/20177111105T-TRIENNIAL FIRE PROTECTION41,2 IPFire Protection [Triennial]7111105T02/12/201802/16/20181,2 IPFire Protection [Triennial]7111105T02/26/201803/02/201871124-BASELINE HP11,2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/26/201803/02/20181,2 IPOccupational ALARA Planning and Controls71124.0202/26/201803/02/20181,2 IPOccupational Dose Assessment71124.0402/26/201803/02/2018EP-EP EXERCISE INSPECTION41,2 IPExercise Evaluation711140105/21/201805/25/20187111117T-50.59 PROCESS31,2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T04/30/201805/04/201871124-BASELINE HP11,2 IPOccupational ALARA Planning and Controls71124.0205/21/201805/25/20181,2 IPOccupational ALARA Planning and Controls71124.0205/21/201805/25/20181,2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/21/201805/25/201871124.07-REMP11,2 IPRadiological Environmental Monitoring Program71124.0706/25/201806/29/201871124.06-RETS & PI VERIFICATION11,2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0609/10/201809/14/20181,2 IPOccupational Exposure Control Effectiveness71151-OR0109/10/201809/14/20181,2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0109/10/201809/14/2018U2 ISI-UNIT 2 INSERVICE INSPECTION2 2 IPInservice Inspection Activities - PWR7111108P10/22/201811/02/201871124-BASELINE HP11 IPRadiological Hazard Assessment and Exposure Controls71124.0110/29/201811/02/20181 IPOccupational ALARA Planning and Controls71124.0210/29/201811/02/20181,2 IPOccupational Dose Assessment71124.0410/29/201811/02/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.