Nuclear Regulatory Commission Presentation, License Renewal Process Public Information Session Brunswick Steam Electric Plant (Bsep), (Slides)
ML043360386
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/04/2004
From: Dudley N
NRC/NRR/DRIP/RLEP
To:
Dudley N, NRR/DRIP/RLEP, 415-1154
Shared Package
ML043360389 List:
References
TAC MC4639, TAC MC4640
Download: ML043360386 (18)


Text

License Renewal Process License Renewal Process Public Information Session Public Information Session Brunswick Steam Electric Brunswick Steam Electric Plant (BSEP)

Plant (BSEP)

Nuclear Regulatory Commission Nuclear Regulatory Commission November 4, 2004 November 4, 2004

22 Purpose of Todays Purpose of Todays Meeting Meeting 3/4 3/4 Describe the Describe the NRCs NRCs license renewal license renewal process process 3/4 3/4 Describe the safety review process Describe the safety review process 3/4 3/4 Explain the public participation process Explain the public participation process 3/4 3/4 Describe how to get additional Describe how to get additional information information

33 NRC Regulations NRC Regulations 3/4 3/4 Atomic Energy Act of 1954 Atomic Energy Act of 1954 3/4 3/4 Title 10 of the Code of Federal Title 10 of the Code of Federal Regulations Part 54 Regulations Part 54

44 Brunswick (BSEP)

Brunswick (BSEP)

Units 1 and 2 Units 1 and 2 License Renewal License Renewal 3/4 3/4 Current operating licenses expire Current operating licenses expire 3/4 3/4 Unit 1 Unit 1 -- September 8, 2016 September 8, 2016 3/4 3/4 Unit 2 Unit 2 -- December 27, 2014 December 27, 2014 3/4 3/4 Application dated October 18, 2004 Application dated October 18, 2004 3/4 3/4 Application requests authorization to Application requests authorization to operate units for an additional 20 years operate units for an additional 20 years

55 NRCs NRCs License Renewal License Renewal Review Review 3/4 3/4 Safety Review Safety Review 3/4 3/4 Environmental Review Environmental Review 3/4 3/4 Plant Inspections Plant Inspections 3/4 3/4 Advisory Committee on Reactor Advisory Committee on Reactor Safeguards (ACRS)

Safeguards (ACRS)

66 License Renewal Process License Renewal Process License Renewal License Renewal Application Application Safety Safety Review Review Environmental Environmental Review Review Onsite Onsite Inspection Inspection Activities Activities Inspection Inspection Report Report Safety Safety Evaluation Evaluation Safety Safety Evaluation Evaluation Report Report ACRS ACRS Review Review ACRS ACRS Report Report Scoping Scoping Activities Activities Draft Draft Supplement Supplement To GEIS To GEIS Comments Comments On Draft On Draft Final Final Supplement Supplement To GEIS To GEIS Hearings*

Hearings*

Agency Agency Decision on Decision on Application Application Formal Public Participation

    • If a request for hearing is granted

77 Principles of License Principles of License Renewal Renewal 3/4 3/4 Regulatory process is adequate for Regulatory process is adequate for ensuring safety of operating plants ensuring safety of operating plants 3/4 3/4 Current licensing basis is adequate and Current licensing basis is adequate and carries forward into period of extended carries forward into period of extended operation operation

88 Safety Review Process Safety Review Process 3/4 3/4 Technical Evaluation Technical Evaluation 3/4 3/4 Integrated Plant Assessment Integrated Plant Assessment 3/4 3/4 Audit Programs Audit Programs 3/4 3/4 On On--Site Plant Inspections Site Plant Inspections 3/4 3/4 Scoping and Screening Inspection Scoping and Screening Inspection 3/4 3/4 Aging Management Program Aging Management Program Inspection Inspection

99 Technical Evaluation Technical Evaluation 3/4 3/4 Focuses on Passive, Long Focuses on Passive, Long--Lived,

Lived, Structures and Components Structures and Components 3/4 3/4 Evaluates effectiveness of aging Evaluates effectiveness of aging management programs management programs 3/4 3/4 Analyzes Time Analyzes Time--Limited Aging Effects Limited Aging Effects

10 10 Scope of License Scope of License Renewal Rule Renewal Rule 3/4 3/4 Safety related systems, structures, and Safety related systems, structures, and components relied upon to:

components relied upon to:

3/4 3/4 Maintain integrity of the reactor coolant Maintain integrity of the reactor coolant pressure boundary pressure boundary 3/4 3/4 Ensure capability to shut down and Ensure capability to shut down and maintain a safe shutdown condition maintain a safe shutdown condition 3/4 3/4 Prevent or mitigate offsite exposures Prevent or mitigate offsite exposures

11 11 Scope of License Scope of License Renewal Rule Renewal Rule (Contd)

(Contd) 3/4 3/4 Non Non--safety related systems, structures, and safety related systems, structures, and components whose failure could prevent components whose failure could prevent satisfactory accomplishment of safety related satisfactory accomplishment of safety related functions, as outlined above.

functions, as outlined above.

3/4 3/4 Systems, structures, and components relied Systems, structures, and components relied upon for compliance with the following upon for compliance with the following regulations: Fire protection, Environmental regulations: Fire protection, Environmental qualification, Pressurized thermal shock, qualification, Pressurized thermal shock, Anticipated transients without scram, and Anticipated transients without scram, and Station Blackout Station Blackout

12 12 Safety Evaluation Report Safety Evaluation Report 3/4 3/4 Documents the basis and conclusions of Documents the basis and conclusions of the staffs Safety Review the staffs Safety Review 3/4 3/4 ACRS provides independent review of ACRS provides independent review of the Safety Evaluation Report the Safety Evaluation Report

13 13 Guidance Documents Guidance Documents 3/4 3/4 Standard Review Plan for Review of License Standard Review Plan for Review of License Renewal Applications for Nuclear Power Renewal Applications for Nuclear Power Plants (NUREG Plants (NUREG--1800) 1800) 3/4 3/4 Generic Aging Lessons Learned Report, GALL Generic Aging Lessons Learned Report, GALL (NUREG (NUREG--1801) 1801) 3/4 3/4 Regulatory Guide 1.188, Standard Format Regulatory Guide 1.188, Standard Format and Content for Applications to Renew and Content for Applications to Renew Nuclear Power Plant Operating Licenses Nuclear Power Plant Operating Licenses

14 14 Ten Attributes for Ten Attributes for Acceptable Aging Acceptable Aging Management Programs Management Programs SCOPE SCOPE PREVENTIVE ACTION PREVENTIVE ACTION PARAMETERS PARAMETERS MONITORED/

MONITORED/

INSPECTED INSPECTED AGING EFFECT AGING EFFECT MONITORING AND MONITORING AND TRENDING TRENDING ACCEPTANCE ACCEPTANCE CRITERIA CRITERIA CORRECTIVE ACTIONS CORRECTIVE ACTIONS CONFIRMATION CONFIRMATION PROCESS PROCESS ADMIN CONTROLS ADMIN CONTROLS OPERATING OPERATING EXPERIENCE EXPERIENCE

15 15 Opportunities for Public Opportunities for Public Participation Participation 3/4 3/4 60 60--day opportunity to request a hearing day opportunity to request a hearing 3/4 3/4 Environmental Scoping Public Meeting Environmental Scoping Public Meeting 3/4 3/4 Draft Environmental Impact Statement Draft Environmental Impact Statement Public Meeting Public Meeting 3/4 3/4 ACRS Meetings ACRS Meetings 3/4 3/4 Public Meetings on Safety Review Public Meetings on Safety Review

16 16 Typical Review Schedule Typical Review Schedule 3/4 3/4 Receive License Renewal Application Receive License Renewal Application Month 0 Month 0 3/4 3/4 Conduct Public Information Session Conduct Public Information Session Month 1 Month 1 3/4 3/4 Publish Notice of Opportunity for Hearing Publish Notice of Opportunity for Hearing Month 2 Month 2 3/4 3/4 Conduct Environmental Scoping Meeting Conduct Environmental Scoping Meeting Month 4 Month 4 3/4 3/4 Conduct Draft SEIS Public Meeting Conduct Draft SEIS Public Meeting Month 12.5 Month 12.5 3/4 3/4 Complete ACRS Review Complete ACRS Review Month 20.5 Month 20.5 3/4 3/4 Make Decision on Application (with Hearing)

Make Decision on Application (with Hearing) Month 30 Month 30

17 17 Point of Contact Point of Contact 3/4 3/4 Agency point of contact:

Agency point of contact:

Sikhindra Sikhindra Mitra Mitra 11--800 800--397 397--4209 4209 3/4 3/4 Documents are located in the William Randall Documents are located in the William Randall Library, UNC at Library, UNC at Wilmington, Wilmington, 601 South College 601 South College Road, North Carolina Road, North Carolina 3/4 3/4 Documents can also be viewed at the Documents can also be viewed at the NRCs NRCs Web Web site (

site (www.nrc.gov www.nrc.gov))