ML042960420

From kanterella
Revision as of 00:30, 16 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
E-mail from David Loveless to Don Marksberry, Subject S/U Transformer Soak Times
ML042960420
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/28/2004
From: David Loveless
Division of Reactor Safety IV
To: Marksberry D
Office of Nuclear Regulatory Research
References
FOIA/PA-2004-0307
Download: ML042960420 (1)


Text

uavia Loveiess - he: zIu iranSTormer soaK times rage I I From:

David Loveless To:

Don Marksberry Date:

Mon. Jun 28, 2004 10:18 AM

Subject:

Re: S/U transformer soak times My man says the same. Let's go with barely enough time to get offsite power within one hour.

Thanks, David

>>> Don Marksberry 06/28/04 09:57AM >>>

Per Bill, a transformer that has been powered down on the high side (such as a startup transformer) for an hour or two (due to a LOOP) does not need soaking.

Soaking is important for cold transformers, which includes moisture and oil testing in addition to no load soak time.