April 1, 2010
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DRESDEN NUCLEAR
POWER STATION NRC INSPECTION REPORT 05000237/2009-005;
Dear Mr. Pardee:
This letter acknowledges your letter to the U. S. Nuclear Regulatory Commission (NRC) dated
March 12, 2010, which provided a response to our inspection report issued on February 10,
2010, concerning activities conducted at your Dresden Nuclear Power Station facility. The letter
contested one of the Non-Cited Violations (NCVs) contained in the inspection report, namely
NCV 05000237/2009005-03, associated with Preconditioning the Unit 2 Emergency Diesel
Generator Prior to Performing Technical Specification Surveillance Requirements.
We are currently reviewing your basis for contesting the NCV. The NRC seeks to be thorough
and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as
soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-237; 50-249
cc:
Distribution via ListServ
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
April 1, 2010
Mr. Charles G. Pardee
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DRESDEN NUCLEAR
POWER STATION NRC INSPECTION REPORT 05000237/2009-005;
Dear Mr. Pardee:
This letter acknowledges your letter to the U. S. Nuclear Regulatory Commission (NRC) dated
March 12, 2010, which provided a response to our inspection report issued on February 10,
2010, concerning activities conducted at your Dresden Nuclear Power Station facility. The letter
contested one of the Non-Cited Violations (NCVs) contained in the inspection report, namely
NCV 05000237/2009005-03, associated with Preconditioning the Unit 2 Emergency Diesel
Generator Prior to Performing Technical Specification Surveillance Requirements.
We are currently reviewing your basis for contesting the NCV. The NRC seeks to be thorough
and timely in the review of licensee responses to NCVs. Accordingly, we will inform you as
soon as we complete our evaluation.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records System (PARS) component of NRC's Agencywide Documents
Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark A. Ring, Chief
Branch 1
Division of Reactor Projects
Docket No. 50-237; 50-249
cc:
Distribution via ListServ
DOCUMENT NAME: G:\\Dresden\\Dresden_contested_precond_Ack Ltr.doc
G Publicly Available
G Non-Publicly Available
G Sensitive
G Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE
RIII
NAME
MRing:dtp
DATE
04/01/10
OFFICIAL RECORD COPY
Letter to C. Pardee from M. Ring dated April 1, 2010.
SUBJECT:
ACKNOWLEDGMENT OF DISPUTED VIOLATION - DRESDEN NUCLEAR
POWER STATION NRC INSPECTION REPORT 05000237/2009-005;
DISTRIBUTION:
Susan Bagley
RidsNrrDorlLpl3-2
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley
ROPreports Resource