Future Projects
ML25071A215
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/12/2025
From:
Dominion Energy, Virginia Electric & Power Co (VEPCO)
To: Scott Wall
NRC/NRR/DORL/LPL3
References
DLR Digital I&C
Download: ML25071A215 (1)


Text

SLR Digital I&C Project Overview Dominion Energy Surry & North Anna Power Stations Jeremy Chenkovich March 13, 2025 1

Purpose Discussion of Program Phased Approach Design Activities 2

Mission/Vision Vision Be the industry leader in delivering safe, large-scale, Digital I&C upgrades to our nuclear stations to achieve long-term plant reliability Mission Deliver value-added Digital I&C projects on time, on budget and within scope Image created by Ahmed Banafa, retrieved from https://www.linkedin.com/pulse/spacex-dragon-crew-journey-digital-transformation-ouabi/ on June 4 2020 3

SLR Project Goals 4

Enhance safety Address obsolescence Reduce O&M costs Workload, training, etc. reductions anticipated Standardize designs between plants Minimize equipment

Phased Scope Surry Infrastructure

- Instrument Ground System

- Cyber Secure Test Facility (CSTF)

- Technical Support Center Relocation Phase 0/1A

- Digital Control Equipment Room (DCER)

Phase 1B

- Plant Computer System (PCS) Refresh / Integration

- Controls Platform & Network Infrastructure (CPNI)

- Low Level Intake Structure 5

Phased Scope Surry

  • Phase 1B (contd)

- Annunciator (incl. advanced alarming)

- Turbine Controls System (TCS) Integration

- Balance of Plant (BOP) Parts 1 & 2

- Moisture Separator Reheaters (MSR)

- Waste Disposal & Boron Recovery

- Secondary Drains

- Inadequate Core Cooling Monitor (ICCM)

- S/G Water Level Control (SGWLC) 6

Phased Scope Surry

  • Phase 1C

- BOP Part 3

- Rod Position Indication (RPI)

- Rod Control

  • Phase 2A

- EDG Sequencer

- Auxiliary Shutdown Panels

- Nuclear Steam Supply System (NSSS) 7

Phased Scope Surry Phase 2B

- Reactor Protection System (RPS)

- Engineered Safety Features Actuation System (ESFAS)

- Nuclear Instrumentation

- Main Control Room

- AMSAC / Diverse Actuation System (DAS)

Phase 2C

- Condensate Polishing

- SBO Diesel

- MCR EDG controls 8

Phased Scope North Anna

  • Infrastructure

- Instrument Ground System

- Cyber Secure Test Facility (CSTF)

- Technical Support Center Relocation

  • Phase 0/1A

- Digital Control Equipment Room (DCER)

- Controls Platform & Network Infrastructure (CPNI)

- Rod Control

- PCS / Annunciator / TCS Integration 9

Phased Scope North Anna Phase 0/1A (contd)

- ICCM

- Secondary Drains

- Balance of Plant Part 1

- MSRs Phase 1B

- RPI

- NSSS

- AMSAC

- EDG Monitoring 10

Phased Scope North Anna Phase 1C

- BOP Part 2

- Boron Recovery / Waste Disposal

- Advanced Alarming Phase 1D

- Main Control Room Misc NS Phase 2A

- EDG Sequencer

- Process Protection System (PPS)

- Diverse Actuation System (DAS) 11

Phased Scope North Anna

  • Phase 2B

- Aux. Shutdown Panels

- RPS

- ESFAS

- Nuclear Instrumentation

- Main Control Room

  • Phase 2C

- Main Control Room 12

March 12, 2025 13 Surry Main Control Room

March 12, 2025 14 Surry Notional End State

Glass Panel MCR Simulator (GPMS) 15

Glass Panel MCR Simulator (GPMS)

  • Originally intended to solely offload certain Ops training from the plant reference Simulator

- Needed to permit extensive hardware changes

  • Usage has evolved

- Recently completed the SPS Conceptual Validation workshops on the GPMS

- Also intending to use for Preliminary Validation and possibly Integrated System Validation

  • 2nd Plant Reference Simulator also planned 16

Questions?