Letter Sequence RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: ML17156A098, ML17346A732, ML17347A383, ML17348B142, ML18078A747, ML18107A504, ML18120A135, ML18124A190, ML18127A034, ML18129A356, ML18143B396, ML18151A082, ML18155A550, RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 3
|
MONTHYEARML17156A0982017-06-19019 June 2017 Receipt and Availability FRN - License Renewal Application for River Bend, Unit 1 Project stage: Other RBG-47773, Supplement to License Renewal Application2017-08-0101 August 2017 Supplement to License Renewal Application Project stage: Supplement ML17320B0992017-11-16016 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17335A0982017-11-29029 November 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application Project stage: RAI ML17347B4322017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 5 Project stage: RAI ML17347B4242017-12-13013 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 4 Project stage: RAI ML17361A3962017-12-27027 December 2017 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 6 Project stage: RAI ML17348B1422018-01-0808 January 2018 RBS Scoping and Screening Audit Report Project stage: Other ML17347A3832018-01-0808 January 2018 RBS Ope Audit Report Project stage: Other ML18009A9092018-01-0909 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 7 Project stage: RAI RBG-47807, Response to License Renewal Application NRC Requests for Additional Information Set 32018-01-10010 January 2018 Response to License Renewal Application NRC Requests for Additional Information Set 3 Project stage: Other ML18022A9412018-01-22022 January 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 8 Project stage: RAI RBG-47813, Response to License Renewal Application (LRA) NRC Request for Additional Information Set 52018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information Set 5 Project stage: Request RBG-47812, Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 42018-01-24024 January 2018 Response to License Renewal Application (LRA) NRC Request for Additional Information (RAI) Set 4 Project stage: Request ML17346A7322018-01-29029 January 2018 Aging Management Programs Audit Report Regarding River Bend Station, Unit 1 License Renewal Application Review Project stage: Other RBG-47818, Response to License Renewal Application NRC Request for Additional Information - Set 72018-02-0707 February 2018 Response to License Renewal Application NRC Request for Additional Information - Set 7 Project stage: Request ML18043A0082018-02-0808 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 10 Project stage: RAI ML18043A3512018-02-12012 February 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18051A0922018-02-20020 February 2018 Single Positive Test Form Collected on 01/09/2017 Project stage: Request RBG-47828, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 82018-02-20020 February 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 8 Project stage: Request RBG-47840, Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days2018-02-22022 February 2018 Request for Due Date Extension for License Renewal Application NRC Request for Additional Information from 30 Days to 45 Days Project stage: Request ML18065A2132018-03-0606 March 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 12 Project stage: RAI ML18078A7472018-03-0606 March 2018 Highland Mining Company, NRC Form 591 Part 1, Inspection Report 03036608/2018001 Project stage: Other ML18057A4532018-03-0707 March 2018 Summary of Telephone Conference Call Held on February 20, 2018 Between the U.S. Nuclear Regulatory Commission and Energy Regarding RAI Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18059A8222018-03-0808 March 2018 Summary of Public Telephone Conference Call Held on February 27, 2018 Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station Unit 1 Project stage: RAI RBG-47834, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 92018-03-0808 March 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 9 Project stage: Request ML18068A1872018-03-0909 March 2018 NRR E-mail Capture - Revision of Final Request for Additional Information (RAI 2.3.3.17-2) for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 11 Project stage: RAI ML18073A0482018-03-19019 March 2018 License Renewal Application Review Response to Request for Due Date Extension for Request for Additional Information Set 10 Project stage: RAI RBG-47835, Submittal of Response to License Renewal Application NRC Request for Additional Information Set 102018-03-26026 March 2018 Submittal of Response to License Renewal Application NRC Request for Additional Information Set 10 Project stage: Request RBG-47849, Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement2018-03-27027 March 2018 Response to License Renewal Application NRC Request for Additional Information Set 4 Supplement Project stage: Supplement ML18078A7552018-03-28028 March 2018 Telephone Call Summary on Applicants Response to RAI B1.4-1 & B.1.4-2 (Set 5) on 030618 Rev 2 - All Edits Incorp Project stage: RAI ML18078A7482018-03-29029 March 2018 Uranium One Public Meeting Feb. 22, 2018 Project stage: Meeting ML18071A0182018-03-29029 March 2018 Telephone Call Summary RAI 3.2.2.3.2-1a Generic Filtration on 27FEB2018 v1_RBS Edits incorp._030618 Project stage: RAI RBG-47846, Response to License Renewal Application NRC Request for Additional Information (RAI) Set 122018-04-0303 April 2018 Response to License Renewal Application NRC Request for Additional Information (RAI) Set 12 Project stage: Request RBG-47850, Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement2018-04-0404 April 2018 Response to License Renewal Application NRC Request for Additional Information Set 5 Supplement Project stage: Supplement ML18089A0762018-04-12012 April 2018 Summary of Public Telephone Conference Call Held on Between the U.S. Nuclear Regulatory Commission and Entergy Regarding Requests for Additional Information Pertaining to the River Bend Station, Unit 1 License Renewal Application Review Project stage: RAI ML18107A5042018-04-24024 April 2018 Summary of Public Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Regarding the Need for Additional Information to Support the River Bend Station, Unit 1 License Renewal Application Review Project stage: Other ML18115A0612018-04-25025 April 2018 Draft Response on RAI B1.21-1 Flow Accelerated Corrosion Project stage: Request ML18115A1632018-04-25025 April 2018 Draft Response on RBS LRA RAI B.1.21-2 Flow Accelerated Corrosion Project stage: Request ML18115A0722018-04-25025 April 2018 Draft Response on RAI B.1.25-1(Internal Surfaces in Miscellaneous Piping and Ducting Components) Project stage: Request ML18121A0292018-04-30030 April 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 14 Project stage: RAI ML18121A2942018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-1a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18121A3022018-05-0101 May 2018 Draft Response to NRC Request for Additional Information (RAI) 4.6-2a Generated from Staffs Review on the River Bend License Renewal Application Project stage: Draft RAI ML18122A2312018-05-0202 May 2018 Draft Response to NRC Request for Additional Information (RAI) B.1.40-5 Service Water Integrity Generated from Staffs Review on the River Bend Station, Unit 1 License Renewal Application Project stage: Draft RAI ML18122A1262018-05-0202 May 2018 RAI B.1.17-1 Revised - w- header-footer-watermark Project stage: Request ML18124A0092018-05-0303 May 2018 NRR E-mail Capture - Final Requests for Additional Information for the Safety Review of the River Bend Station License Renewal Application (CAC No. MF9757) - Set 15 Project stage: RAI ML18120A1352018-05-10010 May 2018 Call Summary - Fuel Oil, Ext.-Int. Surf. Monitoring, FAC & Others 041018, Rev2 Project stage: Other ML18135A1072018-05-15015 May 2018 RBS Draft Response (RAI 4.3.1-2a_Class 1 Fatigue w-header-footer-watermark_received on 051318 Project stage: Request ML18136A7052018-05-16016 May 2018 RBS Draft Response to LRA Review RAI 4.7.3-1a Fluence Effects for Rv Internals Project stage: Request ML18136A8212018-05-16016 May 2018 Draft Response to RAI 3.6.2.2.2.2-1a High Voltage Insulators - RBS LRA Review Project stage: Request 2018-03-26
[Table View] |
Text
1NRR-DMPSPEm ResourceFrom:Wong, AlbertSent:Friday, March 09, 2018 10:10 AMTo:Mr. William F. MaguireCc:RidsNrrDmlr Resource; RidsNrrDmlrMrpb Resource; RidsNrrPMRiverBend Resource; RidsOgcMailCenter Resource; Wilson, George; Donoghue, Joseph; Sayoc, Emmanuel; Wong, Albert; Nold, David; Frumkin, Daniel; Iqbal, Naeem; Oesterle, Eric; Alley, David; Martinez Navedo, Tania; Bailey, Stewart; Wittick, Brian; Ruffin, Steve; Bloom, Steven; Dennig, Robert; Regner, Lisa; Turk, Sherwin; Sowa, Jeffrey; Parks, Brian; Pick, Greg; Kozal, Jason; Young, Cale; Young, Matt; Werner, Greg; McIntyre, David; Dricks, Victor; Moreno, Angel; Burnell, Scott; 'Broussard, Thomas Ray'; Lach, David J; SCHENK, TIMOTHY A; 'Coates, Alyson'
Subject:
REVISION OF FINAL REQUEST FOR ADDITIONAL INFORMATION (RAI 2.3.3.17-2) FOR THE SAFETY REVIEW OF THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757) - SET 11Attachments:ATTACHMENT 1 REVISED RAI 2.3.3.17-2 RG removed_CLEAN.pdfDocket No. 50-458
Dear Mr. Maguire:
By letter dated May 25, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No.
ML17153A282), Entergy Operations, Inc. (the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants," to renew the operating license NPF-47 for River Bend Station. On February 12, 2018, the U.S Nuclear Regulatory Commission (NRC) staff sent Entergy Operations, Inc. the final Requests for Additional Information (RAIs) (ADAMS Accession No. ML18043A351) related to multiple technical topics. In RAI 2.3.3.17-2 (Fuel Oil), the NRC staff inadvertently included a reference to Regulatory Guide (RG) 1.189 Fire Protection for Nuclear Power Plants. This RG should not have been included as it is not part of the licensing basis for Fire Protection at the River Bend Station. A revised RAI 2.3.3.17-2 is enclosed as Attachment 1 of this e-mail.
David Lach of your staff stated that the removal of this RG reference from RAI 2.3.3.17-2 had no material impact on the 30-day response time for Set 11 RAIs. The NRC staff will be placing a copy of this email in the NRC's Agencywide Documents Access and Management System. Sincerely,
Emmanuel Sayoc, Project Manager Albert Wong for License Renewal Projects Branch (MRPB) Division of Materials and License Renewal Office of Nuclear Reactor Regulation
Docket No. 50-458
Enclosure:
As stated 2OFFICE PM:MRPB:DMLR BC: MRPB:DMLR PM: MRPB:DMLR NAME ESayoc EOesterle ESayoc Albert Wong for DATE 03/07/2018 03/08/2018 03/08/2018 OFFICIAL RECORD COPY Hearing Identifier: NRR_DMPS Email Number: 230 Mail Envelope Properties (Albert.Wong@nrc.gov20180309100900)
Subject:
REVISION OF FINAL REQUEST FOR ADDITIONAL INFORMATION (RAI 2.3.3.17-2) FOR THE SAFETY REVIEW OF THE RIVER BEND STATION LICENSE RENEWAL APPLICATION (CAC NO. MF9757) - SET 11 Sent Date: 3/9/2018 10:09:41 AM Received Date: 3/9/2018 10:09:00 AM From: Wong, Albert Created By: Albert.Wong@nrc.gov Recipients: "RidsNrrDmlr Resource" <RidsNrrDmlr.Resource@nrc.gov> Tracking Status: None "RidsNrrDmlrMrpb Resource" <RidsNrrDmlrMrpb.Resource@nrc.gov> Tracking Status: None "RidsNrrPMRiverBend Resource" <RidsNrrPMRiverBend.Resource@nrc.gov> Tracking Status: None "RidsOgcMailCenter Resource" <RidsOgcMailCenter.Resource@nrc.gov>
Tracking Status: None "Wilson, George" <George.Wilson@nrc.gov> Tracking Status: None "Donoghue, Joseph" <Joseph.Donoghue@nrc.gov> Tracking Status: None "Sayoc, Emmanuel" <Emmanuel.Sayoc@nrc.gov>
Tracking Status: None "Wong, Albert" <Albert.Wong@nrc.gov> Tracking Status: None "Nold, David" <David.Nold@nrc.gov> Tracking Status: None "Frumkin, Daniel" <Daniel.Frumkin@nrc.gov> Tracking Status: None "Iqbal, Naeem" <Naeem.Iqbal@nrc.gov>
Tracking Status: None "Oesterle, Eric" <Eric.Oesterle@nrc.gov> Tracking Status: None "Alley, David" <David.Alley@nrc.gov> Tracking Status: None "Martinez Navedo, Tania" <Tania.MartinezNavedo@nrc.gov> Tracking Status: None "Bailey, Stewart" <Stewart.Bailey@nrc.gov> Tracking Status: None "Wittick, Brian" <Brian.Wittick@nrc.gov> Tracking Status: None "Ruffin, Steve" <Steve.Ruffin@nrc.gov>
Tracking Status: None "Bloom, Steven" <Steven.Bloom@nrc.gov> Tracking Status: None "Dennig, Robert" <Robert.Dennig@nrc.gov> Tracking Status: None "Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "Turk, Sherwin" <Sherwin.Turk@nrc.gov> Tracking Status: None "Sowa, Jeffrey" <Jeffrey.Sowa@nrc.gov>
Tracking Status: None "Parks, Brian" <Brian.Parks@nrc.gov> Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov> Tracking Status: None "Kozal, Jason" <Jason.Kozal@nrc.gov>
Tracking Status: None "Young, Cale" <Cale.Young@nrc.gov> Tracking Status: None "Young, Matt" <Matt.Young@nrc.gov> Tracking Status: None "Werner, Greg" <Greg.Werner@nrc.gov> Tracking Status: None "McIntyre, David" <David.McIntyre@nrc.gov> Tracking Status: None "Dricks, Victor" <Victor.Dricks@nrc.gov> Tracking Status: None "Moreno, Angel" <Angel.Moreno@nrc.gov> Tracking Status: None "Burnell, Scott" <Scott.Burnell@nrc.gov>
Tracking Status: None "'Broussard, Thomas Ray'" <tbrous1@entergy.com> Tracking Status: None "Lach, David J" <DLach@entergy.com> Tracking Status: None "SCHENK, TIMOTHY A" <TSCHENK@entergy.com>
Tracking Status: None "'Coates, Alyson'" <alacey@entergy.com> Tracking Status: None "Mr. William F. Maguire" <wmagui1@entergy.com> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 1718 3/9/2018 10:09:00 AM ATTACHMENT 1 REVISED RAI 2.3.3.17-2 RG removed_CLEAN.pdf 107856 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
REVISED RAI 2.3.3.17-2 (Fuel Oil) Background The staff performed its scoping and screening review of LRA Section 2.3.3.17 "Fuel Oil System." Many of the components of the Fuel Oil System (309/EGF) are typically within the scope of components that require an AMR because they provide an intended pressure-retaining boundary function for the system. After review of LRA Table 2.3.3-17, LRA drawing LRA-PID-08-09A AND LRA Section 2.3.3.17, the staff requests additional information about system Component Types that appear on LRA drawing LRA-PID-08-09A. Issue LRA Drawing LRA-PID-08-09A identifies the vent "Piping' and "Flame Arrester" associated with "Fuel Oil Waste Oil" Tanks (i.e., TK3A & TK3B) for EGS*EG1A (Tank Coordinate K-6) and EGS*EG1B (Tank Coordinate F-6) as components not subject to AMR. The remaining "Component Types" associated with these "Tanks" have been identified in LRA Table 2.3.3-18-2 "Fuel Transfer Equipment System, Nonsafety-Related Components Affecting Safety-Related Systems" as being subject to AMR. Flame arresters are passive mechanical devices installed on oil storage tanks vents that function: (1) to allow the passage of vapor under normal operating conditions, and (2) to stop and extinguish any flame from propagating through the flammable vapor/air mixture under emergency conditions. The staff notes that stopping the flame protects the storage tank, or the equipment located in the piping system, from the catastrophic damage that may result from an uncontrolled ignition. Given that these "Fuel Oil Waste Tanks" are located in the vicinity of Emergency Diesel Generators EGS*EG1A and EGS*EG1B, it appears that the vent "Piping' and "Flame Arrestor" associated with "Fuel Oil Waste Oil" Tanks (i.e. TK3A & TK3B) are non-safety components whose failure could result in failure of nearby safety-related equipment per 10 CFR 54.4(a)(2). Request Please identify where the LRA addresses the AMR for the vent "Piping' and "Flame Arrester" associated with "Fuel Oil Waste Oil" Tanks (i.e. TK3A & TK3B) or provide the staff with justification as to why these components are not subject to AMR.