August 27, 2003 Mr. Alexander Marion, Director, Engineering Nuclear Generation Division Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington DC
SUBJECT:
NEI 02-03 GUIDANCE FOR PERFORMING A REGULATORY REVIEW OF PROPOSED CHANGES TO THE APPROVED FIRE PROTECTION PROGRAM
Dear Mr. Marion,
Thank your for providing me with Revision 0, of NEI 02-03, Guidance for Performing a Regulatory Review of Proposed Changes to the Approved Fire Protection Program, with your June 17, 2003, letter (ML031780500). The staff has no comments, but would like to make the following points regarding the change process:
Changes to the Approved Fire Protection Program (AFPP) must be in accordance with the applicable rules and the plant's specific licensing basis.
This guidance may be used to evaluate changes to the AFPP, but changes that would result in noncompliance with the rules require NRC approval.
Using published guidance, such as NEI 02-03, for evaluating changes to the AFPP should ensure consistent evaluations and will improve the efficiency and effectiveness of the regulatory process.
Sincerely,
/RA/
John Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689
August 27, 2003 Mr. Alexander Marion, Director, Engineering Nuclear Generation Division Nuclear Energy Institute 1776 I Street NW, Suite 400 Washington DC
SUBJECT:
NEI 02-03 GUIDANCE FOR PERFORMING A REGULATORY REVIEW OF PROPOSED CHANGES TO THE APPROVED FIRE PROTECTION PROGRAM
Dear Mr. Marion,
Thank your for providing me with Revision 0, of NEI 02-03, Guidance for Performing a Regulatory Review of Proposed Changes to the Approved Fire Protection Program, with your June 17, 2003, letter (ML031780500). The staff has no comments, but would like to make the following points regarding the change process:
Changes to the Approved Fire Protection Program (AFPP) must be in accordance with the applicable rules and the plant's specific licensing basis.
This guidance may be used to evaluate changes to the AFPP, but changes that would result in noncompliance with the rules require NRC approval.
Using published guidance, such as NEI 02-03, for evaluating changes to the AFPP should ensure consistent evaluations and will improve the efficiency and effectiveness of the regulatory process.
Sincerely,
/RA/
John Hannon, Chief Plant Systems Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation Project No. 689 DISTRIBUTION:
ADAMS SPLB R/F JHannon SWeerakkody DFrumkin EMcKenna JBirmingham RHoefling, OGC K S West ADAMS Accession Number: Package ML032400017 Letter ML0032400012 Incoming ML031780500 Document Name: G\\ SPLB\\Section - B - Weerakkody\\ Frumkin\\letter to NEI02-03.wpd OFFICE SPLB RPRP SC:SPLB OGC BC:SPLB NAME DFrumkin:tw EMcKenna SWeerakkody JHannon DATE 08/13/03 08/13/03 08/14/03 08/26/03 08/27/03 08/ /03 OFFICIAL RECORD COPY