Vogtle Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 03/02/2006 13:08:32 Report 22
PS2-EP
- EP EXERCISE Baseline Inspections 03/20/2006 03/24/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 03/20/2006 03/24/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/20/2006 03/24/2006 1, 2 71151 IP Performance Indicator Verification
EB3 PI&R
- PI&R SAMPLE RHR WELD FAILURES Baseline Inspections 06/12/2006 06/16/2006 1, 2 71152 IP Identification and Resolution of Problems
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 06/19/2006 06/23/2006 1, 2 7111112B IP Maintenance Effectiveness
EB3-HS
- HEAT SINK Baseline Inspections 07/17/2006 07/21/2006 1, 2 7111107B IP Heat Sink Performance
PSB1-RP
- RP OCCUPATIONAL PRE-INSPECTION VISIT Baseline Inspections 08/28/2006 08/30/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas
PSB1-RP
- RP OCCUPATIONAL BASELINE WK1 Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 09/18/2006 09/22/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/18/2006 09/22/2006 1, 2 71151 IP Performance Indicator Verification
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 09/25/2006 09/29/2006
7111108P IP Inservice Inspection Activities - PWR
EB3TI150
- 2515/150 U-1: RPV & VHP NOZZLES Safety Issues 09/25/2006 09/29/2006
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-
EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 10/02/2006 10/06/2006
7111108P IP Inservice Inspection Activities - PWR
PSB1-RP
- RP OCCUPATIONAL BASELINE WK2 Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 10/02/2006 10/06/2006 1, 2 71151 IP Performance Indicator Verification
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Baseline Inspections 10/15/2006 10/20/2006
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
PB2-PI&R
- BIENNIAL PI&R PROGRAM INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 02/12/2007 02/16/2007 1, 2 71152B IP Identification and Resolution of Problems
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
Enclosure
Vogtle Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 03/02/2006 13:08:32 Report 22
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111117B IP Permanent Plant Modifications
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007
7111108P IP Inservice Inspection Activities - PWR
EB3TI150
- 2515/150 U-2: RPV & VHP NOZZLES Safety Issues 03/12/2007 03/16/2007
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA-03-
PS2-EP
- EP INSP Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 03/19/2007 03/23/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/19/2007 03/23/2007 1, 2 71151 IP Performance Indicator Verification
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 03/19/2007 03/23/2007
7111108P IP Inservice Inspection Activities - PWR
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)
Baseline Inspections 04/01/2007 04/06/2007
71111 IP Reactor Safety-Initiating Events, Mitigating Systems, Barrier Integrity
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 04/23/2007 04/27/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/07/2007 05/11/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 05/21/2007 05/25/2007 1, 2 7111121 IP Component Design Bases Inspection
OL PREP
- INITIAL EXAM PREP Not Applicable 07/16/2007 07/20/2007
V23228 VOGTLE/EXAM AT POWER FACILITIES
PSB1-RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 07/30/2007 08/01/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas
OL EXAM
- INITIAL EXAM Not Applicable 08/06/2007 08/17/2007
V23228 VOGTLE/EXAM AT POWER FACILITIES
PSB1-RP
- RP PUBLIC BASELINE INSP Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 08/20/2007 08/24/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 08/20/2007 08/24/2007 1, 2 71151 IP Performance Indicator Verification
EB2-TFP
- TFP - INFORMATION TRIP Baseline Inspections 09/11/2007 09/13/2007 1, 2 7111105T IP Fire Protection [Triennial]
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Vogtle Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 03/02/2006 13:08:32 Report 22
- REQUAL INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.