IR 05000275/2009403

From kanterella
Revision as of 08:05, 14 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000275-09-403, and IR 05000323-09-403, on 11/05/2009, for Diablo Canyon Power Plant, Units 1 and 2, NRC Security Inspection Report. (Letter)
ML093290319
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/25/2009
From: Shannon M
Plant Support Branch-1
To: Conway J
Pacific Gas & Electric Co
References
IR-09-403
Download: ML093290319 (3)


Text

November 25, 2009

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2009403 AND 05000323/2009403

Dear Mr. Conway:

On November 5, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Diablo Canyon Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 5, 2009, with Mr. L. Sharp, Senior Director, Engineering Services, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, a licensee-identified violation which was determined to be of very low security significance is listed in this report. The NRC is treating this violation as a noncited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it is entered into your corrective action program. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection UNITED STATES NUCLEAR REGULATORY COMMISSION R EGIO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Pacific Gas and Electric Company 2 report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Diablo Canyon Power Plant.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael P. Shannon, Chief

Plant Support Branch-1

Division of Reactor Safety

Docket Nos.: 50-275, 50-323 License Nos.: DPR-80, DPR-82

Nonpublic Enclosure:

NRC Inspection Report 05000275/2009403 and 05000323/2009403 w/Attachment:

Supplemental Information

cc w/o enclosure:

James R. Becker, Site Vice President Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Pacific Gas and Electric Company 3 Distribution w/enclosure:

Ronald Albert (Ronald.Albert@nrc.gov), Chief, Reactor Security Oversight Branch Shyrl Coker, (Shyrl.Coker@nrc.gov) NSIR/DSO/DDSO, TWFN Mail Stop: T-3A5M Senior Resident Inspector (Michael.Peck@nrc.gov)

Electronic distribution by RIV:

Distribution w/o enclosure:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

DC Site Secretary (Agnes.Chan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource ROPreports DRS STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

Security Related Complete Report - OUO:

SUNSI Review Completed: ETB

ADAMS: : Yes Initials: ETB

Non-Publicly Available : Sensitive-Security-Related-Periodic Review Required

Letter Only:

SUNSI Review Completed: ETB

ADAMS: : Yes Initials: ETB

Publicly Available
Non-Sensitive

ML SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:PSB1 ETByre PFrechette MPShannon GMiller MPShannon

/RA/

/RA/

/RA/

/RA/

/RA/

11/10/09 11/16/09 11/16/09 11/23/09 11/25/09