Other: ML071900365, ML11090A078, ML11109A067, ML12199A025, ML13043A527, ML13067A315, ML13077A284, ML13134A367, ML13155A504, ML13270A248, ML14217A206, ML15007A430, ML15055A004, ML15055A014, ML15268A128, NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application, NL-10-054, Correction to License Renewal Application, NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A, NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A
|
MONTHYEARNL-07-056, Supplement to License Renewal Application2007-05-0303 May 2007 Supplement to License Renewal Application Project stage: Supplement ML0729601252007-06-21021 June 2007 E-mail from K. Mcmullin of Entergy to Various, Regarding IPEC Status Report for June 21 2007 Project stage: Request NL-07-078, Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application2007-06-21021 June 2007 Station Blackout (SBO) / Appendix R Diesel Generator Commitment, Response to NRC Review Status of License Renewal Application Project stage: Other ML0719003652007-07-25025 July 2007 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from ENO, Inc. for Renewal of the Operating License for the Indian Point Nuclear Generating Unit Project stage: Other ML0727804392007-10-16016 October 2007 Summary of Telephone Conference Call with Entergy Nuclear Operations, Inc., Requests for Additional Information Project stage: RAI NL-10-054, Correction to License Renewal Application2010-05-27027 May 2010 Correction to License Renewal Application Project stage: Other ML11090A0782011-04-19019 April 2011 Safety Project Manager Change for the License Renewal Project for Indian Point Nuclear Generating Unit Numbers 2 and 3 Project stage: Other ML11109A0672011-04-19019 April 2011 Lr Hearing - FW: OAR - Safety PM Change for the License Renewal Project for Indian Point...(Tac Nos. MD5407 & MD5408) Project stage: Other CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12048B4082012-02-17017 February 2012 State of New Yorks Answer to Entergys Motion in Limine to Exclude Portions of Pre-Filed Testimony and Exhibits for Contention NYS-37 (Entergy Alternatives) Project stage: Request NL-12-037, License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A2012-02-17017 February 2012 License Renewal Application - Revised Reactor Vessel Internals Program and Inspection Plan Compliant with MRP-227-A Project stage: Other CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications Project stage: Request ML12184A0372012-06-14014 June 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML12199A0252012-07-30030 July 2012 Project Manager Change for the License Renewal of Indian Point, Units 2 & 3 Project stage: Other ML12223A3882012-09-10010 September 2012 RAI for the Review of the Indian Pont Nuclear Generating Unit Nos. 2 and 3, LRA Set 2012-02 Project stage: RAI ML12223A3672012-09-12012 September 2012 Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning RAI Set 2012-02, Reactor Vessel Internals Program Pertaining to the Indian Point, Units 2 & 3, License Renewal Application Project stage: RAI ML12270A3842012-09-26026 September 2012 Lr Hearing - Meeting Summary Project stage: Request ML12278A0772012-10-16016 October 2012 Request for Additional Information for the Review of the Indian Point Nuclear Generating Units 2 and 3, License Renewal Application, Set 2012-03 Project stage: RAI NL-12-140, Reply to Request for Additional Information Regarding the License Renewal Application2012-10-17017 October 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI NL-12-166, Reply to Request for Additional Information Regarding the License Renewal Application2012-11-20020 November 2012 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications Project stage: Response to RAI ML13015A1752013-02-0606 February 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, LRA, Set 2013-01 Project stage: RAI ML15335A2722013-02-0606 February 2013 Official Exhibit - NRC000187-00-BD01 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and Project stage: RAI ML15334A2562013-02-0606 February 2013 Official Exhibit - ENT000660-00-BD01 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2013-01 (TAC Nos. MD5407 and Project stage: Request ML15223A2632013-02-0606 February 2013 NRC000187 - Letter from John Daily, NRC, to Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-01 (TAC Nos. MD5407 and MD5408) Feb. 6, Project stage: RAI ML15222A8962013-02-0606 February 2013 ENT000660 - Letter from J. Daly, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-01 (TAC Nos. MD54 Project stage: Request ML13043A5272013-02-26026 February 2013 PM Change Letter - February 2013 Project stage: Other ML13077A2842013-03-0808 March 2013 Correction PM Letter Indian Point Project stage: Other ML13067A3152013-03-0808 March 2013 Correction to Project Manager Change for the License Renewal of Indian Point, Units 2 and 3 (TAC Nos. MD5407 & MD5408) Project stage: Other ML13127A3762013-05-0707 May 2013 Errata to NRC Staff'S Proposed and Reply Findings of Fact and Conclusions of Law on Contention NYS-5 (Buried Piping and Tanks) Project stage: Request NL-13-052, Reply to Request for Additional Information Regarding the License Renewal Application2013-05-0707 May 2013 Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML13155A5042013-06-11011 June 2013 IP2-32-390 Request to Withhold-NL-12-166 Project stage: Other ML13162A6062013-06-12012 June 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-02 Project stage: RAI ML13186A1692013-07-17017 July 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013 03 Project stage: RAI ML13134A3672013-07-19019 July 2013 PM Change Letter Project stage: Other ML13205A0222013-07-24024 July 2013 Lr Hearing - Telecon Summary for 7-19-13 Call on Drais for Rvi Program and Inspection Plan Project stage: Request ML15222A8982013-07-26026 July 2013 ENT000661 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2013-04 (TAC Nos. MD5 Project stage: Request ML15334A2572013-07-26026 July 2013 Official Exhibit - ENT000661-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 Lr Application, Set 2013-04 (TAC Nos Project stage: Request ML13204A1992013-07-26026 July 2013 RAI for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2013-04 Project stage: RAI ML13240A0762013-09-0303 September 2013 RAI Set 2013-5 follow-up RAI on CP Project stage: RAI ML13270A2482013-09-27027 September 2013 Lr Hearing - IPEC License Renewal - Response to Set 2013-04 RAIs Project stage: Other ML13318A4502013-11-19019 November 2013 Request for Additional Information for the Review of the Indian Point Nuclear Generating, Units 2 and 3, License Renewal Application, Set 2013-06 Project stage: RAI NL-14-010, Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application2014-01-16016 January 2014 Units, 2 & 3 - Reply to Request for Additional Information Regarding the License Renewal Application Project stage: Response to RAI ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan Project stage: Request NL-14-013, Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A2014-01-28028 January 2014 Additional Information Regarding the License Renewal Application - Action Item 7 from MRP-227-A Project stage: Other ML15160A2002014-01-28028 January 2014 NYS000503 - Dacimo, Fred, Entergy, Letter to Document Control Desk, USNRC, Reply to Request for Additional Information Regarding the License Renewal Application, NL-14-013 (January 28, 2014) (ML14038A150) Project stage: Response to RAI ML14084A3872014-04-0101 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-01 Project stage: RAI ML15334A2582014-04-0909 April 2014 Official Exhibit - ENT000662-00-BD01 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the IP Nuclear Generating Unit Nos. 2 and 3 LRA, Set 2014-02 (TAC Nos. MD5407 and Project stage: Request ML15222A9012014-04-0909 April 2014 ENT000662 - Letter from K. Green, NRC, to Vice President, Operations, Entergy, Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application, Set 2014-02 (TAC Nos. MD5 Project stage: Request ML14094A1732014-04-0909 April 2014 Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2014-02 Project stage: RAI 2012-09-26
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 20, 2017
LICENSEE: Entergy Nuclear Operations, Inc. (Entergy) FACILITY: Indian Point Unit Nos. 2 and 3 (IP2 and IP3)
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON MAY 25, 2017 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT, LICENSE RENEWAL APPLICATION (TAC. NOS. MD5407 AND MD5408)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on May 25, 2017, to discuss and clarify the staff's need for additional information concerning the Indian Point, license renewal application.
provides a listing of the participants and Enclosure 2 summarizes the discussions during the call.
The applicant had an opportunity to comment on this summary. /RA/ William Burton, Senior Project Manager Project Management and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosures:
- 1. List of Participants
- 2. Call summary
cc w/encls: See next page
SUBJECT:
SUMMARY OF TELEPHONE CONFERENCE CALL HELD ON MAY 25, 2017 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE INDIAN POINT, LICENSE RENEWAL APPLICATION (TAC. NOS. MD5407 AND MD5408)
DISTRIBUTION:
HARD COPY:
E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpgb Resource RidsOgcMailCenter Resource RidsNrrPMIndianPoint Resource
SBloom SStuchell WBurton WHolston JGavula RGuzman STurk, OGC DRoth, OGC BHarris, OGC SBurnell, OPA DMcIntyre, OPA JWeil, OPA MGray, RI GDentel, RI DJackson, RI MModes, RI NSheehan, RI OPA DScrenci, RI OPA DTifft, RI NMcnamara, RI BHaagensen, RI GNewman, RI SRich, RI rlouie@entergy.com rburron@entergy.com avitale@entergy.com rwalpol@entergy.com ADAMS Accession No.ML17157B542 OFFICE LA:DLR* PM:RPGB:DLR BC:RPGB:DLR PM:RPGB:DLR NAME YEdmonds WBurton SStuchell WBurton DATE 6/19/2017 6/19/2017 6/19/2017 6/20/17 OFFICIAL RECORD COPY Enclosure 1 TELEPHONE CONFERENCE CALL INDIAN POINT UNIT NOS. 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MAY 25, 2017 PARTICIPANTS AFFILIATIONSSteve Bloom U.S. Nuclear Regulatory Commission (NRC)William "Butch" Burton NRCJim Gavula NRC Bill Holston NRC George Wilson NRCAlbert Wong NRCMichael Vasely Nuclear Operations Inc. (Entergy) Alan Cox EntergyCharles Caputo EntergyRichard Louie EntergyMahvash Mirzai EntergyTom Orlando EntergyDennis Pennino EntergyChris Scott EntergyDavid Wootten EntergyDavid Dronzek EntergyJustin Sledzinski Entergy
Enclosure 2 TELEPHONE CONFERENCE CALL FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION MAY 25, 2017 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on May 25, 2017, to discuss and clarify information concerning the license renewal application (LRA).
For the original request regarding the 2008 event, the applicant clarified that they considered the cause of the leakage to be bounded by other events included in their May 5, 2017, RAI response; however, they did not have the details from the event to say whether it was a problem with stainless steel or carbon steel piping, or whether it did not meet structural integrity, as specified in ASME Code Case N-513, or that it did not meet the applicable configuration of the code case. The staff clarified that the cited NRC inspection report refers to a section of service water piping that was below the minimum pipe wall thickness for structural integrity versus not being an applicable configuration specified in the code case. The staff requested the applicant to verify whether the issue from 2008 was for lack of structural integrity, or whether the leak did not meet an applicable configuration specified in the code case. If the issue was a lack of structural integrity, the staff asked that information comparable to that provided in the previous RAI response be provided for the 2008 event. The staff also asked the applicant to provide assurances, if there was a lack of piping structural integrity, that the causes of any other event where loss of structural integrity had previously occurred are bounded by those included in the previous RAI response and that changes made to the predictive monitoring process for the previous occurrences provide reasonable assurance that similar losses of structural integrity will not recur.
For the request regarding the previous RAI's response, which characterized the cause of some leaks as "improper material use in the service water piping," the applicant stated that there is other stainless steel material installed in the service water system and that "improper material use" referred to the use of socket-welded fittings and the inability to characterize indications for these types of fittings. The staff requested that the applicant provide information regarding how the Service Water Integrity program manages any associated aging effects for this material.
For the request regarding the recently implemented engineering report IP-RPT-16-00046, the applicant stated that the report specifically refers to Generic Letter 89-13, which is the basis for the Service Water Integrity program, and is being credited by the program. The staff requested that the RAI response include a statement in that regard. In lieu of issuing a second set of RAIs, Entergy will supplement their previous submittal (NL-17-052) to provide the additional clarifying information. Entergy will provide the supplement no later than 2 weeks following issuance of this telecom summary.