ML021720429
| ML021720429 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 06/13/2002 |
| From: | Dimmery T Duke Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML021720429 (9) | |
Text
Duke 0 Power.
A Duke Energy Company Duke Power Company A Duke Energy Company Energy Center P.O. Box 1006 Charlotte, NC 28201-1006 June 13, 2002 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation McGuire Nuclear Station, Units 1 and 2 Docket Numbers 50-369 and 50-370 Monthly Performance and Operation Status-May, 2002 Please find attached information concerning the performance and operation status of the McGuire Nuclear Station for the month of
- May, 2002.
Any questions or comments may be directed to Roger A. Williams at (704) 382-5346.
Sincerely Terry Dimmery, Manager Nuclear Business Support Attachment XC:
L.
A.
Reyes, Regional Administrator
- USNRC, Region II Frank Rinaldi, Project Manager
Margaret Aucoin Nuclear Assurance Corporation Dottie Sherman, ANI Library American Nuclear Insurers Scott Schaeffer, Senior Resident Inspector V"
Document Control Desk U.S.
NRC -
McGuire bxc:
C.
J.
Thomas (MG01RC)
RGC Site Licensing File ELL (EC050)
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 1
- 2. Reporting Period:
May 1, 2002 - May 31, 2002
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWe):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-369 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2536476
- 17. Gross Electrical Energy Generated (MWH) 882828
- 18. Net Electrical Energy Generated (MWH) 850634
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 103.9
- 22. Unit Capacity Factor (Using DER Net) 96.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 3561.1 0.0 3554.7 0.0 37597628 4233988 4082405 98.1 98.1 102.4 95.5 1.9 Cumulative 179687.0 138492.2 0.0 137235.3 0.0 467249374 152287738 145897415 76.4 76.4 71.5 68.8 9.7 Achieved 3A - 6/13/2002
Page: 1 of 1 UNIT SHUTDOWNS DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-369 McGuire 1 June 13, 2002 Roger Williams 704-382-5346 REPORT MONTH: May, 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C - 6/13/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
McGuire Unit 1
- 2.
Scheduled next refueling shutdown: September 2002
- 3.
Scheduled restart following refueling: October 2002 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1027
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: --
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
November 2005 DUKE POWER COMPANY DATE: June 13, 2002 Name of
Contact:
R. A. Williams Phone:
(704) - 382-5346
Operating Data Report Docket No.
Date Completed By Telephone Operating Status
- 1. Unit Name:
McGuire 2
- 2. Reporting Period:
May 1, 2002 - May 31, 2002
- 3. Licensed Thermal Power (MWt):
3411
- 4. Nameplate Rating (Gross MWe):
1305 *
- 5. Design Electrical Rating (Net Mwe):
1180
- 6. Maximum Dependable Capacity (Gross MWe):
1144
- 7. Maximum Dependable Capacity(Net MWe):
1100
- 8. If Changes Occured in Capacity Ratings (Items Number 3-7) Since Last Report, Give Reasons:
50-370 June 13,2002 Roger Williams 704-382-5346 Notes: *Nameplate Rating (GrossMWe) calculated as 1450.000 MVA *.90 power factor per Page iii, NUREG-0020.
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restrictions, If any:
This Month
- 11. Hours in Reporting Period 744.0
- 12. Number of Hours Reactor was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator On-Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Thermal Energy Generated (MWH) 2536288
- 17. Gross Electrical Energy Generated (MWH) 882260
- 18. Net Electrical Energy Generated (MWH) 851352
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (Using MDC Net) 104.0
- 22. Unit Capacity Factor (Using DER Net) 97.0
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date and Duration of Each)
- 25. If ShutDown At End Of Report Period, Estimated Date of Startup
- 26. Units in Test Status (Prior to Commercial Operation)
Forcast Initial Criticality Initial Electricity Commercial Operation YTD 3623.0 2865.7 0.0 2847.6 0.0 47122594 3325078 3200444 78.6 78.6 80.3 74.9 4.3 Cumulative 159983.0 130684.5 0.0 129439.4 0.0 464513585 148621617 142669723 80.9 80.9 79.0 75.6 5.7 Achieved 3A - 6/13/2002
Page: 1 of I UNIT SHUTDOWNS DOCKET NO. 50-370 UNIT NAME: McGuire 2 DATE: June 13, 2002 COMPLETED BY: Roger Williams TELEPHONE: 704-382-5346 REPORT MONTH: May. 2002 (1) Reason A - Equipment failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory restriction E - Operator Training/License Examination F - Administrative G - Operator Error (Explain)
H - Other (Explain)
(2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain) 3C-6/13/2002 No.
Date:
Type Duration (1) Reason (2) Method of Licensed Cause and Corrective Action to Prevent Recurrence F - Forced Hours Shutdown R/X Event Report S - Scheduled No.
No Outages for the Month Summary:
MONTHLY REFUELING INFORMATION REQUEST
- 1.
Facility name:
McGuire Unit 2
- 2.
Scheduled next refueling shutdown: September 2003
- 3.
Scheduled restart following refueling: October 2003 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 1041 (c) in the ISFSI: 160
- 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
- 9.
Projected date of last refueling which can be accommodated by present license capacity:
June 2003 DUKE POWER COMPANY DATE: June 13, 2002 Name of
Contact:
R. A. Williams Phone: (704) - 382-5346
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT APRIL 2002
- 1.
Personnel Exposure The total station liquid release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for APRIL has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.