tate orf Nefu Terseg James E. McGreevey Department of Environmental Protection Bradley M. Campbell Governor Division of Environmental Safety, Health, Commissioner and Analytical Programs Radiation Protection Programs Bureau of Nuclear Engineering P.O. Box 415 Trenton, New Jersey 08625-0415 Tel (609) 984-7700 Fax (609) 984-7513 June 27, 2003 United States-Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
Subject:
Salem Generating Station, Units 1 and 2 Docket Nos. 50-272 and 50-311 License Change Request S02-07 Request for Change to Technical Specifications Pressure Sensor Response Time Testing PSEG Nuclear LLC submitted the proposed change to the Salem Units and 2 Technical Specifications by letter to the NRC dated April 11, 2003. The proposed change will modify SurveillanceRequirements 4.3.1.1.3,4.3.2.1.3 and Bases Sections B3/4.3.1 and B3/4.3.2 concerning response time testing of the ESF Actuation System (ESFAS) and the Reactor Trip System (RTS).
These changes are based on WCAP-13632, Revision 2 which was approved by the NRC in a letter dated September 5, 1995.
The BNE recommends-that approval of these changes be limited to only the pressure and differential pressure sensors identified in WCAP-3632, Revision 2 as specified on page 15 of the NRC's evaluation of this WCAP that was attached to the NRC's September 5, 1995 letter.
If you need to discuss the subject further, please contact Elliot Rosenfeld at (609) 984-7548.
- Sicerely,
' I '
KentV W.
sch',ariager Bureau of Nuclear Engineering New Jersey is an Equal Opportunity Employer Recycled Paper
Distribution Dr. Jill Lipoti, DEP Dennis Zannoni, DEP Dr. Robert Bores, NRC Robert Fretz, NRC Licensing Project Manager Daniel Orr, Sr Resident Inspector Gabor Salamon, PSEG Nuclear LLC