Text
J e.( No. fdff 3
3 -MB-- SYS CM-LCM WO #:
2719090 LEAD WORK CENTER:
EMS LEAD DISCP: PR&C COMPONENT:
3EMBNC01**CKTBRK COMP DESC:
VOLTAGE REGULATOR CABINET PRIORITY:
6 SEQUENCE: 3 DUE:
LOCATION:
ZJ3A PROBLEM DESC:
Following the U3 trip of 6-14-2004, it was discovered through evaluation that the MEl/Fix Field circuits did not response correctly. Troubleshoot the casue of this
- problem, WORK DESC:
END WORK DESC TECH SPEC:
N WX QR:
N SAFETY REQD: N MATLS REQD: -BLANK-SEISMIC CAT:3 SPECIAL CONCERNS:N V CAT: N RCS PERT:
SCFD REQD: N INSL REQD:N EQ MODE:
COATING:
CRDL #:
PERMIT #:
POSTED PERMITS REP REQD: N REP #:
OTHER LEADS (DISCP):
OTHER SUPPORT (DISCP):
PREPARER DATE TECHNICAL APPROVAL DATE NOT REQUIRED TEAM LEADER DATE RELEASING ORGANIZATION DATE PLANNER BACKEND REVIEW REQUIRED []
U
Page I of 2 Report Date: 01-JUL-2004
(WORK ORDER CLOSING INFORMATION) 3 3 -MB -SYS CM - LCM PRIORITY: 6 SEQUENCE: 3 DUE:
WO #: 2719090 LEAD WORK CENTER EMS LEAD DISCP:
COMPONENT:
3EMBNC01**CKTBRK COMP DESC: VOLTAGE REGULATOR CABINET PR&C LOCATION:
ZJ3A
. END WORK DESC WORK STARTDATE/TIME:
JOB SUMATION:
WORK COMPLETE DATE/TIME:
BADGE #
EMPLOYEE NAME TOTAL ACTUAL HOURS MATERIAL REQUESTS # S TEAM LEADER
/
DATE:
RETEST REFERENCE DOCUMENT:
Page 2 of 2 Report Date: 01-JUL-2004