IR 05000237/2009402
| ML090761201 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 03/17/2009 |
| From: | Eric Duncan Plant Support Branch II |
| To: | Pardee C Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-09-402 | |
| Download: ML090761201 (4) | |
Text
March 17, 2009
SUBJECT:
DRESDEN NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000237/2009402(DRS);
Dear Mr. Pardee:
On February 13, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Dresden Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on February 13, 2009, with Mr. D. Gronek and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Nonpublic Enclosure: Inspection Report 05000237/2009402(DRS);
w/Attachment: Supplemental Information
cc w/encl:
D. Riffle, NSIR/DSO/DDSO
B. Finlay, Dresden Site Security Manager
J. Klinger, State Liaison Officer, State of Illinois
cc w/o encl:
Site Vice President - Dresden Nuclear Power Station
Plant Manager - Dresden Nuclear Power Station
Manager Regulatory Assurance - Dresden Nuclear Power Station
Senior Vice President - Midwest Operations
Senior Vice President - Operations Support
Vice President - Licensing and Regulatory Affairs
Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden, and Quad Cities
Associate General Counsel
Document Control Desk - Licensing
Assistant Attorney General
Chairman, Illinois Commerce Commission