Annotated Copy of Letter to J. Scarola from C. Ogle Regarding Shearon Harris - NRC Supplemental Inspection Report No. 50-400-02-008
ML040090303
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/04/2002
From: Ogle C
NRC/RGN-II/DRS/EB
To: Scarola J
Carolina Power & Light Co
References
EA-00-022, EA-01-310, FOIA/PA-2003-0358 IR-02-008
Download: ML040090303 (4)


See also: IR 05000400/2002008

Text

Geare McDonald - hamrsjf.w d

ratyu

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET SW SUITE 23T85

ATLANTA, GEORGIA 30303-8931

-k***

October 4. 2002

EA-00-022

EA-01 -310

-Carolina Power & Light Company

ATTN: Mr. James Scarola

Vice President - Harris Plant

Shearon Harris Nuclear Power Plant

P. 0. Box 165, Mail Code: Zone 1

New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - NRC SUPPLEMENTAL

INSPECTION REPORT 50-400/02-08

Dear Mr. Scarola:

On September 6, 2002, the Nuclear Regulatory Commission (NRC) performed a supplemental

inspection associated with a White finding identified in the mitigating systems cornerstone at

your Shearon Harris Nuclear Power Plant. The White finding involved a violation of your fire

protection program resulting from a Thermo-Lag fire barrier assembly (wall) which had an

indeterminate fire resistance rating. The NRC determined that portions of your corrective

actions to resolve this issue were appropriate. However, the NRC noted that your planned

corrective actions included the use of

ylr

m nual action as opposed to one of the protection

methods identified in NRC Position C.5.b.(2) of Branch Technical Position BTP)

Q -1.

As a result, e White iindng remainee

crrective

actions and the development of internal NRC inspection guidance in this area. The inspection

report documentinglris was transmitted to you on September 9, 2002.

Subsequent to the completion of the inspection, a Senior Reactor Analyst evaluated the risk

significance of the non-conforming Thermo-Lag barrier taking into consideration your corrective

actions accomplished to date. These actions included separating the auxiliary control panel

room, containing the Thermo-Lag fire barrier in question, from the B Train switchgear room.

This resulted in two separate fire areas, and reduced the ignition frequency of fires capable of

challenging the Thermo-Lag barrier by an order of magnitude. This translated into a

corresponding reduction in the core damage frequency and reduced the risk significance of the

degraded Themmo-Lag barrier to that of a Green finding. Based on this, the White finding will

be removed from the NRC performance summary effective the date of this letter. However,

'

'i

4,

by ,kb

I

ago

orge

Donald - harris-f-

r

ig

CP&L

2

Violation (IO)

50-40=02-08-O1: Failure to Implement and Maintain NRC Agorovd Fire

Protection Program Safe Shutdown System Separation Requirements, remains onen pending

urther NRC review of your corrective actions and the development-of internal NRC inspection

guidance in thia

.lease

inform us when your corrective actions are sufficiently complete

to permit our inspection.

In accordance with 10 CFR 2.790 of the NRC's Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publically Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at httD://www.nrc.gov/reading-m/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RAI

Charles R. Ogle, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No.: 50-400

License No.: NPF-63

cc:

Terry C. Morton, Manager

Performance Evaluation and

Regulatory Affairs

CPB 9

Carolina Power & Light Company

Electronic Mail Distribution

Robert J. Duncan II

Director of Site Operations

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

Benjamin C. Waldrep

Plant General Manager-Harris Plant

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

James W. Holt, Manager

Support Services

Carolina Power & Light Company

Paqe

-+ s

_r\\

_ _ 1,{

_ bees ,,>.e t

wnOl

I eorge roLjodI I

-

_

I

CP&L

3

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

John R. Caves, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

(cc cont'd - See page 3)

(cc cont'd)

William D. Johnson

Vice President & Corporate Secretary

Carolina Power & Light Company

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Beverly Hall, Acting Director

Division of Radiation Protection

N. C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Peggy Force

Assistant Attorney General

State of North Carolina

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

P. O. Box 29510

Raleigh, NC 27626-0510

Robert P. Gruber

Executive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

Linda Coleman, Chairman

8 George MacDonald - harrisJ .wpd

pace 4A

CP&L

4

Board of County Commissioners

of Wake County

P. 0. Box 550

Raleigh, NC 27602

(cc cont'd - See page 4)

(cc cont'd)

Gary Phillips, Chairman

Board of County Commissioners

of Chatham County

Electronic Mail Distribution

Distribution:

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRS

RII:DRP

RII.EICS

SIGNATURE

OGLE

CHRISTENSEN

OGLE

SHANNON

EVANS

NAME

LENAHAN

CASTO

PAYNE

BONSER

EVANS

1

DATE

10/02/2002

104/2002

10/22002

10/02/2002

10/021/2002

111

r20

II/

/2002

E-MAIL COPY?

YES

YES NO

YES

NO

YES

NO

YES

YES

YES

PUBLIC DOCUMENT

YES

_

OFFICIAL RECORD COPY

DOCUMENT NAME: S:\\DRSXEng Branch flFire Protection\\Harns Thermo-Lag White

Finding~harrisfp_thermoagbarler-response.wpd