Generic Letter 2003-01: Control Room Habitability - Revised Commitments
ML043420198
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/23/2004
From: Domonique Malone
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-03-001
Download: ML043420198 (3)


Text

aVA NMC Palisades Nuclear Plant Commied to Nulr Operated by Nuclear Management Company, LLC November 23, 2004 10 CFR 50, Appendix A U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Generic Letter 2003-01: Control Room Habitability - Revised Commitments By letter dated November 25, 2003, Nuclear Management Company, LLC (NMC) provided schedules for completion of commitments associated with generic letter (GL) 2003-01 for four NMC plants. The completion of all committed actions is dependent on performing control room envelope in-leakage testing in accordance with ASTM E741 "Standard Test Method for Determining Air Change in a Single Zone by Means of a Tracer Gas Dilution." The performance of this testing is a function of vendor availability and the completion of plant site preparation activities.

The Palisades Nuclear Plant has experienced an extended refueling outage due to emergent reactor vessel head nozzle repair work. The outage extension resulted in delays in completing preparation activities necessary to perform the ASTM E741 test and kept the plant in a configuration that would not allow the testing to take place until after the vendor's committed test schedule. Consequently, NMC is providing a revised schedule of commitments for the Palisades Nuclear Plant. The commitments have been revised to reflect the next appropriate opportunity for the vendor to perform the testing and for the necessary preparation activities to be completed.

kA~O 27780 Blue Star Memorial Highway. Covert, Michigan 49043-9530 Telephone: 269.764.2000

It-Document Control Desk Page 2 Summary of Commitments Revised commitments for the Palisades Nuclear Plant are contained in Enclosure 1.

Daniel J. Malone Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosure (1)

CC Administrator, Region IlIl, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

ENCLOSURE 1 GENERIC LETTER 2003-01: CONTROL ROOM HABITABILITY REVISED COMMITMENTS Commitments Each'60-day'response stated that NMC' would provide'the schedule [for the activity listed below] by December 5.,2003.-

-..Schedule forCompletion Palisades Nuclear Plant'

1. Perform the ASTM E741 testing [T]

April 2005 and, [provide] the requested response to GL 2003-01 item 1(a)

T+ 90 days

2.

Verifying by ASTM E741 testing that the most limiting inleakage has been incorporated into the hazardous T+90 days chemical assessments (GL 2003-01 item 1 (b) part 1)

3.

[Perform a] smoke assessment (GL T+90 days 2003-01 item 1(b) part 2)

T+90 days

4.

Development of technical specification changes (and any associated plant modifications) to support requested T+120 days(1) information GL 2003-01 item 1 (c)

(1) Technical Specification submittal dates are contingent on timely approval and issuance of the CLIIP for the Technical Specification Task Force (TSTF) - 448 traveler on control room habitability. Completion dates may change based upon any plant modifications determined to be necessary by the testing.