Regulatory Guide 3.3
| ML003740245 | |
| Person / Time | |
|---|---|
| Issue date: | 03/31/1974 |
| From: | Office of Nuclear Regulatory Research |
| To: | |
| References | |
| RG-3.3, Rev 1 | |
| Download: ML003740245 (1) | |
Revision 1 March 1974 U.S. ATOMIC ENERGY COMMISSION
REGULATORY GUIDE
DIRECTORATE OF REGULATORY STANDARDS
REGULATORY GUIDE 3.3 QUALITY ASSURANCE PROGRAM REQUIREMENTS
FOR FUEL REPROCESSING PLANTS AND FOR PLUTONIUM
PROCESSING AND FUEL FABRICATION PLANTS
A. INTRODUCTION
Appendix B, "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," to
10 CFR Part
50,
"licensing of Production and Utilization Facilities,"
establishes quality assurance requirements for the design, construction, and operation of nuclear power plant and fuel reprocessing plant structures, systems, and components. Paragraph 70.22(0
of 10 CFR Part 70, "Special Nuclear Material," requires that each application for a license to possess and use special nuclear material in a plutonium processing and fuel fabrication plant contain a description of the quality assurance program to be applied to the design, fabrication, construction, testing, and operation of the structures, systems, and components of the plant. It further provides that the description include a discussion of how the criteria of 'Appendix B of Part 50 will be met. Paragraph 70.23(b) of 10 CFR Part 70 provides that the Commission will approve construction of a plutonium processing and fuel fabrication plant when it has determined that the design bases and the quality assurance program provide reasonable assurance of protection against natural phenomena and the consequences of potential accidents noting that the criteria in Appendix B will be used in determining the adequacy of the quality assurance program. This regulatory guide describes a method acceptable to the Regulatory staff of complying with the Commission's regulations with regard to overall quality assurance program requirements for fuel reprocessing and for plutonium processing and fuel fabrication plants.
B. DISCUSSION
Subcommittee N45-3, Nuclear Quality Assurance Standards (formerly ad hoc Committee N45-3.7), of the Cornmittee N45, Reactor Plants and Their Maintenance,
- Uines indicate substantial changes from previous issue.
under the sponsorship of the American Society of Mechanical Engineers, has developed a standard wihich includes general guidance for the establishment and execution of quality assurance programs during the design, construction, and operation phases of nuclear power plants. This standard was approved by the American National Standards Committee N45 and its Secretariat, and it was subsequently approved and designated N45.2-1971 by the American National Standards Institute on October 20, 1971.
This standard is adaptable to fuel reprocessing plants and to plutonium processing and fuel fabrication plants, since it was prepared to satisfy the intent and am~lify the requirements of AEC quality assurance regulations and to provide general guidance for the establishment and execution of quality assurance programs.
C., REGULATORY POSITION
The general guidelines for establishing and executing quality assurance programs for nuclear power plants which are included in ANSI N45.2-1971,
"Quality Assurance Program Requirements for Nuclear Power Plants," ' may be adapted to fuel reprocessing plants and to plutonium processing and fuel fabrication plants, and are generally acceptable and provide an adequate basis for complying with the program requirements of Appendix B to IOCFR Part 50 applicable to I uc:l reprocessing plants and to plutonium processing and fuel fabrication plants. When adapting ANSI N45.2-1971 to fuel reprocessing plants and to plutonium processing and fuel fabrication plants, the term "fuel reprocessing and plutonium processing and fuel fabrication plants" should be substituted as applicable wherever specific reference is made to the term "nuclear power plant(s)".
" Copies may be obtained from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, New York 1001 7.
USAEC REGULATORY GUIDES
Copies of published guider may be obtained by request indicating the divons desired to the US. Atomic Energy Commission, Washington. D.C. 20545.
Regfuletorv Guides We issued to describe end mike available to the public Attention: Director of Reguletory Standards. Comments and suggestions for memhods asemPabte to the AEC Regulatory no"f of implementing specific parts of imprtovments in t guides ae encouraged and should be sent to the Secretary the Commlelioss's regulations, to delineate technirques used by the staff in of the Commision. U.S. Atomic Energy Comemrission. Wahington, D.C. 20545.
eseluating specific problems or postulated accidents. or to provide guidanoc to Attention: Chief, Public Proceedings Staff.
ep0plsmnt. Regulatory Gudes we not sulbstitutes for regulations and coomisanen with them is not required. Methods and solutions different from those
1et Out in The guisds are issued in the following ton broed divisions:
the guider will be aemptable if they provike a bis for the findings requisite to Siw to or Watinuance of a permit or licene by the Commission.
1. Power Reactors
7. Productt
2. Reseacfh end Test Reactors
7. Transportation
3. Fuels end Materials Facilities
8. Occupetional Health Publstsefd guides will be rtad periodically.
aeppropriate to accomrnodte
4. Environmental and Siting
9. Antitrust Review coonmrts and to reflect now informntion or experience.
5. Materials end Plent Protection
10. General I