IR 05000458/2008007

From kanterella
Revision as of 14:51, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000458-08-007, on 08/21/2008, for River Bend, Inspection Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction
ML082760765
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/02/2008
From: Ryan Lantz
Operations Branch IV
To: Mike Perito
Entergy Operations
Lynn berger
References
IR-08-007
Download: ML082760765 (3)


Text

October 2, 2008

SUBJECT:

RIVER BEND STATION - NRC INSPECTION SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION REPORT 05000458/2008007

Dear Mr. Perito:

On August 21, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a site-specific implementation of B.5.b, Phase 2 and 3, temporary instruction team inspection of your River Bend Station. The enclosed report documents the teams results, which were discussed on August 21, 2008, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b, Phase 2 and 3, mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.

2 If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety

Docket:

50-458 License:

NPF-47

cc w/o enclosure:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Vice President, Oversight Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Entergy Operations, Inc.

3 Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995