NPL-97-0143, Forwards Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2.Corrected MOR for Feb 1997 for Unit 1,also Encl
| ML20137P554 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/03/1997 |
| From: | Dante Johnson WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137P563 | List: |
| References | |
| NPL-97-0143, NPL-97-143, NUDOCS 9704090270 | |
| Download: ML20137P554 (1) | |
Text
- -
Wisconsin Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755 2321 6610 Nuclear Rd., Two Rivers. WI 54241 NPL 97-0143 April 3,1997 Document Control Desk.
U. S. NUCLEAR REGULATORY COMMISSION
. Mail Station PI-137 Washington, DC 20555 -
Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301 MONT11LY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of March 1997. Also attached is a corrected Unit 1, February 1997 Operating Data Report reflecting reactor critical hours.
Sincerely,
?G-Q D. F. Johnson Manager -
Regulatory Services & Licensing hds 4
Attachments cc:
L. L. Smith, PSCW NRC Regional Administrator, Region ill NRC Resident inspector I
L gg*9885!ZE' jig 6).
o R
nswao-u nn c,-iu
.