Transmittal of South Texas Project, Units 1 and 2 - Response to NRC Request for Additional Information on Proposed Change to Surveillance Requirement 4.5.2.d
ML073380345
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/26/2007
From: Rencurrel D
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
D43.02, NOC-AE-07002225, STI: 32217161, TAC MD5705, TAC MD5706
Download: ML073380345 (3)


Text

Attachments 1 -5 Not for Public Disclosure per 10CFR2.390 Nuclear Operating Company South Texas Prolect Electric Generatin8 Station PO Bax 28,9 Wadsworth, Texas 77483.

November 26, 2007 NOC-AE-07002225 10CFR50.90 D43.02 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Response to NRC Request for Additional Information on Proposed Change to Surveillance Requirement 4.5.2.d (TAC Nos. MD5705, MD5706)

Reference:

Letter dated May 21, 2007, from David W. Rencurrel, STPNOC, to NRC Document Control Desk, "Proposed Change to Surveillance Requirement 4.5.2.d" (NOC-AE-07002156, ML071560560)

STP Nuclear Operating Company (STPNOC) is making this submittal to respond to a request for additional information (RAI) from the NRC staff regarding the referenced proposed amendment to South Texas Project Operating Licenses NPF-76 and NPF-80. The license amendment request proposes revising the Technical Specification (TS) Surveillance Requirement (SR) 4.5.2.d for the inspection of the Emergency Core Cooling System (ECCS) sumps for consistency with the new STP sump design.

The enclosure responds to the RAI and provides additional reference documents.

STPNOC requests approval of the proposed amendment by December 31, 2007, consistent with the currently scheduled formal implementation of the revised ECCS sump design basis per the resolution of Generic Safety Issue (GSI)- 191.

STPNOC requests that Attachments 1 - 5 to the enclosure be withheld from public disclosure in accordance with 1 OCFR2.3 90.

There are no commitments in this letter.

STI: 32217161 Attachments 1-5 Not for Public Disclosure per 10CFR2.390 Aot2..

NOC-AE-07002225 Page 2 If there are any questions regarding the proposed amendment, please contact Mr. A. W. Harrison at (361) 972-7298 or me at (361) 972-7867.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 1112k ID7 Date d

vaicW. Roecurrel Vice President, Engine n

& Strategic Projects

Enclosure:

Response to NRC Request for Additional Information

NOC-AE-07002225 Page 3 cc:

(paper copy)

(electronic copy)

Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 7 D 1) 11555 Rockville Pike Rockville, MD 20852 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Mohan C. Thadani U. S. Nuclear Regulatory Commission Thad Hill Eddy Daniels Marty Ryan Harry Holloway Steve Winn NRG South Texas LP Ed Alarcon J. J. Nesrsta R. K. Temple Kevin Pollo City Public Service Jon C. Wood Cox Smith Matthews C. Kirksey City of Austin