IR 05000250/2009403
| ML093420668 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/07/2009 |
| From: | Ernstes M NRC/RGN-II/DRS/PSB2 |
| To: | Nazar M Florida Power & Light Co |
| References | |
| IR-09-403 | |
| Download: ML093420668 (4) | |
Text
December 7, 2009
SUBJECT:
TURKEY POINT NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000250/2009403 AND 05000251/2009403
Dear Mr. Nazar:
On November 20, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Turkey Point Nuclear Plant. The primary purpose of the inspection was to evaluate the completion of required actions in Confirmatory EA-08-172, dated October 20, 2008.
Additionally, inspectors evaluated LER 05000250/2009-S01-00, dated September 16, 2009. The enclosed inspection report documents the inspection results, which were discussed on November 20, 2009, with Mr. M. Kiley and other members of your staff.
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is self-revealing.
The deficiency was corrected, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. However, because of the very low security significance and because it was entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest this violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional FP&L
2 Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Turkey Point Nuclear Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41
Enclosure: Inspection Report 05000250/2009403 and 05000251/2009403 w/Attachment: Supplemental Information
cc w/encl.: (See page 3) FP&L
3 cc w/encls:
Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035
Tuane Young Security Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035-1800
Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company 9760 SW 344th Street Florida City, FL 33035
_________________________
X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME J. Wallo M. Ernstes
M. Sykes
DATE 12/02/2009 12/07/2009
12/03/2009
E-MAIL COPY?
YES / NO YES / NO YES / NO YES / NO YES / NO