Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3
ML073540010
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 01/25/2008
From: Ellen Brown
NRC/NRR/ADRO/DORL/LPLII-2
To:
Tennessee Valley Authority
Brown Eva, NRR/DORL, 415-2315
Shared Package
ML073540008 List:
References
TAC MD5262, TAC MD5263, TAC MD5264
Download: ML073540010 (6)


Text

January 25, 2008 LICENSEE:

Tennessee Valley Authority FACILITY:

Browns Ferry Units 1, 2, and 3

SUBJECT:

SUMMARY

OF NOVEMBER 30, 2007, MEETING WITH TENNEESSEE VALLEY AUTHORITY ON STEAM DRYER PORTION OF THE EXTENDED POWER UPRATE REVIEW (TAC NOS. MD5262, MD5263, AND MD5264)

On November 30, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 1 public meeting with Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the NRC staffs concerns with the steam dryer analyses provided in support of the extended power uprate (EPU) amendment request for Browns Ferry Nuclear Plant. The meeting was open to the public. Enclosure 1 contains a list of attendees.

The licensees slides used in their presentation may be accessed from the NRCs Agencywide Documents Access and Management System under No. ML073550596.

DISCUSSION In a letter dated October 23, 2007, the NRC staff provided several broad steam dryer issues from the review of the licensees July 27 and August 21, 2007 submittals. The licensee responded in a letter dated November 21, 2007. In recent conference calls, TVA indicated that the information needed to validate evaluations of the structural integrity of the steam dryers for Units 1 and 2, and establish a baseline for Unit 3, would not be available until after the March 2008 Unit 3 outage. This meeting was intended to provide TVA an opportunity to present their response to the NRC staffs concerns with the steam dryer analyses, obtain a better understanding of the outstanding information needed, and the schedule for its submission.

TVA provided a status of their efforts to date for the EPUs and briefly discussed a potential license condition for Unit 1 concerning shutdown margin and containment overpressure as it relates to presentation of the issue to the Advisory Committee for Reactor Safeguards.

Additionally, TVA provided a presentation regarding six concerns outlined by the NRC staff regarding the steam dryer submittals.

One of the concerns identified centered around a 218 hertz peak that exists on all three units.

TVA has indicated that the peak is a result of unused safety relief valve (SRV) standpipes would be dampened by the installation of acoustic vibration suppressors (AVSs). The licensees analyses assume that this peak is dampened by the proposed modification. The NRC staff questioned TVA on the degree of confidence they had that the SRV standpipes were the source of the peak. TVA indicated that they had high confidence that the standpipes were the source of the peak and that the AVS modification would dampen it. The modification is to be installed into Unit 3 during the March 2008 outage with the data and supporting analyses provided to the NRC in June 2008. The NRC staff questioned TVAs plans should the June 2008 analyses indicate that the modification did not work. TVA indicated that there was no plan in place at this time.

A portion of the meeting focused on the schedule for the submission of the remaining information needed. TVA indicated that Unit 1 data and analyses would be submitted in January 2008, and the Unit 3 data and analyses would be provided in June 2008, with the intent to restart Unit 1 from the October 2008 refueling outage in November 2008 at EPU conditions. The NRC staff indicated that the NRC staff should be able to complete the review for the EPUs approximately 5 months from the date of the last submittal, provided no additional concerns are identified.

No commitments or regulatory decisions were made by the NRC staff during the meeting.

/RA/

Eva A. Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296

Enclosure:

List of Attendees cc w/enclosure: See next page

ML073540010 Pkg: ML073540008 NRC-001

Page 1 0f 2 List of Attendees U. S. Nuclear Regulatory Commission Public Meeting with Tennessee Valley Authority Regarding Browns Ferry Power Uprate November 30, 2007 U. S. NUCLEAR REGULATORY COMMISSION ARGONNE NATIONAL LABORATORY Jim Dyer Vik Shah John Grobe Samir Ziada Cathy Haney Tim McGinty Pat Hiland Thomas Boyce Kamal Manoly Cheng-Ih Wu Rich Lobel Eva Brown TENNESSEE VALLEY AUTHORITY William Campbell, Jr.

Kenneth Spates Larry Nicholson Beth Wetzel James Emens J.D. Wolcott Ed Hartwig Bob Marks PUBLIC SERVICE ENERGY GROUP NUCLEAR Jeff Keenan CONSTELLATION ENERGY Gary Pavis LIS SCIENTECH Deann Raleigh

Page 1 0f 2 Tennessee Valley Authority BROWNS FERRY NUCLEAR PLANT cc:

Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. James R. Douet Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. H. Rick Rogers Vice President Nuclear Engineering & Technical Services Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Brian J. O=Grady, Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, TN 37902 Mr. John C. Fornicola, General Manager Nuclear Assurance Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Mr. Steven M. Douglas General Manager Browns Ferry Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 Ms. Beth A. Wetzel, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801 Mr. James E. Emens, Jr., Interim Manager Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 James B. Baptist Browns Ferry Senior Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.

Suite 24T85 Atlanta, GA 30303-8931 Tomy A. Nazario Browns Ferry Project Engineer Division of Reactor Projects, Branch 6 U.S. Nuclear Regulatory Commission 61 Forsyth Street, SW.

Suite 24T85 Atlanta, GA 30303-8931 Senior Resident Inspector U.S. Nuclear Regulatory Commission Browns Ferry Nuclear Plant 10833 Shaw Road Athens, AL 35611-6970 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Mr. Larry E. Nicholson, General Manager Performance Improvement Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801

Page 2 of 2 Mr. William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 1101 Market Street Chattanooga, TN 37402-2801