Indian Point, Unit 3 - Retraction of Entergy'S Request for Relaxation from NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML15085A069
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/16/2015
From: Coyle L
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, NL-15-036, TAC MF0745
Download: ML15085A069 (2)


Text

S-EntergyIndian Point Energy Center450 Broadway, GSBP.O. Box 249Buchanan, N.Y. 10511-0249Tel (914) 254-6700Lawrence CoyleSite Vice PresidentNL-15-036March 16, 2015U.S. Nuclear Regulatory CommissionATTN: Document Control Desk11545 Rockville Pike, TWFN-2 F1Rockville, MD 20852-2738SUBJECT:REFERENCES:Retraction of Entergy's Request for Relaxation from NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements forMitigation Strategies for Beyond-Design-Basis External Events (TACNo. MF0745)Indian Point Unit Numbers 3Docket No. 50-286License No. DPR-641. Entergy letter to NRC (NL-15-012), Entergy's Request forRelaxation from NRC Order EA-12-049, "Order ModifyingLicenses with Regard to Requirements for Mitigation Strategiesfor Beyond-Design-Basis External Events (TAC No. MF0745),dated January 28, 20152. NRC Order Number EA-12-049, Order Modifying Licenses withRegard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012Dear Sir or Madam:The purpose of this letter is to request the retraction of Entergy's "Request forRelaxation from NRC Order EA-12-049" (Reference 1).On January 28, 2015, Entergy Nuclear Operations, Inc. (Entergy) submitted a requestfor relaxation (Reference 1) from the requirements of NRC Order EA-12-049 (Reference2) for Indian Point Unit 3 (IP3).As stated in Reference 1, the relaxation was requested due to the possibility thatimplementation of Order EA-12-049 could not be achieved, i.e., the Reactor CoolantPump seal leak off line orifice might not be successfully installed during the Spring2015 IP3 refueling outage (3R18).The installation of the orifices on the seal leak off lines have gone as planned during theIP3 3R18 outage, and the seal leakage rate calculations developed by Westinghousefor the seal leakage model have been successfully completed and accepted by Entergy.

NL-15-036Docket 50-286Page 2 of 2Final resolution of the leak off of RCP seals identified in Westinghouse Nuclear SafetyAdvisory Letter (NASL) 14-1 is still ongoing between the NRC and the Industry. Anynew information that would require a revision to our strategies will be entered into ourcorrective action program.This letter contains no new regulatory commitments. Should you have any questionsregarding this submittal, please contact Mr. Robert Walpole, Manager, RegulatoryAssurance at (914) 254-6710.Sincerely,mKcc: Mr. Douglas V. Pickett, Senior Project Manager, NRC NRR DORLMr. Daniel H. Dorman, Regional Administrator, NRC Region 1Mr. John Boska, Senior Project Manager, NRC NRR DORLNRC Resident Inspectors OfficeMr, John B. Rhodes., President and CEO, NYSERDAMs. Bridget Frymire, New York State