Notice of Category 1 Meeting with Constellation Energy to Discuss the NRCs Assessment of the Safety Performance of the R. E. Ginna Nuclear Power Plant for Calendar Year 2009 and the Role of the Agency in Ensuring Safe Plant Operations
ML100690412
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/10/2010
From: Glenn Dentel
Reactor Projects Branch 1
To:
Shared Package
ML100541651 List:
References
10-033
Download: ML100690412 (4)


Text

March 10, 2010 No.10-003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING licensee:

Constellation Energy Facility:

R. E. Ginna Nuclear Power Plant Docket No.

50-244 Date and Time:

March 23,2010 from 5:00 p.m. to 7:00 p.m.

Location:

Ontario Town Hall 1850 Ridge Rd Ontario, NY, 14519

Purpose:

To discuss the Nuclear Regulatory Commission's assessment of the safety performance of the R. E. Ginna Nuclear Power Plant for calendar year 2009 and the role of the agency in ensuring safe plant operations.

Attendees:

NRC:

D. Lew. Director, Division of Reactor Projects, Region I G. Dentel, Chief, Projects Branch 1, Region I K. Kolaczyk. Senior Resident Inspector

l. Casey. Resident Inspector Constellation: J. Carlin, Vice President Ginna Station E. Larson, Plant General Manager T. Harding, Director licensing S. Brown, Acting Manager, Nuclear Safety & Security J. Sullivan, Operations Manager M. Geckle, Manager, Training M. Giacini, Manager, Maintenance T. Paglia. Manager. Integrated Work Management P. Swift. Manager, Nuclear Engineering Services Public Participation*: The R. E. Ginna Annual Assessment Meeting is a Category 1 Meeting.

The public is invited to observe this meeting. and will have an opportunity to communicate with the NRC staff before the meeting is adjourned. Prior to the Annual Assessment Meeting with Constellation Energy, severa! NRC representatives will also be available during the information session.

2 The NRC's Annual Assessment Letter for R. E. Ginna Nuclear Power Plant can be located in ADAMS with Accession Number ML100620833. ADAMS is accessible from the NRC Web Site at: http://www.nrc.govlreading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail: glenn.dentel@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 18, 2010, via telephone to the NRC meeting contact.

AP.'JPrOV;g;ed by:

()v(liJ--/ii)-~

Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects cc:

Distribution via LlstServ

2 The NRC's Annual Assessment Letter for R. E. Ginna Nuclear Power Plant can be located in ADAMS with Accession Number ML100620833. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.htmL Additional information relative to the NRC's Annual Assessment Process and the safety performance of R. E. Ginna Nuclear Power Plant can be found on the NRC's web site at:

www.nrc.gov/NRRlOVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Glenn Dentel, Chief, Projects Branch 1 (610) 337~5233 E-mail: glenn.dentel@nrc.gov Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 18, 2010, via telephone to the NRC meeting contact.

Approved by:

IRA Art Burritt forI Glenn Dentel, Chief Projects Branch 1 Division of Reactor Projects Distribution: see attached page SUNSI Review Complete: _...:=:G~TD:::..-__ (Reviewer's Initials)

ML100690412 DOCUMENT NAME: S:\\ROP*10 EOC RevieW\\Branch 1\\Ginna AAM Notice.doc After declarlrg this document "An Official Agency Record' It willtwill not be released to the Public.

To receive a copy of this document, Indicate in the box: *C*::: Copy without attaChment/enclosure 'E"::: Copy with attachmentlenclosure "N' =No copy OFFICE RIIDRP I

RIIDRP r

I I

I NAME JHawkinslJH GDentellGTD DATE 03/09/10 03/09/09 I""

3 Distribution:

Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OEDO Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation. NRR Director. Division of Inspection & Regional Support, NRRlDIRS Director. Division of Operating Reactor licensing. NRRlDORL Asst. General Counsel Materials Litigation & Enforcement, OGe S. Collins, RA (R10RAMAIL RESOURCE)

M. Dapas. DRA (R10RAMAIL RESOURCE)

D. Lew, DRP (R1 DRPMAIL RESOURCE)

J. Clifford. DRP (R1 DRPMAIL RESOURCE)

D. Roberts, DRS (R1DRSMail RESOURCE)

P. Wilson, DRS (R1DRSMail RESOURCE)

L. Troeine, RI OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP S. Sloan, DRP K. Kolaczyk, DRP, SRI L. Casey, DRP, RI M. Rose, DRP RidsNrrPMREGinna Resource ROPreportsResource@nrc.gov N. Sheehan, PAO D. Serenei, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl Receptionist PMNS (RiDSEDOMAILCENTER)

(RIDSEDOMAllCENTER)

(RIDSNRROD)

(RIDSNRROD)

(RIDSNRRDIRS)

(RIDSNRRDORl)

(RIDSOGCMAllCENTER)