April 14, 2004 LICENSEE:
Dominion Nuclear Connecticut, Inc.
FACILITY:
Millstone Power Station, Units 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE ON APRIL 8, 2004, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DOMINION NUCLEAR CONNECTICUT, INC., CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE MILLSTONE POWER STATION, UNITS 2 AND 3, LICENSE RENEWAL APPLICATIONS The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Dominion Nuclear Connecticut Inc. (DNC) held a telephone conference (telecon) on April 8, 2004, to discuss and clarify the staffs draft requests for additional information (D-RAI) concerning the Millstone Power Station License Renewal Applications. The telecon was useful in clarifying the intent of the staffs D-RAIs.
During the telecon, DNC was informed that Mr. Russell J. Arrighi is no longer assigned as one of the project managers for the safety review of the Millstone Units 2 and 3 license renewal applications as he has accepted another position within NRR. Mr. Johnny H. Eads remains the project manager for the safety review, and Mr. Richard Emch as the project manager for the environmental review of Millstone Units 2 and 3 license renewal applications. provides a list of the meeting participants. Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant has had an opportunity to review and comment on this summary.
/RA/
Russell Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423
Enclosures:
As stated cc w/enclosures: See next page
April 14, 2004 LICENSEE:
Dominion Nuclear Connecticut, Inc.
FACILITY:
Millstone Power Station, Units 2 and 3
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE ON APRIL 8, 2004, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND DOMINION NUCLEAR CONNECTICUT, INC., CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE MILLSTONE POWER STATION, UNITS 2 AND 3, LICENSE RENEWAL APPLICATIONS The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Dominion Nuclear Connecticut Inc. held a telephone conference (telecon) on April 8, 2004, to discuss and clarify the staffs draft requests for additional information (D-RAI) concerning the Millstone Power Station License Renewal Applications. The telecon was useful in clarifying the intent of the staffs D-RAIs.
During the telecon, DNC was informed that Mr. Russell J. Arrighi is no longer assigned as one of the project managers for the safety review of the Millstone Units 2 and 3 license renewal applications as he has accepted another position within NRR. Mr. Johnny H. Eads remains the project manager for the safety review, and Mr. Richard Emch as the project manager for the environmental review of Millstone Units 2 and 3 license renewal applications. provides a list of the meeting participants. Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.
The applicant has had an opportunity to review and comment on this summary.
/RA/
Russell Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423
Enclosures:
As stated cc w/enclosures: See next page Accession no.: ML041050831 DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041050831.wpd OFFICE PM:RLEP:DRIP LA:RLEP:DRIP SC:RLEP:DRIP NAME RArrighi MJenkins (Ltr. Only)
SLee DATE 4/14/04 4/14/04 4/14/04 OFFICIAL RECORD COPY
DISTRIBUTION: Summary of Telecon with DNC Re: Draft requests for additional information Dated: April 14, 2004 Accession No: ML ML041050831 HARD COPY RLEP RF J. Eads R. Arrighi E-MAIL:
PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff V. Nerses C. Marco C. ODaniell D Shum
Millstone Power Station, Units 2 and 3 cc:
Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectman Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
Millstone Power Station, Units 2 and 3 cc:
David R. Lewis Shaw Pittman, LLC 2300 N. Street N.W.
Washington, DC 20037 Mr. S. E. Scace Assistant to the Site Vice President Dominion Nucler Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. William D. Corbin Director - Nuclear Projects Department Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. William R. Watson, Jr.
Supervisor - License Renewal Project Building 475/5 Millstone Power Station Rope Ferry Road Waterford, CT 06385 Judy Liskov, Assistant Director Waterford Public Library 49 Rope Ferry Road Waterford, Connecticut 06385-2806 Mildred Hodge, Director Three Rivers Community College Thames River Campus 574 New London Turnpike Norwich, Connecticut 06360 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3, LICENSE RENEWAL APPLICATION APRIL 8, 2004 Telecon Participants PARTICIPANTS AFFILIATION Russell Arrighi NRC David Shum NRC Bill Watson DNC Paul Aitken DNC Charlie Sorrell DNC Ben Ridille DNC Marc Hotchaiss DNC Dan Prelewicz ISL Cliff Marks ISL MILLSTONE POWER STATION, UNITS 2 AND 3 REVIEW OF LICENSE RENEWAL APPLICATION FOR DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAI)
April 8, 2004 During the April 8, 2004, conference call with representatives of Dominion Nuclear Connecticut Inc. (DNC), the NRC staff (the staff) discussed draft requests for additional information (D-RAIs) it had prepared for the Millstone Units 2 and 3 license renewal application (LRA). The following D-RAIs were discussed during the telephone conference. Millstone Unit 2 D-RAIs end in suffix "A". The Millstone Unit 3 D-RAIs end in suffix "B".
2.3 SCOPING AND SCREENING RESULTS MECHANICAL SYSTEMS Section 2.3.2.5, Spent Fuel Pool Cooling System (Unit 2)
D-RAI 2.3.2.5-1A Millstone Unit 2 Final Safety Evaluation Report (FSAR) Section 9.5.3.3 states that in the event that a serious leak develops in the spent fuel pool (SFP) liner, makeup water is supplied to the pool from the primary makeup water (PMW) system by manual initiation from the 146" level of the auxiliary building, and that should the leakage exceed the 50 gpm normal makeup capability, additional makeup is available from the refueling water storage tank (RWST) via the refueling water purification system, and the fire protection system by temporary hose connections. License renewal drawing 25203-LR26023, Sheet 2, shows portions of the flow paths from the PMW and RWST systems to the SFP in scope and subject to an aging management review (AMR). Provide justification to explain why all portions of the PMW and RWST makeup paths are not included within the scope of license renewal and subject to an AMR or justify their exclusion.
Response: DNC indicated that the question is clear.
2.3.3.3, Service Water System (Unit 2)
D-RAI 2.3.3.3-1A On license renewal drawing 25203-LR26008, Sheet 2, at locations B6, B9, and B12, the service water strainers overflow lines are shown as outside the scope of license renewal and excluded from being subject to an AMR. Failure of the overflow line may cause the service water to flow to the outside of the strainer and on safety related components in the intake structure. Provide justification to explain why these drain lines are excluded from being within the scope of license renewal and subject to an AMR or justify there exclusion.
Response: DNC indicated that the question is clear.
Section 2.3.3.28, Process and Area Radiation Monitoring System (Unit 2)
D-RAI 2.3.3.28-1A LRA Section 2.3.3.28 states that this system is within the scope of license renewal because it meets the requirements of 10 CFR 54.4(a)(1) by providing, among other things, actuation of certain systems or components in response to detected radiation conditions. In order to perform this function, the section of piping downstream of valves 2-AC-527 and 2-AC-529 serves as a pressure boundary. This section of piping is not shown on license renewal drawing 25203-LR26028, Sheet 2, Sections J6 and G6, as being within the scope of license renewal.
Clarify whether these components are within the scope of license renewal and subject to an AMR or justify their exclusion.
Response: DNC indicated that the question is clear.
Section 2.3.3.35, Diesel Generator System (Unit 2)
D-RAI 2.3.3.35-1A On license renewal diagram 25203-LR26010, Sheet 1, at locations F8 and J8, governors are shown as not subject to an AMR. Although the governor itself is an active component, its housing serves a pressure boundary intended function. The governor housing is not listed in LRA Tables 2.3.3-34 or 3.3.2-34 as a component within the scope of license renewal. Clarify whether this component is included with another component type. If not, justify its exclusion from the scope of license renewal and from being subject to an AMR or update the corresponding tables to include this component.
Response: DNC indicated that the question is clear.
2.3.4.10 Plant Heating and Condensate Recovery System (Unit 2)
D-RAI 2.3.4.10-1A Unit 2 LRA drawing 25203-LR26026 Sheet 3 of 5 does not show the refueling water storage tank (RWST) heat exchanger and attached piping as part of the evaluation boundary. A potential leak in this heat exchanger or the attached piping inside of the RWST could potentially reduce the boron concentration in the tank and thereby impact the safe shutdown boric acid requirements.
Include the RWST heat exchanger and the attached piping inside of the RWST within the scope of license renewal or provide justification to explain why these components are excluded from being within the scope of license renewal and subject to an AMR.
Response: DNC indicated that the question is clear.
2.3.3.2 Service Water System (Unit 3)
D-RAI 2.3.3.2-1B License renewal drawing 25212-LR26933, Sheet 2, shows an in-line flow indicator (FI-162), at location N8 within the scope of license renewal and subject to an AMR. However, this component is not listed in LRA Table 2.3.3-2 as a component type subject to an AMR. In-line flow indicators serve a pressure boundary intended function.
Clarify whether the in-line flow indicator is included with some other component type that is listed in LRA Table 2.3.3-2. If not, justify its exclusion from the scope of license renewal and from being subject to an AMR, or update the corresponding tables to include this component.
Response: DNC indicated that the question is clear.
D-RAI 2.3.3.2-2B License renewal drawing 25212-LR26933, Sheet 2, shows thermowells (TW-65A, B, C and D) at locations H6, H5, H9 and H3, excluded from being within the scope of license renewal and subject to an AMR. Thermowells normally penetrate the piping pressure boundary; therefore, they serve a pressure boundary intended function.
Clarify whether the above described thermowells are included with some other component type that is listed in LRA Table 2.3.3-2. If not, justify their exclusion from the scope of license renewal and from being subject to an AMR, or update the corresponding tables to include this component.
Response: DNC indicated that the question is clear.
Section 2.3.4.3, Feedwater System (Unit 3)
D-RAI 2.3.4.3-1B Unit 3 license renewal drawing 25212-LR26930, Sheets 3 and 4, indicates that a portion of the feedwater system is continued on license renewal drawing 26930, Sheet 1. However, this drawing is not included in the LRA. Additionally, Unit 3 LRA Section 2.3.4.2 states that the evaluation boundary begins at the feedwater flow elements but does not identify the particular elements to which the LRA refers. Please provide LRA drawing 26930, Sheet 1, and identify the flow elements that are mentioned in LRA Section 2.3.4.2.
Response: DNC indicated that the question is clear.