IR 05000400/2017403

From kanterella
Revision as of 07:32, 10 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Shearon Harris Nuclear Power Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000400/2017403 - OUO Removed
ML17151A223
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/25/2017
From: Shaeffer S M
NRC/RGN-II/DRS/EB2
To: Hamilton T
Duke Energy Progress
References
IR 2017403
Download: ML17151A223 (4)


Text

SECUITY-RELATED INFORMATION May 25, 2017 Ms. Tanya Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.

M/C HNP01 New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2017403

Dear Ms. Hamilton:

On April 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Shearon Harris Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report (IR).

The NRC inspectors did not identify and findings or violations of more than minor significance.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for withholding."

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390," in accordance with10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/ Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63

Enclosure:

Inspection Report No. 05000400/2017403 w/

Attachment:

Supplementary Information (Official Use Only - Security Related Information) cc: (See page 3) cc: Edward T. O'Neil, Director, General Manager Nuclear Protective Services Duke Energy - EC5ZD 526 South Church Street Charlotte, NC 28202

Linwood Faulk, Director Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562

__ _____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE MJS6 JJP3 SMS SDR2 SMS NAME SINGLETARY PATEL SHAEFFER ROSE SHAEFFER DATE 5/22/2017 5/23/2017 5/25/2017 5/25/2017 5/25/2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO