ML25021A061

From kanterella
Revision as of 20:36, 6 February 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Report 2025-001 for Virgil Summer Nuclear Station, Unit 1, Inoperable Loose-Part Monitoring System Channel
ML25021A061
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/16/2025
From: Jenkins B
Dominion Energy South Carolina
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
25-004 Special Report 2025-001
Download: ML25021A061 (1)


Text

Dominion Energy South Carolina, Inc Virgil C. Summer Nuclear Station Bradham Boulevard & Highway 215, Jenkinsville, SC 29065 Mailing Address:

P.O. Box 88, Jenkinsville, SC 29065 Dominion Energy.com January 16, 2025 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 (VCSNS)

SPECIAL REPORT 2025-001

~

Dominion p, Energys Serial No.25-004 VCS LIC/JB/Rev 0 Docket No. 50-395 License No. NPF-12 INOPERABLE LOOSE-PART MONITORING SYSTEM CHANNEL Dominion Energy South Carolina, Inc. (DESC) hereby submits Special Report 2025-001, pursuant to the requirements of VCSNS Technical Specification (TS) 3.3.3.10 Action a (and TS 6.9.2). This special report is required because the VCSNS Loose-Part Monitoring System (LPMS) Channel 2 has been inoperable for greater than 30 days.

TS 3.3.3.10 requires the LPMS be operable in Modes 1 and 2. LPMS Channels 2 and 3 monitor the bottom of the reactor vessel. Channel 2 was declared inoperable on December 13, 2024, after failing its background check due to a degraded signal. LPMS Channel 3 continues to monitor this region of the reactor vessel for loose parts. Loss of dual-channel coincidence reduces one aspect of the false alarm filtering functionality.

The failed transducer for Channel 2 (IAT00752) is planned for repair or replacement during Refuel 29 in Spring 2026.

Should you have any questions, please call Justin Bouknight at (803) 941-9828.

Sincerely, 1/4~

Beth Jenl<ms Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None Cc:

G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G. Miller - NRC Project Mgr.

NRC Resident Inspector Marsh USA, Inc.