ML110460624

From kanterella
Revision as of 23:54, 13 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2011 Kewaunee Power Station Initial License Examination Administered Admin JPMs
ML110460624
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/11/2011
From: Walton R
Operations Branch III
To:
References
RO-119-JP16A, Rev. B
Download: ML110460624 (127)


Text

Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-A-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 15 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Calculate Reactivity Placard Information per SP-87-151 JPM NUMBER:

RO-119-JP16A REV.

B RELATED PRA INFORMATION:

N/A TASK NUMBER(S) /

TASK TITLE(S):

1190160301 / Control Informational Aids K/A NUMBERS:

2.1.25 Ability to Interpret reference materials, such as graphs, curves, tables, etc.

RO IMP 3.9 / SRO IMP 4.2 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

X Simulator:

X Other:

X Classroom Lab:

Time for Completion:

20 Minutes Time Critical:

No Alternate Path / Faulted:

No TASK APPLICABILITY:

RO / SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-A-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 15 JPM Number:

RO-119-JP16A JPM

Title:

Calculate Reactivity Placard Information per SP-87-151 Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 15 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

The plant is at 100% power Current burnup for the core is 15,000 MWD/MTU Current RCS boron is 400 ppm.

The Boric Acid Storage Tanks are at 8.0 weight% boric acid.

All automatic systems are operating at program values.

SP-87-151, Weekly Instrument Channel Checks is in progress.

PPCS is currently unavailable.

INITIATING CUES (IF APPLICABLE):

The Unit Supervisor directs you to perform step 6.11 of SP-87-151, UPDATE Reactivity placards and CHECK they are reasonable for existing plant conditions.

NOTE: Provide attached blank Reactivity Placard form to the Performer when requested.

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 15 JPM PERFORMANCE INFORMATION Required Materials:

SP-87-151, Reactor Data Manual General

References:

SP-87-151 Weekly Instrument Channel Checks, Rev. 60 Reactor Data Manual CO-REPORT-TOP-VEP-FRD Section 2.2.2.1 for MTC and power Defect.

Section 2.2.2.2 for Differential Boron Worth Task Standards:

Determine the values for the parameters on the Reactivity Placard to within pre-determined limits, and record information on the Reactivity Placard.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical Yes Determine Power Defect Standard:

Record Power Defect value between - 26.25 ppm/% and - 26.00 ppm/%.

Evaluator Note:

The Power Defect is obtained from the Reactor Data Manual Graph RD 7.4 (10/07/2009) using the 100% power at 400 ppm boron. The coordinate lies between - 2625 ppm and - 2600 ppm. This value is divided by 100% to get the required value.

The order in which values are determined is not specified. The JPM is laid out to fill-in the Reactivity Placard from top to bottom. The performer may do this in any order.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 15 Performance Step: 2 Critical Yes Determine MTC Standard:

Record MTC value between - 32.0 pcm/ºF and - 33.0 pcm/ºF.

Evaluator Note:

The MTC is obtained from the Reactor Data Manual Graph RD 8.1 (10/07/2009) using Burnup of 15,000 MWD/MTU Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical Yes Determine Differential Boron Worth (DBW)

Standard:

Record DBW value between - 7.35 pcm/ppm and - 7.40 pcm/ppm.

Evaluator Note:

The DBW is obtained from the Reactor Data Manual Graph RD 6.4 (10/07/2009) using Burnup of 15,000 MWD/MTU Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 15 Performance Step: 4 Critical Yes Determine DILUTE Values: 1 PPM Standard:

Record DILUTE 1PPM value between 84.0 gallons water/ppm and 86.0 gallons water/ppm.

Evaluator Note:

Using Table 2.2.11 (03/03/2009), at the current RCS boron concentration of 400 ppm the chart shows that it requires 855 gallons of water to dilute the RCS 10 ppm. Thus the water required is 85.5 gallons/ppm. The minimum value comes from calculation for diluting 1 ppm.

The crews typically use the 10 ppm RCS boron change values for accuracy.

There is no requirement to use those values.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 5 Critical Yes Determine DILUTE Values: % pwr Standard:

Divide the DILUTE PPM value by DBW value and multiply by Power Defect Value.

Record DILUTE % pwr value between 295 gallons water/% pwr and 307.1 gallons water/% pwr Evaluator Note:

Dividing the 1PPM values by the DBW values yields a range of -11.351 gallons/pcm to -11.701 gallons/pcm. (84 / -7.40 and 86 / -7.35)

Multiplying these values by the Power Defect values yields a range of 295.1 gallons/% to 307.1 gallons/%. (-11.351 x -26.00 and -11.701 x -26.25)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 15 Performance Step: 6 Critical Yes Determine DILUTE Values: ºF Standard:

Divide the DILUTE PPM value by DBW value and multiply by MTC Value.

Record DILUTE ºF value between 363 gallons water/ºF and 386.1 gallons water/ºF Evaluator Note:

Dividing the 1PPM values by the DBW values yields a range of -11.351 gallons/pcm to -11.701 gallons/pcm. (84 / -7.40 and 86 / -7.35)

Multiplying these values by the MTC values yields a range of 363.2 gallons/ºF to 386.1 gallons/ºF. (-11.351 x -32 and -11.701 x -33)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 7 Critical Yes Determine BORATE Values: 1 PPM Standard:

Record BORATE 1PPM value between 2.52 gallons boron/ppm and 2.55 gallons boron/ppm.

Evaluator Note:

Using Table 2.2.11 (03/03/2009), at the current RCS boron concentration of 400 ppm the chart shows that it requires 25.3 gallons of acid to borate the RCS 10 ppm. Thus the water required is 2.53 gallons/ppm. The minimum value comes from calculation for borating 5 ppm and the maximum for borating 2 ppm.

The crews typically use the 10 ppm RCS boron change values for accuracy.

There is no requirement to use those values.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 15 Performance Step: 8 Critical Yes Determine BORATE Values: % pwr Standard:

Divide the BORATE PPM value by DBW value and multiply by Power Defect Value.

Record BORATE % pwr value between 8.85 gallons boron/% pwr and 9.11 gallons boron/% pwr Evaluator Note:

Dividing the 1PPM values by the DBW values yields a range of - 0.341 gallons/pcm to - 0.347 gallons/pcm. (2.52/ -7.40 and 2.55/ -7.35)

Multiplying these values by the Power Defect values yields a range of 8.854 gallons/% to 9.107 gallons/%. (-0.341 x -26.00 and -0.347 x -26.25)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical Yes Determine BORATE Values: ºF Standard:

Divide the BORATE PPM value by DBW value and multiply by MTC Value.

Record BORATE ºF value between 10.9 gallons boron/ºF and 11.45 gallons boron/ºF Evaluator Note:

Dividing the 1PPM values by the DBW values yields a range of - 0.341 gallons/pcm to - 0.347 gallons/pcm. (2.52/ -7.40 and 2.55/ -7.35)

Multiplying these values by the MTC values yields a range of 10.9 gallons/ºF to 11.45 gallons/ºF. (-0.341 x -32 and -0.347 x -33)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 15 Performance Step: 10 Critical No Update DATE Standard:

Place the current days date in DATE blank on Reactivity Placard.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When Reactivity Placard is returned or when the information has been recorded on Reactivity Placard, This JPM is complete.

Stop Time:

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 15 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

RO-119-JP16A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 15 JPM KEY REACTIVTY PLACARD INFORMATION GENERAL INFORMATION Power Defect -26.00 - -26.25 pcm/%pwr MTC

_-32.0 - -33.0 _ pcm/ºF DBW

_-7.35 - -7.40 _ pcm/ppm DILUTE 1 PPM 84.0 - 86.0 gallons water/ppm

% pwr _ 295 - 307.1 gallons water/%pwr

ºF

_ 363 - 386.1 gallons water/ºF BORATE 1 PPM _2.52 - 2.55 gallons boron/ppm

% pwr _8.85 - 9.11 _ gallons boron/%pwr

ºF 10.9 - 11.45 gallons boron/ºF DATE __Todays Date___________

RO-119-JP16A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 15 TURNOVER SHEET INITIAL CONDITIONS:

The plant is at 100% power Current burnup for the core is 15,000 MWD/MTU Current RCS boron is 400 ppm.

The Boric Acid Storage Tanks are at 8.0 weight% boric acid.

All automatic systems are operating at program values.

SP-87-151, Weekly Instrument Channel Checks is in progress PPCS is currently unavailable.

INITIATING CUES (IF APPLICABLE):

The Unit Supervisor directs you to perform step 6.11 of SP-87-151, UPDATE Reactivity placards and CHECK they are reasonable for existing plant conditions.

RO-119-JP16A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 15 REACTIVTY PLACARD INFORMATION GENERAL INFORMATION Power Defect _____________ pcm/%pwr MTC

_____________ pcm/ºF DBW

_____________ pcm/ppm DILUTE 1 PPM ____________ gallons water/ppm

% pwr ____________ gallons water/%pwr

ºF

____________ gallons water/ºF BORATE 1 PPM ____________ gallons boron/ppm

% pwr ____________ gallons boron/%pwr

ºF

____________ gallons boron/ºF DATE _______________________

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 15 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Stenner 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

RO-119-JP16A, Calculate Reactivity Placard Information per SP-87-151, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA1-L-RO-01212011-100 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 15 Historical Record:

Rev. A - new Rev B Added Reference for the definition of terms for Power Defect, MTC and DBW

Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 13 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Review and Approval of Radiological Liquid Waste Discharge Permit JPM NUMBER:

SO-119-JP03B REV.

C RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

1190030102/ Direct Discharge of radiological liquid waste K/A NUMBERS:

2.3.6 Ability to approve release permits IMP 3.8 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

X Classroom Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path / Faulted:

NO TASK APPLICABILITY:

SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 13 JPM Number:

SO-119-JP03B JPM

Title:

Review and Approve Liquid Radiological Waste Discharge Permit Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 13 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 13 INITIAL CONDITIONS:

You are the Shift Manager.

Current Plant Conditions are as follows:

Power was reduced to maintain vacuum following stopping CW pump 1B due to high vibrations at 0035 o Generation at 540 MWe Gross o 90% NI Power o Thermal Power 1593 MWt Actions to discharge CVC Monitor Tank 1A are in progress per NOP-CVC-007, CVC Monitor Tanks and Pumps.

o CVC Monitor Tank 1A has been sampled Yesterday at 2200 per NOP-CVC-007, CVC Monitor Tanks and Pumps THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS TASK IS NOT TIME CRITICAL INITIATING CUES (IF APPLICABLE):

APPROVE the Liquid Waste Discharge Permit for CVC Monitor Tank 1A.

Evaluator Note:

After covering the initial conditions and initiating CUE then give the student Attachment A and the marked up copy of NOP-CVC-007 for sampling of CVC Monitor Tank 1A Attachment D.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 13 JPM PERFORMANCE INFORMATION Required Materials:

Training Discharge Permit Attachment A (Faulted before the discharge)

Training Discharge Permit Attachment B (Not Faulted before the discharge)

Training Discharge Permit Attachment C (Faulted After Discharge is Complete)

NOP-CVC-007 - Marked Up Copy for Sampling CVC Monitor Tank 1A NOP-CVC-007 - Marked Up copy after discharge complete SP-32A-136 Rev 33, Radiological Discharges (Batch Mode)

Calculator General

References:

NOP-CVC-007, CVC Monitor Tanks and Pumps, Rev. 3.

SP-32A-136, Radiological Discharges (Batch Mode), Rev. 38 Task Standards:

1.

Identify incorrect number CW pumps running and associated Minimum Dilution Flow on Radiological Liquid Waste Discharge Permit (Attachment A)

2.

Approve Radiological Liquid Waste Discharge Permit (Attachment B)

3.

Identify Initial Tank Level greater than 2% different from tank level at the time of sampling.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 13 Performance Step: 1 Critical: Yes Approval and Disposition of Radiological Liquid Waste Discharge Permit Standard:

Identify incorrect number CW pumps running and associated Minimum Dilution Flow on Radiological Liquid Waste Discharge Permit Evaluator Note:

Attachment A has the fault of an incorrect number of CW pumps running and associated Minimum Dilution Flow Attachment B has no faults IF the performer fixes the Radiological Liquid Waste Discharge Permit (Attachment A) by lining out and initial the error and entering the correct values (1 CW and 200,000 gpm) and then signs Attachment A, the performer has NOT successfully completed this step, the Tritium Concentration Number will be incorrect Evaluator Cue:

IF the performer signs the original Radiological Liquid Waste Discharge Permit (Attachment A) without fixing the fault THEN state This Concludes the JPM and terminate JPM.

IF the performer signs the original Radiological Liquid Waste Discharge Permit (Attachment A) after fixing the fault by lining out the incorrect values and inserting values, (correct values would be: 1 CW and 200,000 gpm), THEN state This Concludes the JPM and Terminate JPM.

IF the performer identifies the fault in the Radiological Liquid Waste Discharge Permit (Attachment A) THEN Acknowledge the fault and give the performer Attachment B and state The Chemistry Tech has created a new discharge permit.

IF the performer identifies the fault and contacts chemistry/AO for a new discharge permit THEN Acknowledge the fault and provide Attachment B to the performer stating A new Radiological Liquid Waste Discharge Permit has been created.

IF asked if CW A pump is running THEN respond CW A pump is running.

IF asked if R-18 is operating THEN respond R-18 is operating.

IF the performer states they will log approval then respond Acknowledge logging.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 13 Performance Step: 2 Critical: Yes Approve Radiological Liquid Waste Discharge Permit Standard:

Approve Radiological Liquid Waste Discharge Permit OR Disprove the discharge permit because > 2% difference from initial tank level.

Evaluator Cue:

IF the performer does not approve the Radiological Liquid Waste Discharge Permit THEN state This concludes the JPM and Terminate the JPM.

IF the performer approves the Radiological Liquid Waste Discharge Permit THEN perform the following:

1. Take the Radiological Liquid Waste Permit (Attachment B) from the performer.
2. State the following The discharge of CVC Monitor Tank 1A was performed per NOP-CVC-007 and the AO has routed the completed Radiological Liquid Waste Discharge Permit for your Approval and Disposition.
3. Provide the student with the completed Radiological Liquid Waste Permit (Attachment C) AND marked up copy of NOP-CVC-007 for completing the discharge of CVC Monitor Tank 1A. (Attachment E).

IF the performer asks for current level in the CVC Monitor Tank A THEN state the following, The NAO reports that CVC Monitor Tank A level is 91%.

IF the performer asks for the current level in the CVC Monitor Tank A in gallons THEN state the following, The NAO reports the level in the CVC Monitor Tank A as 6825 gallons.

Evaluator Note:

IF the performer does not approve the discharge permit because the initial tank level is > 2% different from the level listed on the discharge permit, THEN Step 3 is completed SAT and the JPM can be ended Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 13 Performance Step: 3 Critical: Yes Review for Disposition completed Radiological Liquid Waste Discharge Permit Standard:

Identify Initial Tank Level greater than 2% different from tank level at the time of sampling.

Evaluator Cue:

IF the performer identifies that the initial tank level is greater than 2% different from the tank level at the time of sampling THEN:

IF contacted as AO THEN respond The initial tank level is correct I made an error and did not recognize the greater than 2% difference from tank level at the time of sampling.

IF contacted as Chemistry THEN respond Will Take actions IAW with SP-32A-136, Radiological Discharges (Batch Mode).

IF the performer states that they will initiate a CR THEN respond Acknowledge Initiation of CR.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the performer has completed review for the second discharge permit This JPM is complete.

Stop Time:

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 13 During the evaluation, the trainee:

Evaluation Performed the task correctly and in accordance with procedure usage and adherence requirements.

PASS FAIL Never put anyones safety at risk.

PASS FAIL Never put equipment reliability at risk.

PASS FAIL Never violated radiological work practices.

PASS FAIL Demonstrated effective use of event-free human performance tools.

PASS FAIL SO-119-JP03B ATTACHMENT A.pdf SO-119-JP03B ATTACHMENT B.pdf SO-119-JP03B ATTACHMENT C.pdf JPM SO-119-JP03B ATTACHMENT D.pdf JPM SO-119-JP03B ATTACHMENT E.pdf

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 13 SIMULATOR SET UP:

None

SO-119-JP03B, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 13 TURNOVER SHEET INITIAL CONDITIONS:

You are the Shift Manager.

Current Plant Conditions are as follows:

Power was reduced to maintain vacuum following stopping CW pump 1B due to high vibrations at 0035 o Generation at 540 MWe Gross o 90% NI Power o Thermal Power 1593 MWt Actions to discharge CVC Monitor Tank 1A are in progress per NOP-CVC-007, CVC Monitor Tanks and Pumps.

o CVC Monitor Tank 1A has been sampled Yesterday at 2200 per NOP-CVC-007, CVC Monitor Tanks and Pumps THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS TASK IS NOT TIME CRITICAL INITIATING CUES: APPROVE the Liquid Waste Discharge Permit for CVC Monitor Tank 1A.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 13 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or N/A or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written.

The individual(s) performing the validation shall sign and date this form.

Mike Nichls / 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

SO-119-JP03B, Review and Approve Liquid Radiological Waste Discharge Permit, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA4-L-SRO-A-01212011-095 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 13 Historical Record:

Rev. A New.

Rev. B Updated to current procedure revisions and JPM Template version.

Updated step 2 to include possibility of identifying > 2% differences in tank level during performance of this step.

Rev C Changed the order of the cues for step 2 to aid in administration

Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 13 JOB PERFORMANCE MEASURE (JPM)

SITE:

KPS JPM TITLE:

Determine Allowable Overtime JPM NUMBER:

RO-119-JP17A REV.

B RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

1190170301 / Control hours worked as established by the Overtime Policy K/A NUMBERS:

2.1.5 RO / SRO Imp 2.9 / 3.9 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

X Classroom Lab:

Time for Completion:

16 Minutes Time Critical:

No Alternate Path /

Faulted:

No TASK APPLICABILITY:

RO Additional signatures may be added as needed.

Developed by: Andrew P. Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew P. Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 13 JPM Number:

RO-119-JP17A JPM

Title:

Determine Allowable Overtime Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 13 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

You are a licensed RO.

The plant has been operating at 100% power for the past 30 days.

You have been called to cover tomorrows shift as a NCO due to an illness.

Your work history including the proposed shift is attached.

THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS TASK IS NOT TIME CRITICAL INITIATING CUES (IF APPLICABLE):

Determine your ability to complete the scheduled work hours without additional authorization(s) or limits exceeded.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 13 JPM PERFORMANCE INFORMATION Required Materials:

Attached work schedule LI-AA-700 General

References:

LI-AA-700, Fatigue Management and Work Hour Limits for Covered Workers, Rev. 2 Task Standards:

Worker hours reviewed per LI-AA-700 step 5.2.8, and the following limitations identified:

1.

Will exceed 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period

2.

Does not have a break period of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> between work shifts.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: 1 Critical: No LI-AA-700, Step 3.1.1 REFER to Attachment 1, Examples of Covered and Non-Covered Work Standard:

Determine work is COVERED WORK.

Evaluator Note:

The performer should identify that the work he has completed and is scheduled to perform is covered work. The Performer is not required to state this but is inferred by determining limitations in the Critical Step.

Step 3.1.2 is not required to be performed to determine covered status.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 13 Performance Step: 2 Critical: No LI-AA-700, Step 3.2.1 APPLY work hour limits and the associated calculation and tracking of work hours to the individuals who direct or perform covered work Standard:

Determine the following limitations apply for the given schedule without waivers or exceptions:

No more than 16 consecutive hours No more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> worked in any rolling 24-hour period.

No more than 26 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br /> worked in any rolling 48-hour period.

No more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> worked in any rolling 168-hour (7-day) period.

At least a 10-hour break between successive work periods or an 8-hour break when a break of less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is necessary to accommodate a crews or individuals scheduled transition between work schedules or shift.

A 34-hour uninterrupted, continuous break in any 216-hour (9-day) period.

Evaluator Note:

This information is stated in step 3.3.1 and addressed in step 5.2.8 for each individual.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 13 Performance Step: 3 Critical: No LI-AA-700, Step 3.2.2 and 3.2.3 INCLUDE the following in work hour calculations:

o Covered work performed on-site o

Call-in work periods EXCLUDE the following from work hour calculations:

o Primary and Secondary shift turnover (See Attachment 15 for further guidance)

Standard:

Determine work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> apply to work hour calculation for each work days 1 &

2 (1800 -0600);.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> apply for work days 5, 6, 7 and 8 (0600 - 1800); and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> apply for the proposed work day tomorrow (0100 - 1300).

Determine the times listed as TO (P) for each work day are excluded from work hour calculations.

Evaluator Note:

Steps 3.2.2 and 3.2.3 cover a laundry list of items that are considered for inclusion or exclusion from work hour calculations. This step only identifies those that are applicable to the current situation.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 13 Performance Step: 4 Critical: No LI-AA-700, Step 3.3.3 During online operations and without issuance of a waiver, ENSURE an individual's required average minimum days off adheres to the requirements listed in Table 2 (averaged over the shift cycle).

Table 2: Required Minimum Days Off (Non-Outage)

Covered Individual**

8-Hour Shift*

10-Hour Shift*

12-Hour Shift*

Maintenance 1 day/week 2 days/week 2 days/week Operations, HP, Chemistry, Fire Brigade 1 day/week 2 days/week 2.5 days/week Security 1 day/week 2 days/week 3 days/week

  • Average over a shift cycle of no more than 6 weeks
    • See 5.3.10 for definition of covered work.

Standard:

Determine required minimum days off is 2.5 days per week Evaluator Note:

Steps 3.1.4 through 3.3.7 do not apply.

The next applicable section 3.7, with consideration for call-in work.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 13 Performance Step: 5 Critical: Yes LI-AA-700, Step 3.7.5 To determine if an individual can be called in to work or work in excess of scheduled hours, USE the following guidelines to determine if a work hour limit will be exceeded:

a. EVALUATE hours worked to determine if any limit will be exceeded based on the work schedule by a backward look at the number of hours that have or will have been worked based on a time in the future (i.e., if the individual works at time T, how many hours will be worked in the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s/48 hours/168 hours preceding time T relative to 10 CFR 26 work hour limits as well as minimum days off and between shift break requirements).

Standard:

Determine the following limits will be exceeded if the schedule is followed:

No more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> worked in any rolling 24-hour period.

AND At least a 10-hour break between successive work periods or an 8-hour break when a break of less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is necessary to accommodate a crews or individuals scheduled transition between work schedules or shift.

Evaluator Note:

The performer should identify that the following 2 limits will be exceeded with the proposed work schedule.

Day 8 (Today) work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (0600-1800) and Proposed (Tomorrow) work 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> but 5 of those hours are within the same 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period extending from Day 8 for a total of 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />. (No more that 16 work hours in any rolling 24-hour period)

Day 8 (Today) and Proposed (Tomorrow) only have 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> of break time between work shifts (At least a 10-hour break between successive work periods or an 8-hour break when a break of less than 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> is necessary to accommodate a crews or individuals scheduled transition between work schedules or shift).

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the performer has evaluated the individuals for satisfying the overtime requirements, This JPM is complete.

Stop Time:

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 13 During the evaluation, the trainee:

Evaluation Performed the task correctly and in accordance with procedure usage and adherence requirements.

PASS FAIL Never put anyones safety at risk.

PASS FAIL Never put equipment reliability at risk.

PASS FAIL Never violated radiological work practices.

PASS FAIL Demonstrated effective use of event-free human performance tools.

PASS FAIL

RO-119-JP17A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 13 TURNOVER SHEET INITIAL CONDITIONS:

You are a licensed RO.

The plant has been operating at 100% power for the past 30 days.

You have been called to cover tomorrows shift as a NCO due to an illness.

Your work history including the proposed shift is attached.

THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS TASK IS NOT TIME CRITICAL INITIATING CUES (IF APPLICABLE):

Determine your ability to complete the scheduled work hours without additional authorization(s) or limits exceeded.

RO-119-JP17A, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 13 DAY 1 DAY 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 (Today)

Proposed (Tomorrow) 1800 - 0600 1735 - 1800 TO (P) 1800 - 0600 1740 - 1800 TO (P)

OFF OFF 0600 - 1800 0545 - 0600 TO (P) 0600 - 1800 0545 - 0600 TO (P) 0600 - 1800 0535 - 0600 TO (P) 0600 - 1800 0545 - 0600 TO (P) 0100 - 1300 (early call-in)

TO indicates the time that was spent for shift turnover activities (primary).

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 13 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Chris Brandt 011/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

RO-119-JP17A, Determine Allowable Overtime, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMROA2-L-RO-A-01212011-102 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 13 Historical Record:

Rev. A New.

Rev. B - SJ. Incorporate NRC comments on JPM Updated to Rev. 2 of LI-AA-700.

In Initial Cues and Turnover Information, Initial Cues: added bullet, You are a licensed RO. and changed another bullet to read, You have been called to cover tomorrows shift as a NCO due to an illness.

Removed JPM title from page containing work history that is to be provided to Performer.

Changed Performance Steps to reflect to the specific action step from the procedure LI-AA-700. Added new steps 1 through 4 to tie procedural action steps to Performance Steps. Critical Step was also tied to procedural action step (LI-AA-700, step 3.7.5).

Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 14 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Review SP-87-151: Faulted DG A Fuel Oil Level JPM NUMBER:

SO-119-JP011 REV.

B RELATED PRA INFORMATION:

Kewaunee System Importance to at Power CDF/LERF EDG 1st/4th TASK NUMBER(S) /

TASK TITLE(S):

1190010202 Review A Completed Surveillance Procedure K/A NUMBERS:

2.1.25 Ability to Interpret reference materials, such as graphs, curves, tables, etc.

(CFR 41.10/43.5/45.12 SRO 4.2)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

x EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

x Other:

x Lab:

Time for Completion:

20 Minutes Time Critical:

NO Alternate Path /

Faulted:

YES TASK APPLICABILITY:

SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 14 JPM Number:

SO-119-JP011 JPM

Title:

Review SP-87-151, Faulted DG A Fuel Oil Level Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 14 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

The unit is at 100% Rated Thermal Power o

Current burnup for the core is 15,000 MWD/MTU o

Current RCS boron is 400 ppm.

o The Boric Acid Storage Tanks are at 8.0 weight% boric acid.

o All automatic systems are operating at program values.

o PPCS is currently unavailable.

SP-87-151, Weekly Instrument Channel Checks, has just been completed.

Annunciator 47093-C, Diesel Gen A Fuel Oil Level Abnormal is LIT - Crew is performing actions per the ARP. - Maintenance has reported that automatic make up to the day tank is NOT working, however manual makeup to the day tank is available. I&C has determined that the setpoint for maintaining day tank level were set too low INITIATING CUES (IF APPLICABLE):

As the supervisor review the complete SP-87-151 CUE:

After the examinee has been given the initial conditions and the initiating cue then give the candidate the marked up copy of SP-87-151 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin JPM PERFORMANCE INFORMATION

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 14 Required Materials:

Completed SP-87-151 with the following:

Faulted reading for EDG A Fuel Tank Level. Attachment A: A.1.2.c has 106.4 in H20 and A.1.2.d has level corresponding to Attachment B level not Attachment A level (Level below TS SR 3.8.3.1)

Technical Specifications and Bases Technical Requirements Manual COLR Completed Reactivity Plaque card Marked Up Copy of ARP-47093-C, Diesel Gen Fuel Oil Level Abnormal General

References:

SP-87-151, Weekly Instrument Channel Checks Technical Specifications and Bases Technical Requirements Manual C1033 Safeguard's Diesel Fuel Oil Storage Volume Calculation OP-KW-ORT-DGM-001A,Emergency Diesel Generator 1A Operation Log, Rev 9 Task Standards:

Examinee required to identify the following items:

1.

Need to Order Fuel Oil

2.

LCO 3.8.1 NOT MET

3.

Required Actions and Completion Times for LCO 3.8.1 Condition B Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

NOTE: The steps of this JPM may be performed in any order.

NOTE: If this step is performed in the simulator without any other JPMS in progress then update the reactivity plaque card with information contained in the attachment and Activate annunciator 47093-C.

Evaluator Cue: If during the performance of the JPM the examinee request the status of performing ARP-47093-C then provide the marked up copy of the ARP to the examinee

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 14 Performance Step:1 Critical NO Review SP-87-151 Weekly Instrument Channel Checks Data Sheet Standard:

Identify that value recorded for the Dsl Gen Fuel Oil Day Tks 1A1/1A2 on Weekly Instrument Channel Checks Data Sheet page 1 of 4 is below the acceptance value Evaluator Note:

Level on data sheet is 5.4 ft. Acceptance Criteria is 6.4 - 7.8 feet UNSAT value is marked and noted on the SP. The examinee will be using this information later in evaluation of TS Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:2 Critical NO Review SP-87-151 Weekly Instrument Channel Checks, Attachment A Data Sheet Standard:

Identify that the acceptance criteria for the Diesel Generator A Fuel Oil Day Tank Volume is marked correctly as UNSAT.

Evaluator Note:

Level on data sheet is 5.4 ft. Acceptance Criteria is > 5.5 ft and Annunciator 47093-C, Diesel Gen A Fuel Oil Level Abnormal Clear.

OSP-DGM-001A acceptance criteria for SR-3.8.1.4 Verify day tanks for each DG contain 1000 gal of fuel oil. - Acceptance criteria: level > 5.5 ft and Annunciator 47093-C, Diesel Gen A Fuel Oil Level Abnormal Clear.

Level of > 5.5ft ensures greater than 1000gallons.

Item will be marked as UNSAT in the SP. Identify the associated TS later in the JPM is the critical step Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 14 Performance Step:3 Critical YES Review SP-87-151, Weekly Instrument Channel Checks, Attachment A Standard:

Identify that value recorded for the Diesel Gen Fuel Oil Storage Tank 1A on Weekly Instrument Channel Checks Data Sheet page 1 of 4 is incorrect by reviewing Attachment A of SP-87-151.

Evaluator Note:

The fuel oil tank level is from the Attachment B volume for the Heise gauge reading Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:4 Critical YES Review Attachment A of SP-87-151 Standard:

Using Table 1 in Attachment A identify that value for the Diesel Gen Fuel Oil Storage Tank 1A is 33,445 gallons Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:5 Critical YES Review Attachment A of SP-87-151 Standard:

Identify that the total volume for the FOST is < 33,450 gallons and that have to ENSURE that fuel is ordered so 33,450 gallons are available to run monthly diesel test Evaluator Cue:

If the examinee states that fuel oil is required to be order then acknowledge the ordering fuel oil Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 14 Performance Step:6 Critical NO Review Attachment A of SP-87-151 Standard:

Identify that value for the Diesel Gen Fuel Oil Storage Tank 1A is still above the acceptance level listed in Attachment A and Weekly Instrument Channel Check Data sheet level of 33,080 gallons.

Level from Attachment A Table A 33,445 gallons Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 14 Performance Step:7 Critical YES Review Technical Specification for Diesel Generator Day Tank < 5.5 ft Standard:

(c)

Item with (C) is the critical part of the standard Identify SR 3.8.1.4 NOT MET Identify SR 3.8.1.6 NOT Met Identify LCO 3.8.1 NOT MET Identify need to enter LCO3.8.1 Condition B for One EDG Inoperable with the following required actions and completion times:

Required Action Completion Time B.1 Perform 3.8.1.1 for the offsite circuit(s) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND B.2 Declare required feature(s) supported by the inoperable DG inoperable when its redundant feature(s) is inoperable 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)

AND B.3.1 Determine OPERABLE DG is not inoperable due to common failure 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR B.3.2 Perform SR 3.8.1.2 for OPERABLE DG 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND B.4 Restore DG to OPERABLE status 7 days Evaluator Note:

SR-3.8.1.4 Verify day tanks for each DG contain 1000 gal of fuel oil SR-3.8.1.6 Verify each fuel oil transfer system operates to automatically transfer fuel oil from the storage tank to the associated day tanks.

LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
b. Two diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 14 Performance Step:8 Critical NO Complete review of SP-87-151 Weekly Instrument Channel Checks Data Sheet Standard:

Identify NO other conditions that fail to meet its acceptance criteria Evaluator Cue:

If the examinee asks for the completed reactivity plaque card then provide them with the card attached to this JPM Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

The examinee has identified the actions associated with not meeting LCO 3.8.1, and ensured that fuel oil needs to ordered.

Stop Time:

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 14 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

SO-119-JP011, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 14 TURNOVER SHEET INITIAL CONDITIONS:

The unit is at 100% Rated Thermal Power o

Current burnup for the core is 15,000 MWD/MTU o

Current RCS boron is 400 ppm.

o The Boric Acid Storage Tanks are at 8.0 weight% boric acid.

o All automatic systems are operating at program values.

o PPCS is currently unavailable.

SP-87-151, Weekly Instrument Channel Checks, has just been completed.

Annunciator 47093-C, Diesel Gen A Fuel Oil Level Abnormal is LIT - Crew is performing actions per the ARP. - Maintenance has reported that automatic make up to the day tank is NOT working, however manual makeup to the day tank is available. I&C has determined that the setpoint for maintaining day tank level were set too low INITIATING CUES (IF APPLICABLE):

As the supervisor review the complete SP-87-151

SO-119-JP011, Rev. B Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 14 REACTIVTY PLACARD INFORMATION GENERAL INFORMATION Power Defect -26.00 pcm/%pwr MTC

_ -33.0 _ pcm/ºF DBW

_-7.35 _ pcm/ppm DILUTE 1 PPM 84.0 gallons water/ppm

% pwr _ 295 gallons water/%pwr

ºF

_ 363 gallons water/ºF BORATE 1 PPM _2.52 gallons boron/ppm

% pwr _8.85 _ gallons boron/%pwr

ºF 10.9 gallons boron/ºF DATE __Todays Date___________

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 14 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Nichols 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

SO-119-JP011 Rev B, Review SP-87-151, Faulted DG A Fuel Oil Level Retention: Life of plant insurance policy + 10 years KPS-JPMSROA2-L-SRO-A-01212011-097 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 14 Historical Record:

Rev A Original Rev B Fixed Typo on directions for filling out initial documentation.

Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Equipment Tagging (Faulted)

JPM NUMBER:

RO-119-JP121 REV.

D RELATED PRA INFORMATION:

N/A TASK NUMBER(S) /

TASK TITLE(S):

1190150301 / Perform requirements of Tag Out Control 1190120302 / Process a Tagout (SRO)

K/A NUMBERS:

2.2.13 - Knowledge of tagging and clearance procedures. IMP 4.1 / 4.3 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

X Simulator:

X Other:

Lab:

Time for Completion:

30 Minutes Time Critical:

No Alternate Path / Faulted:

Yes TASK APPLICABILITY:

RO / SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 10 JPM Number:

RO-119-JP121 JPM

Title:

Equipment Tagging (Faulted)

Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 10 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Maintenance is preparing to repair or replace the Control Room Hot Water Heating Pump.

You have been provided with a copy of Work Order KW100368717 for 22-HS-MECH-00005, Training Module for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005, which addresses this work.

INITIATING CUES (IF APPLICABLE):

Verify the tagout for accuracy.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

Do you have any questions before we begin? - Answer applicable questions.

Lets Begin

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 10 JPM PERFORMANCE INFORMATION Required Materials:

Work Order KW100368717 Training Module for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005 Tagout Preparation and Review Checklist Highlight the drawings using the following convention Red for boundary items Yellow for Caution Orange for component being worked on General

References:

OP-AA-200, Equipment Clearance, Rev. 10 N-ACC-25-CL, Control Room Air Conditioning System Prestartup Checklist, Rev. 35 Task Standards:

Inadequate clearance point(s) identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 10 Performance Step: 1 Critical No OP-AA-200, Step 3.2.3.c REVIEW the completed Tagging Record for accuracy and completeness, referencing controlled documents as necessary. The Reviewing SRO or designee shall:

ENSURE that the tag-out is adequate for the tasks and hazards involved.

ENSURE that the proper sequence of component alignment and tag placement is specified.

ENSURE that the tag-out is in compliance with Technical Specification and regulatory requirements including maintaining redundant equipment operable.

ENSURE that the appropriate entries have been made in the comment section of the Tagging Record.

DETERMINE if support is required from Maintenance Personnel to execute the tag-out.

Standard:

Refer to documents as necessary to:

ENSURE that the tag-out is adequate for the tasks and hazards involved.

ENSURE that the proper sequence of component alignment and tag placement is specified.

ENSURE that the appropriate entries have been made in the comment section of the Tagging Record.

NOTE:

Steps 3.2.3.d and 3.2.3.e provide direction for review of work package, and use of human performance toll checklists during the approval process, respectively.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 10 Performance Step: 2 Critical Yes OP-AA-200, Step 3.2.3.f IF the review indicates a deficiency, THEN the SRO or designee shall NOTIFY the preparer and RESOLVE the problem OR RETURN the tag-out to the preparer for resolution.

Standard:

IDENTIFY one of the following conditions to correct the tagging boundary:

a. HS-1126, Shift Manager Office RHT Coil Hot WTR Return, must be added to the Tagging Record in CLOSED position.

OR

b. HS-1127, CR & SM Office Reheat Hot Water Return, and HS-1128, Control Room Hot Wtr Recirc Isol, must be added to the Tagging Record in CLOSED position.

Evaluator Cue:

If asked, only interested in the hanging portion of the procedure Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the Tagging Record has been returned, This completes this JPM.

Stop Time:

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 10 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

RO-119-JP121 Work Order.pdf RO-119-JP121 Tagout.pdf Tagout Checklist.doc

RO-119-JP121, Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 10 TURNOVER SHEET INITIAL CONDITIONS:

Maintenance is preparing to repair or replace the Control Room Hot Water Heating Pump.

You have been provided with a copy of Work Order KW100368717 for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005, which address this work.

INITIATING CUES (IF APPLICABLE):

Verify the tagout for accuracy.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 10 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Nichols 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 10 Historical Record:

Revision B -

Removed the reference to work on BT-32A.

Revision C -

Added RO Task and Task Number Corrected JPM IMP values to NUREG-1122, Rev. 2 Supplement 1 values.

Simplified Initial Conditions and Initiating Cue to reflect those associated with the task.

General Reference procedure OP-KW-200-1001 is superseded by OP-AA-200, and has been deleted as a reference.

Added the applicable conditions the reviewing person is directed to review in accordance with AOP-AA-200.

Added additional isolation points which are also acceptable for isolating the work boundary. These include both of the return and recirculation isolation valves downstream of HS-1126 and HS-1124.Removed the statement that allowed the use of webtop.

Revision D Updated directions for highlighting the drawings Red for boundary, orange for component being worked on, yellow for caution.

Incorporated NRC comment to have Performance Steps reflect steps of OP-AA-200: Steps 3.2.3.c and 3.2.3.f are the appropriate functional Performance Steps.

OP-AA-200 revised to Rev. 10 Changed Performance Step 1 to reflect actions of Step 3.2.3.c Added NOTE to Performance Step 1 to indicate what the intervening steps 3.2.3.d and 3.2.3.e direct.

Changed Performance Step 2 to reflect actions of Step 3.2.3.f Added cue to step 2 for only interested in hanging portion of the procedure Changed Tagout Sheet to show status 42

Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 10 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Equipment Tagging (Faulted)

JPM NUMBER:

RO-119-JP121 REV.

D RELATED PRA INFORMATION:

N/A TASK NUMBER(S) /

TASK TITLE(S):

1190150301 / Perform requirements of Tag Out Control 1190120302 / Process a Tagout (SRO)

K/A NUMBERS:

2.2.13 - Knowledge of tagging and clearance procedures. IMP 4.1 / 4.3 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

X Simulator:

X Other:

Lab:

Time for Completion:

30 Minutes Time Critical:

No Alternate Path / Faulted:

Yes TASK APPLICABILITY:

RO / SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 10 JPM Number:

RO-119-JP121 JPM

Title:

Equipment Tagging (Faulted)

Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 10 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

Maintenance is preparing to repair or replace the Control Room Hot Water Heating Pump.

You have been provided with a copy of Work Order KW100368717 for 22-HS-MECH-00005, Training Module for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005, which addresses this work.

INITIATING CUES (IF APPLICABLE):

Verify the tagout for accuracy.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK.

Do you have any questions before we begin? - Answer applicable questions.

Lets Begin

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 10 JPM PERFORMANCE INFORMATION Required Materials:

Work Order KW100368717 Training Module for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005 Tagout Preparation and Review Checklist Highlight the drawings using the following convention Red for boundary items Yellow for Caution Orange for component being worked on General

References:

OP-AA-200, Equipment Clearance, Rev. 10 N-ACC-25-CL, Control Room Air Conditioning System Prestartup Checklist, Rev. 35 Task Standards:

Inadequate clearance point(s) identified.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 10 Performance Step: 1 Critical No OP-AA-200, Step 3.2.3.c REVIEW the completed Tagging Record for accuracy and completeness, referencing controlled documents as necessary. The Reviewing SRO or designee shall:

ENSURE that the tag-out is adequate for the tasks and hazards involved.

ENSURE that the proper sequence of component alignment and tag placement is specified.

ENSURE that the tag-out is in compliance with Technical Specification and regulatory requirements including maintaining redundant equipment operable.

ENSURE that the appropriate entries have been made in the comment section of the Tagging Record.

DETERMINE if support is required from Maintenance Personnel to execute the tag-out.

Standard:

Refer to documents as necessary to:

ENSURE that the tag-out is adequate for the tasks and hazards involved.

ENSURE that the proper sequence of component alignment and tag placement is specified.

ENSURE that the appropriate entries have been made in the comment section of the Tagging Record.

NOTE:

Steps 3.2.3.d and 3.2.3.e provide direction for review of work package, and use of human performance toll checklists during the approval process, respectively.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 10 Performance Step: 2 Critical Yes OP-AA-200, Step 3.2.3.f IF the review indicates a deficiency, THEN the SRO or designee shall NOTIFY the preparer and RESOLVE the problem OR RETURN the tag-out to the preparer for resolution.

Standard:

IDENTIFY one of the following conditions to correct the tagging boundary:

a. HS-1126, Shift Manager Office RHT Coil Hot WTR Return, must be added to the Tagging Record in CLOSED position.

OR

b. HS-1127, CR & SM Office Reheat Hot Water Return, and HS-1128, Control Room Hot Wtr Recirc Isol, must be added to the Tagging Record in CLOSED position.

Evaluator Cue:

If asked, only interested in the hanging portion of the procedure Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the Tagging Record has been returned, This completes this JPM.

Stop Time:

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 10 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

RO-119-JP121 Work Order.pdf RO-119-JP121 Tagout.pdf Tagout Checklist.doc

RO-119-JP121, Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 10 TURNOVER SHEET INITIAL CONDITIONS:

Maintenance is preparing to repair or replace the Control Room Hot Water Heating Pump.

You have been provided with a copy of Work Order KW100368717 for 22-HS-MECH-00005, and Drawings for 22-HS-MECH-00005, which address this work.

INITIATING CUES (IF APPLICABLE):

Verify the tagout for accuracy.

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 10 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Nichols 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

RO-119-JP121, Equipment Tagging (Faulted), Rev. D Retention: Life of plant insurance policy + 10 years KPS-JPMROA3/JPMSROA3-L-RO/SRO-01212011-099 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 10 Historical Record:

Revision B -

Removed the reference to work on BT-32A.

Revision C -

Added RO Task and Task Number Corrected JPM IMP values to NUREG-1122, Rev. 2 Supplement 1 values.

Simplified Initial Conditions and Initiating Cue to reflect those associated with the task.

General Reference procedure OP-KW-200-1001 is superseded by OP-AA-200, and has been deleted as a reference.

Added the applicable conditions the reviewing person is directed to review in accordance with AOP-AA-200.

Added additional isolation points which are also acceptable for isolating the work boundary. These include both of the return and recirculation isolation valves downstream of HS-1126 and HS-1124.Removed the statement that allowed the use of webtop.

Revision D Updated directions for highlighting the drawings Red for boundary, orange for component being worked on, yellow for caution.

Incorporated NRC comment to have Performance Steps reflect steps of OP-AA-200: Steps 3.2.3.c and 3.2.3.f are the appropriate functional Performance Steps.

OP-AA-200 revised to Rev. 10 Changed Performance Step 1 to reflect actions of Step 3.2.3.c Added NOTE to Performance Step 1 to indicate what the intervening steps 3.2.3.d and 3.2.3.e direct.

Changed Performance Step 2 to reflect actions of Step 3.2.3.f Added cue to step 2 for only interested in hanging portion of the procedure Changed Tagout Sheet to show status 42

Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 12 JOB PERFORMANCE MEASURE (JPM)

SITE:

Kewaunee Power Station JPM TITLE:

Review Fuel Assembly Handling Deviation Report JPM NUMBER:

SO-119-JP311 REV.

C RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

1190310302 / Supervise Refueling operations K/A NUMBERS:

2.1.42 RO Imp /SRO Imp 2.5 / 3.4 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

Other:

X Classroom Lab:

Time for Completion:

15 Minutes Time Critical:

NO Alternate Path / Faulted:

Yes TASK APPLICABILITY:

SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 12 JPM Number:

SO-119-JP311 JPM

Title:

Review Fuel Assembly Handling Deviation Report Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 12 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS:

You are the Refueling SRO.

Fuel movement is in progress.

A condition has occurred such that the fuel assembly J53 assigned to core location G-12 is required to be moved to a temporary storage location at core location E-12.

A qualified fuel Handler is stationed at the proposed storage location NF-KW-RRF-014 ATTACHMENT C, Fuel Assembly Handling Deviation Report (FAHDR), has been created to document this change in the Fuel Assembly Movement Sequence (FAMS).

THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS JPM IS NOT TIME CRITICAL.

INITIATING CUES (IF APPLICABLE):

You have been asked to review the FAHDR allowing fuel assembly J53 to be moved to core location E-12 for approval per NF-KW-RRF-014, step 5.1.8.b through 5.1.8.e.

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 12 JPM PERFORMANCE INFORMATION Required Materials:

Marked up page from FAMS showing previous fuel assembly movement and the next set of movements.

FAHDR showing movement of assembly to Temporary Storage location.

CORE Layout with identified fuel assemblies Marked up NF-KW-RRF-014 General

References:

GNP-02.07.01, Refueling Operations - Logkeeping Watchstanding, and Shift Turnover, Rev. 3; NF-KW-RRF-014, Fuel Movement During a Refueling Outage, Rev. 7 RE-24, Special Nuclear Materials Control, Rev. 22 NAD-02.07, Kewaunee Refueling Operations, Rev 7 Task Standards:

SRO denies approval of FAHDR due to location at core baffle with less than two open spaces between temporary storage location and core assemblies, and less than one open location between the core and the stored assembly.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 12 Performance Step: 1 Critical No NF-KW-RRF-014, Step 5.1.8.b.

IF deviations from the sequence listed in the FAMS are necessary, THEN ENSURE the following conditions are satisfied:

The deviation does NOT violate Technical Specification 4.3, Fuel Storage, requirements.

Standard:

Determine the requirements of Technical Specification 4.3 are met.

Evaluator Note:

Technical Specification 4.3 relates to new and spent fuel storage. The TS applies to the SFP spent fuel storage racks, spent fuel pool drainage, and capacity.

Evaluator Cue:

If asked about Step 5.1.8.a and the Westinghouse Field Specification F-5 requirements, You and the Reactor Engineer have reviewed the F-5 requirements and determined the move is not prohibited by any of these requirements.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 12 Performance Step: 2 Critical Yes NF-KW-RRF-014, Step 5.1.8.c.

IF deviations from the sequence listed in the FAMS are necessary, THEN VERIFY the following conditions are satisfied:

Deviations to temporary locations meet the guidelines of Steps 4.26 and 4.27.

Standard:

Reviews the guidelines of Steps 4.26 and 4.27 Determine the requirements of 4.26 are met.

Determine the requirements of 4.27 are NOT met since the assembly is being stored in a baffle location, with NO open location existing between the temporary storage location and the fuel assemblies already in the core.

Evaluator Note:

The P&Ls read:

4.26 Irradiated nuclear fuel and inserts shall only be permanently stored in the reactor core or spent fuel pool racks. The following guidelines shall be adhered to when temporarily storing irradiated fuel and inserts:

Temporary storage is allowed only when the fuel handling crew is on station at the storage location Temporary storage locations include the manipulator crane, SFP bridge crane, RCC change fixture, upender, and new fuel elevator 4.27 Temporary storage of assemblies in baffle locations is permissible if NO stored assembly is face-adjacent to any other stored assembly and there are at least two open locations between the stored assembly and the core assemblies. At the core periphery, at least one open location shall be maintained between the core and any stored baffle assembly.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 12 Performance Step: 3 Critical Yes NF-KW-RRF-014, Step 5.1.8.d.

IF deviations from the sequence listed in the FAMS are necessary, THEN VERIFY the following conditions are satisfied:

The deviation is approved by the RXE and Refueling SRO (approval may be verbal to facilitate fuel movement but must be initialed before the end of the current shift).

Standard:

Approval for the deviation is denied by the Refueling SRO based on not meeting the requirements of P&L 4.27.

Evaluator Note:

This step may not be performed. If the Performer identifies the movement is NOT allowed during Performance Step 2, he/she may refuse approval at that step without proceeding to the next procedure step. That is satisfactory performance for this critical step.

Evaluator Cue:

If Performer does not give reason for not approving FAHDR, then ask followup question, Why have you decided NOT to approve the FAHDR?

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 12 Performance Step: 4 Critical No NF-KW-RRF-014, Step 5.1.8.e.

IF deviations from the sequence listed in the FAMS are necessary, THEN VERIFY the following conditions are satisfied:

The deviation is documented on ATTACHMENT C.

Standard:

None Evaluator Note:

This step may not be performed since the approval should be denied. The deviation is listed on ATTACHMENT C, Fuel Assembly Handling Deviation Report (FAHDR), but should not be approved or performed.

Evaluator Note:

The evaluator may wish to add a follow-up question of where an acceptable temporary storage location would be?

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When decision on FAHDR approval is made: This completes this JPM.

Stop Time:

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 12 During the evaluation, the trainee:

Evaluation Performed the task correctly and in accordance with procedure usage and adherence requirements.

PASS FAIL Never put anyones safety at risk.

PASS FAIL Never put equipment reliability at risk.

PASS FAIL Never violated radiological work practices.

PASS FAIL Demonstrated effective use of event-free human performance tools.

PASS FAIL

SO-119-JP311, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 12 TURNOVER SHEET INITIAL CONDITIONS:

You are the Refueling SRO.

Fuel movement is in progress.

A condition has occurred such that the fuel assembly J53 assigned to core location G-12 is required to be moved to a temporary storage location at core location E-12.

A qualified fuel Handler is stationed at the proposed storage location NF-KW-RRF-014 ATTACHMENT C, Fuel Assembly Handling Deviation Report (FAHDR), has been created to document this change in the Fuel Assembly Movement Sequence (FAMS).

THE STEPS IN THIS JPM SHOULD BE: PERFORMED THIS JPM IS NOT TIME CRITICAL.

INITIATING CUES (IF APPLICABLE):

You have been asked to review the FAHDR allowing fuel assembly J53 to be moved to core location E-12 for approval per NF-KW-RRF-014, step 5.1.8.b through 5.1.8.e.

Inform Evaluation when you are ready to begin.

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 12 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A Are all items on the signature page filled in correctly?

Has the JPM been reviewed and validated by SMEs?

Can the required conditions for the JPM be appropriately established in the simulator if required?

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

Has the completion time been established based on validation data or incumbent experience?

If the task is time critical, is the time critical portion based upon actual task performance requirements?

Is the Licensee level appropriate for the task being evaluated if required?

Is the K/A appropriate to the task and to the licensee level if required?

Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

Are all references identified, current, accurate, and available to the trainee?

Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Nichols 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

SO-119-JP311, Review Fuel Assembly Handling Deviation Report, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA1-L-SRO-A-01212011-098 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 12 Historical Record:

Rev. A:

NEW Rev B Updated to the currently revision level of the procedures.

Updated to the currently template revision level.

Rev C Updated initial conditions to reflect P&L 4.26 for qualified fuel handler stationed Updated for Procedure Revision to NF-KW-RRF-014

Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 19 JOB PERFORMANCE MEASURE (JPM) THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 SITE:

KPS JPM TITLE:

Make Initial Event Notification JPM NUMBER:

AO-119-JP231 REV.

D RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

1190230304 - Demonstrate an understanding of the responsibilities and requirements for the NAO.

1190060301 - Perform emergency notifications from the control room K/A NUMBERS:

2.4.43 RO 2.8/ SRO 3.5 APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

X EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

X Other:

Lab:

Time for Completion:

15 Minutes Time Critical:

Yes Alternate Path / Faulted:

Yes TASK APPLICABILITY:

Additional signatures may be added as needed.

Developed by: Andy Fahrenkrug /s 01/19/2011 Instructor Date Validated by: Andy Fahrenkrug /s 01/19/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Approved by: John Egdorf /s 01/24/2011 Emergency Preparedness Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 19 JPM Number:

AO-119-JP231 JPM

Title:

Make Initial Event Notification Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 19 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

INITIAL CONDITIONS/ INITIATING CUE:

The Shift Manager, acting as Emergency Director, just declared a Site Area Emergency due to a LOCA.

Evaluator Note: Record Time and Date for the classification on the NARS Form as the start time of the JPM The ED/SM informs you that you are the Notifier with an event in progress. Prepare to make the initial event notifications by performing the actions of the Control Room Notifier.

THIS TASK IS TIME CRITICAL INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Do you have any questions before we begin? - Answer applicable questions Lets Begin

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 19 JPM PERFORMANCE INFORMATION Required Materials:

Form EPIPF-AD-07-01 Nuclear Accident Reporting Form (NARS), Rev. 28 Event Notice filled in by ED (Blocks 1-11 plus Approval Signature)

Form EPIPF-AD-07-05, State and County Notification, Rev 4 General

References:

EPIP-AD-07, Emergency Notification, Rev. 57 Task Standards:

Complete event notifications IAW EPIP-AD-07 with initial State & County contact made within 15 minutes of the event declaration. County contact is satisfied when either the Kewaunee County Sheriff Dispatch or the Manitowoc County Sheriff is called.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below.

[OTH 12765]

NOTE: Critical steps are marked with a Yes below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Evaluator NOTE: A blank NARS form (Form EPIPF-AD-07-01) has been provided if it is desired to transcribe the Performers message to the State and County personnel.

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 19 Evaluator Cue: 9 minutes after classification time recorded on the NARS form record time for ED signature

1. State the following I want you to read the NARS form to me then begin Notifications
2. Hand the NARS form to the performer
3. Answer any questions that the performer may have on the entries.

Performance Step: 1 Critical: No EPIP-AD-07, Step 5.2.2 Notifications are performed per EPIPF-AD-07-05, State and County Notifications.

Standard:

Obtain a copy of Form EPIPF-AD-07-05.

Evaluator Note:

Reference to EPIP-AD-07 is NOT required. The individual is expected to follow the guidance of Form EPIPF-AD-07-05, State And County Notification.

The form is normally contained in the Control Room Notifier notebook at the notification desk. Additional copies of this form are located in the lower left drawer at the notifier desk. The Performer will be expected to obtain the form from one of these locations.

Evaluate Note/Cue:

The performer may ask the following question referring to the performance of steps in EPIP-AD-07 if this occurs then State the following for questions

1. SAS notification? - Response SAS has been notified Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 19 Performance Step: 2 Critical: No Form EPIPF-AD-07-05, Step 1.

Verify Form EPIPF-AD-07-01, Event Notice - Nuclear Accident Reporting System Form (NARS), received from the SM/ED or ERM has their approval signature, time and date.

Standard:

Verify Approval Signature blank between Blocks 11 and 12 completed with signature date and time.

Check the blank next to step 1 on Form EPIPF-AD-07-05.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: No Form EPIPF-AD-07-05, Step 2.

Complete Block 12 of Form EPIPF-AD-07-01, Event Notice-Nuclear Accident Reporting System Form (NARS).

Standard:

Operator prints name in block 12, Emergency Communicator.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 4 Critical: No Form EPIPF-AD-07-05, Step 3 Pick up the Dial Select phone and verify the line is clear Standard:

Pick up the phone and listen to determine if the line is clear and operating.

Evaluator Note:

The LINE will be dead; it will be unplugged to simulate a dead line.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 19 Performance Step: 5 Critical: No Form EPIPF-AD-07-05, Step 4 WHEN the line is clear, Dial 22 (All Call for agencies to be notified).

a. If the Dial Select system is not operating, THEN go to Step 11 (Using Secondary Method, Commercial Phone)

Standard:

Identify that the Dial Select System is NOT operating and go to step 11.

Evaluator Note:

The LINE will be dead; it will be unplugged to simulate a dead line.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: Yes TIME CRITICAL Time contact State Warning Center I or II 15 minutes from start of JPM Form EPIPF-AD-07-05, Step 11.a IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

AGENCY COMMERCIAL #

State Warning Center I or II 9-1(800) 943-0003 Kewaunee County Sheriff 9-1(920) 388-7108 Manitowoc County Sheriff 9-1(920) 683-4201 Call each applicable agency number in the order shown above Standard:

Call each agency in the proper sequence starting with the State Warning Center.

Evaluator Note:

Have the operator simulate using the phone. Only the first agency called will be completed (Steps 11.c through 11.e), as all others are only a repeat. The State Warning Center must be the agency called first for this to be completed correctly.

Evaluator Cue:

Respond as the agency being called. This is the State Warning Center I.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 19 Performance Step: 7 Critical: NO Form EPIPF-AD-07-05, Step 11.b IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

WHEN the party answers, record the time on Form EPIPF-AD-07-01 (NARS form).

Standard:

When the State Warning Center I answers the operator records the time in the correct blank on EPIPF-AD-07-01.

The time recorded below (and on NARS for by Performer) is within the allowable time for notifications.

Evaluator Note:

Have the operator simulate using the phone. Only the first agency called will be completed (Steps 11.c through 11.e), as all others are only a repeat. The State Warning Center must be the agency called first for this to be completed correctly. Ensure the time is recorded for the State Warning Center.

Record Time contact to State Warning Center is made. _____________

Evaluator Cue:

Respond as the agency being called: This is the State Warning Center I.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 19 Performance Step: 8 Critical: Yes Form EPIPF-AD-07-05, Step 11.c IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

Read the message on Form EPIPF-AD-07-01 text aloud, SLOWLY AND DELIBERATELY, using number and letter designation (Ref: Phonetic Alphabet.).

Standard:

Read text from NARS from Blocks 1 through 12 using the proper number and letter designations.

Evaluator Note:

If the Performer incorrectly reported information in this step, then repeat back of information as provided in Performance Step 12 allows for correction. If the Performer corrects all errors, then Performance Step 11 is performed SATISFACTORY.

Evaluator Cue:

Identify that you are prepared to receive the Kewaunee Nuclear Accident Reporting System (NARS) message.

Record message information such that repeat back can be performed. (See provided form)

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 19 Performance Step: 9 Critical: No Form EPIPF-AD-07-05, Step 11.d IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

Say: agency name (State Warning Center I), please read back this message to verify accuracy.

Standard:

Directs State Warning Center I to read back message and allows time for message to be read.

Evaluator Note:

If the Performer incorrectly reported information in Performance Step 11, then repeat back of information as provided allows for correction. If the Performer corrects all errors, then Performance Step 11 is performed SATISFACTORY.

Evaluator Cue:

When asked to read back this message to verify accuracy, If all Blocks 1 through 12 were correctly read as written, The message has been read back correctly.

If any portion of the message was delivered incorrectly, read back the NARS form as reported including the incorrect information. If Performer identifies and corrects errors, then repeat back corrections. Report that all agencies have been contacted and they have all read back the messages accurately.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 19 Performance Step: 10 Critical: No Form EPIPF-AD-07-05, Step 11.e IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

Say: Relay this information to Emergency Management immediately. Have the appropriate personnel verify this message by placing a return phone call to the Kewaunee Power Station at 920-388-0101.

Standard:

Read the message as stated.

Evaluator Cue:

Acknowledge the message.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: Yes Form EPIPF-AD-07-05, Step 11.f IF any agencies did not respond to the Dial Select, THEN complete the State and County Event Notification using the secondary method, commercial phone.

UNTIL all agencies have been notified, repeat steps a through e.

Standard:

Dials Kewaunee County Sheriff OR Manitowoc County Sheriff AND records time records the time in the correct blank on EPIPF-AD-07-01.

Evaluator Cue:

If Kewaunee County Sheriff called, This is Kewaunee County Sheriff.

Message has been received, repeat back performed and call completed for Kewaunee County Sheriff.

OR If Manitowoc County Sheriff called, This is Manitowoc County Sheriff.

Message has been received, repeat back performed and call completed for Manitowoc County Sheriff.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 19 Terminating Cues:

When Performer contacted the State Warning Center, and either the Kewaunee County Sheriff or Manitowoc County Sheriff, and read information on the NARS Form state This completes the JPM.

Stop Time:

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 19 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

Marked Up Nars Form.pdf

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 19

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 19

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 19 SIMULATOR SET UP:

Simulator Setup Instructions:

1. Unplug the Dial Select Phone cord to simulate a dead line.

AO-119-JP231, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 19 TURNOVER SHEET INITIAL CONDITIONS/ INITIATING CUE:

The Shift Manager, acting as Emergency Director, just declared a Site Area Emergency due to a LOCA The ED/SM informs you that you are the Notifier with an event in progress. Prepare to make the initial event notifications by performing the actions of the Control Room Notifier.

THIS TASK IS TIME CRITICAL

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 19 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Chris Brandt 01/19/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

AO-119-JP231, Make Initial Event Notification, Rev. D THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMROA4-L-RO-A-01212011-101 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 19 of 19 Historical Record:

Rev B:

Changed JPM number from JP23B to JP231 to meet Standards of Training Job Aid 1 for JPM identification. This is an Alternate Path JPM and the last number should be a digit. The normal path using the Dial Select phone should be AO-119-JP23B.

Verified steps updated to latest procedure revision.

Updated steps to ensure Form EPIPF-AD-07-05 actions covered.

Updated steps to ensure all three agencies are contacted as directed.

Added step to notify ED/SM as appropriate ending point.

Rev C.

Verified steps updated to latest procedure revision.

Updated to the current JPM template.

Added security note in the header.

Rev. D Incorporated NRC Comments Removed the plant/event status information from Initiating Cues Added to Task Standard, County contact is satisfied when either the Kewaunee County Sheriff Dispatch or the Manitowoc County Sheriff is called.

Changed the initiating cue to prepare to make initial event notifications Added Cue and Note prior to first step of JPM to direct the administrator to hand NARS form and cue performer to begin notifications 9 minutes after start of JPM. One minute is given to read the NARS form to the performer and for the performer to read the NARS form back to the administrator.

Changed Performance Step 14 to have step satisfied if either the Kewaunee County Sheriff OR the Manitowoc County Sheriff contacted.

Deleted Steps 1-4 and re-numbered replaced with notes Deleted Performance Step 15 concerning report to SM/ED Added Evaluator NOTE prior to Performance Steps that states a blank NARS form is provided for recording information as reported to State Warning Center Added blank NARS to JPM following Performance Steps Changed initial cues to aid in administration Incorporated Evaluator Notes and Cue prior to step 1 into step 1 Made NARS form classification time and date blank

Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 1 of 21 JOB PERFORMANCE MEASURE (JPM)

THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 SITE:

Kewaunee Power Station JPM TITLE:

Determine PAR Change: Wind Shift JPM NUMBER:

SO-119-JP05E REV.

C RELATED PRA INFORMATION:

None TASK NUMBER(S) /

TASK TITLE(S):

1190050502 Provide Off-Site authorities with Protective Action Recommendations K/A NUMBERS:

2.4.29 - Knowledge of the Emergency Plan (CFR 41.10/43.5/45.11 SRO 4.4) 2.4.44 Knowledge of emergency plan protective action recommendations (CFR 41.10/41.12/43.5/45.11 SRO 4.4)

APPLICABLE METHOD OF TESTING:

Discussion:

Simulate/walkthrough:

Perform:

x EVALUATION LOCATION:

In-Plant:

Control Room:

Simulator:

x Other:

Lab:

Time for Completion:

30 Minutes Time Critical:

Yes Alternate Path /

Faulted:

NO TASK APPLICABILITY:

SRO Additional signatures may be added as needed.

Developed by: Andrew Fahrenkrug /s 01/18/2011 Instructor Date Validated by: Andrew Fahrenkrug /s 01/18/2011 Validation Instructor (See JPM Validation Checklist, Attachment 1)

Date Reviewed by: John Egdorf /s 01/24/2011 Emergency Preparedness Date Approved by: Randy Hastings /s 01/24/2011 Training Supervisor Date Approved by: Mark Goolsbey /s 01/25/2011 Facility Representative Date

Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 2 of 21 JPM Number:

SO-119-JP05E Rev C JPM

Title:

Determine PAR Change: Wind Shift, Rev C Examinee:

Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS:

SAT:

UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 3 of 21 JPM BRIEFING/TURNOVER Read to Examinee:

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

AOP and EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

1. Human Performance attributes should be visible. The student may use STAR and or request Peer Checks.
2. If peer checks are requested, the Instructor should reply - Peer Check Acknowledged. The instructor will acknowledge use of the human performance tool and not validate the proper component manipulation.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 4 of 21 EVALUATOR NOTE: Fill in notification time on NARS form giving to the performer as 7 minutes prior to JPM start time INITIAL CONDITIONS:

  • THIS IS A DRILL*

You are the Shift Manager/Emergency Director A General Emergency FG1 was declared 20 minutes ago and notifications were completed 7 minutes ago.

Current status of the plant:

SG A is Faulted - SG A PORV 3A has failed OPEN SG A is Ruptured - The SG A tube rupture has resulted in ECCS actuation A common failure in the Safety Injection Pumps wiring has resulted in the tripping of both Safety Injection Pumps Core Exit Thermocouple temperatures are 720ºF and rising Total elapsed time from the beginning event (starting with the Reactor Trip) has been 32 minutes Notifier is still in the Control Room As the Shift Manager/Emergency Director in the Control Room you are implementing Emergency Plan Procedures for the given conditions and any additional reports up to and including completion of the NARS form and directing notification if required.

Provide the student at this time with the completed NARS form and marked copy of Form EPIPF-CR-01-01 After the student has had ample time to review the completed NARS form and marked up EPIP, and gain understanding of the initial conditions then give the initiating CUE Do you have any questions on the initial conditions before we begin? - Answer applicable questions This is a TIME CRITICAL JPM INITIATING CUES (IF APPLICABLE):

The STA has reported the wind has just suddenly shifted INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK Lets Begin

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 5 of 21 JPM PERFORMANCE INFORMATION Required Materials:

EPIP-AD-19 Rev. 28, Determining Protective Action Recommendations EPIP-AD-02 Rev. 46, Emergency Class Determination Form EPIPF-AD-07-01 Rev 31, Event Notice-NARS Form Form EPIPF-CR-01-01 Rev. 9, EMERGENCY DIRECTOR (CR) CHECKLIST Emergency Action Level Matrix Rev 7 KW-PLAN-000-EAL Rev 6, Kewaunee Power Station Emergency Action Level Technical Bases Document General

References:

EPIP-CR-01 Rev 5, Control Room Emergency Response.

Emergency Action Level Matrix Rev 7 EPIP-AD-02 Rev. 46 Emergency Class Determination EPIP-AD-19 Rev. 28, Determining Protective Action Recommendations EPIP-AD-07 Rev. 57, Emergency Notifications Form EPIPF-AD-07-01 Rev 29, Event Notice-NARS Form Form EPIPF-CR-01-01 Rev. 6, EMERGENCY DIRECTOR (CR) CHECKLIST DNAP-2605 Rev 10, Emergency Preparedness Performance Indicators KW-PLAN-000-EAL Rev 6, Kewaunee Power Station Emergency Action Level Technical Bases Document Task Standards:

Timely and accurate completion of EPIPF-AD-07-01 for PAR Change due to a wind shift Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Review GNP-05.16.06, ATTACHMENT A for Time Dependent Operator Actions. If the JPM addresses one of these tasks and the JPM is determined to be time critical or contain time critical performance steps, then GNP-05.16.06 will be included in the General References below. [OTH 12765]

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

NOTE: Completed EPIPF-AD-07-01 forms are provided as a KEY

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 6 of 21 Performance Step: 1 Critical YES Examinee recognizes that a new EPIPF-AD-07-01 is required.

Standard:

Examinee recognizes that a new EPIPF-AD-07-01 is required.

Evaluator Cue:

None Evaluator Note:

EPIPF-AD-07-01, EPIP-CR-01, And EPIP-AD-07 all contain guidance that a new EPIPF-AD-07-01 is required for a changed in wind direction which is a PAR Change.

EPIPF-CR-01-01 Section 2, Ongoing actions with command and control in the control room, gives direction on monitoring EALS and PARS. Provides direction for a new NARS form with a PAR Change.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 2 Critical: No Sentence above Box 1 circle CR in the sentence: This is the Kewaunee Power Station calling from the (circle one) CR/TSC/EOF. An incident has occurred at our facility.

Standard:

Circle CR in the sentence: This is the Kewaunee Power Station calling from the (circle one) CR/TSC/EOF. An incident has occurred at our facility.

Evaluator Note:

This IS NOT graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 3 Critical: No Box 1: Reason For Call: Check box for PAR Change Standard:

Box 1: Check box for PAR Change Evaluator Note:

Box 1 IS NOT graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 7 of 21 Performance Step:4 Critical: Yes Box 2: Status: Check Box for [B] Drill/Exercise Standard: (c) Box 2: Box checked for [B] Drill/Exercise Evaluator Note:

Box 2 IS graded during EP exercises and must be marked [B]. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:5 Critical: No Box 3: Station/Affected Unit: Check Box for Kewaunee Standard:

Box 3: Check Box for Kewaunee Evaluator Note:

Box 3 IS NOT graded during EP exercises. Reference DNAP-2605. Box 3 is pre-checked on Form Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 6 Critical: Yes Box 4: Onsite Classification: Check box for General Emergency Standard: (c)

Box 4: Check box for General Emergency Evaluator Note:

Box 4 IS graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 8 of 21 Performance Step: 7 Critical: YES Box 5: Time & Date of Classification / PAR Change / Termination

1) Check Box [B] PAR Change
2) Complete PAR Change Time and Date Standard:

(c)

Box 5: Time & Date of Classification / PAR Change / Termination

1) Check Box [B] PAR Change
2) Complete PAR Change Time and Date Time and should match date and time of JPM being administered Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step:8 Critical: Yes Box 6: Release Status: Check box [B] OCCURRING Standard: (c) Box 6: Check box [B] OCCURRING Evaluator Note:

Box 6 IS graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 9 Critical: No Box 7: Type of Release: Check box [B] Airborne Standard:

Box 7: Check box [B] Airborne Evaluator Note:

Box 7 IS NOT graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 9 of 21 Performance Step:10 Critical: NO BOX 8: Wind Direction:

1) Enter Wind Direction: 56
2) Circle Downwind Sectors: K L M N Standard:

(c)

BOX 8: Wind Direction:

1) Enter Wind Direction: 56 degrees
2) Circle Downwind Sector: K L M N Circled Evaluator Cue:

IF asked primary 10-meter MET DATA is functioning normal Evaluator Note:

The student will have to locate the information on PPCS or if the student uses the electronic NARS form this information will be filled in automatically Evaluator Note:

For current Information from a PPCS workstation, go to: Main Menu / EP Menu /

TSC 2 Environmental / Radiation Evaluator Note:

Box 8 wind direction value IS graded during EP exercises. Minor discrepancies in wind speed need not count as a missed notification provided the discrepancy would not result in an incorrect PAR.

Evaluator Note:

Box becomes a critical step if the performer does not use the computer Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 11 Critical: NO Block 9: Wind Speed:

1) MILES/HR - 15
2) Stability Class - Circle E Standard:

(c)

Block 9: Wind Speed:

1) MILES/HR - 15
2) Stability Class - Circle E Evaluator Cue:

IF asked primary 10-meter MET DATA is functioning normal Evaluator Note:

Box 9 wind speed value IS graded during EP exercises. Minor discrepancies in wind speed need not count as a missed notification provided the discrepancy would not result in an incorrect PAR.

Evaluator Note:

Box becomes a critical step if the performer does not use the computer Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 10 of 21 NOTE: The instructions for determining PAR are contained in EPIP-AD-019. For this instance the PAR has not changed completing the NARS form a change in release status Performance Step: 12 Critical: Yes Block 10: Protective Action Recommendations:

1) Check Box [B]
2) On the lines with box [B] complete the PAR Standard:

(c)

(c)

Block 10: Protective Action Recommendations:

1) Check Box [B]
2) The lines associated with box [B] read the following:

EVACUATE ALL SECTORS OUT TO 2 MILES EVACUATE SECTORS K L M N P OUT TO 5 MILES Evaluator Note:

The performer may use EPIP-AD-19 to determine PARS recommendation.

Using either the checklist EPIPF-AD-20-02 or procedure EPIP-AD-19 is acceptable to determine the PARS for this JPM.

Evaluator Note:

For current Information from a PPCS workstation, go to: Main Menu / EP Menu /

TSC 2 Environmental / Radiation Evaluator Note:

All of Box 10 IS graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 11 of 21 Performance Step: 13 Critical NO EPIP-AD-19 for PAR Determination 5.1 Determine a default PAR for the declared emergency classification 5.1.1 Evaluate if Sheltering is preferable to evacuation due to

a. Significant core damage has occurred and
b. A release is in progress and of a known short duration Standard:

Determine that evacuation IS preferable to sheltering due to the absence of BOTH significant core damage AND a release in progress of known short duration Evaluator Cue:

IF asked if there is significant core damage, THEN state There has been no reports from the US, STA or Board Operators indicating significant core damage.

IF asked for R-40 or R-41 Reading, THEN state That R-40 is reading <1R/hr and R-41 is reading <1R/hr and stable.

IF asked for CET, THEN state That CET is 721ºF and slowly rising.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 12 of 21 Performance Step: 14 Critical NO Refer to EPIP-AD-19 for PAR Determination 5.1 Determine a default PAR for the declared emergency classification 5.1.2 Evaluate if Sheltering is preferable to evacuation due to

a. The presence of severe weather
b. Competing disasters or
c. Local physical dangers that impede evacuation Standard:

Determine that evacuation is preferable to sheltering due to the absence of severe weather, competing disasters or local physical dangers that impede evacuation.

Evaluator Cue:

IF asked if there is severe weather, THEN state That there is no severe weather.

IF asked if there are competing disasters, THEN state There are no competing disasters.

IF asked if there are any local physical dangers that have been reported that would impeded evacuation state, THEN state There are no local physical dangers reported that would impede evacuation.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 13 of 21 Performance Step: 15 Critical NO IF evacuation is determined to be preferable to sheltering, THEN use step 5.1.5 to complete form EPIPF-AD-07-01, Event Notice - Nuclear Accident Reporting System Form (NARS), Box 10 Standard:

Determine evacuation IS preferable to sheltering due to the absence of severe weather, competing disasters or local physical dangers that impede evacuation.

Evaluator Cue:

IF asked if there is severe weather, THEN state That there is no severe weather.

IF asked if there are competing disasters, THEN state There are no competing disasters.

IF asked if there are any local physical dangers that have been reported that would impeded evacuation state, THEN state There are no local physical dangers reported that would impede evacuation.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 16 Critical NO EPIP-AD-19 Section 5.15, IF Adverse Meteorology Exist Standard:

Determine that Adverse meteorology DOES NOT Exist.

Evaluator Note:

The examinee can use PPCS screens to determine. The electronic NARS form should automatically determine this Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 14 of 21 Performance Step: 17 Critical YES EPIP-AD-19 Section 5.15, IF Adverse Meteorology DOES NOT Exist then recommend to off-site authorities using form EPIPF-AD-07-01, Event Notice-Nuclear Accident Reporting System Form (NARS),

Box 10 to:

EVACUATE ALL SECTORS OUT TO 2 MILES EVACUATE SECTORS K L M N P OUT TO 5 MILES Standard:

Determine that Adverse meteorology DOES NOT Exist.

Evaluator Note:

This step is the same critical action in filling out box 10 of EPIPF-AD 01, repeated here to show were the examinee gets the information to complete box 10 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 18 Critical: Yes Block 11: ADDITIONAL INFORMATION: IF making a PAR change THEN write NONE PAR CHANGE or applicable information related to the PAR Standard:

(c)

Block 11: ADDITIONAL INFORMATION:

1) NONE PAR CHANGE or applicable information related to the PAR -

Correct as long as no incorrect information.

Evaluator Note:

Box 11 IS graded during EP exercises. There must be a description of the event which accurately describes the event and can be understood by recipient(s).

Reference DNAP-2605.

Wording does not have to exactly match as long as the EVENT and PAR are accurately described.

Performance:

SATISFACTORY UNSATISFACTORY Comments:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 15 of 21 Performance Step: 19 Critical:YES Approval Signature EPIPF-AD-07-01, EVENT NOTICE Sign, Date, Time, and circle emergency director Standard: (c)

1. Sign Approval Signature blank
2. Write current date and time in Date/Time Approved blanks
3. Circle Emergency Director.

Evaluator Note:

The approval signature of the emergency director IS graded during EP exercises. Reference DNAP-2605 Performance:

SATISFACTORY UNSATISFACTORY Comments:

Performance Step: 20 Critical: Yes Time Critical EPIPF CR-01-01, Section 1.3.D Initial Actions A. Direct the Notifier or another to initiate notifications per EPIPF-AD-07, Emergency Notifications, using the completed and approved NARS Form.

Standard: (c)

Give Form EPIPF-AD-07-01 to the notifier and direct to begin notification of State and County within 14 minutes of start of JPM Evaluator:

Record time form given to notifier_______________________

Evaluator:

Record time of contact with State or County if required Evaluator Cue:

Acknowledge direction to perform notification. Repeat the NARS form to the examinee if asked to read the form the examinee.

Evaluator Cue:

If the examine does not complete the NARS form and direct notification within the required time then terminate the JPM by stating this completes the JPM Performance:

SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues:

When the examinee has directed performance of notifications for the PAR change Stop Time:

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 16 of 21 During the evaluation, the trainee:

Performed the task correctly and in accordance with procedure usage and adherence requirements.

Yes No Never put anyones safety at risk.

Yes No Never put equipment reliability at risk.

Yes No Never violated radiological work practices.

Yes No Demonstrated effective use of event-free human performance tools.

Yes No Note: The above information may be used in conjunction with the trainees performance to determine JPM failure if the trainees actions would have endangered the health and safety of the public, plant workers, themselves or damage plant equipment even if all critical tasks are met.

SO-119-JP05E Attachments Rev B.p

SO-119-JP05E, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 17 of 21 SIMULATOR SET UP:

Reset the simulator to any Full power IC Go to RUN Enter the codes in the INSTRUCTOR

SUMMARY

(This can be done manually or with a batch or caep file) This JPM can be run with another JPM in the simulator Allow the simulator to run until wind direction stabilizes at 77º and wind speed is 15 mph.

Snap IC if desired

SO-119-JP05E, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 18 of 21 REV INPUT

SUMMARY

Description Delay Time Ramp Time Event Trigger Severity Or Value Final Value Relative Order MALFUNCTIONS REMOTE FUNCTIONS MT101 M0001A Primary Tower - 60M Wind Speed 00:00:00 00:00:00 None 15 15 preload MT102 M0002A Primary Tower - 60M Wind Dir From 00:00:00 00:00:00 None 56 56 preload MT103 M0003A Primary Tower - 10M Ambient Temp 00:00:00 00:00:00 None 56 56 preload MT104 M0004A Primary Tower - Delta Temp 00:00:00 00:00:00 None 1.05 1.05 preload MT107 M0007A Primary Tower - 10M Sigma 00:00:00 00:00:00 None 3

3 preload MT108 M0008A Primary Tower - 10M Wind Speed 00:00:00 00:00:00 None 15 15 preload MT109 M0009A Primary Tower - 10M Wind Dir From 00:00:00 00:00:00 None 56 56 preload MT121 M0021A Backup Tower - 10M Wind Speed 00:00:00 00:00:00 None 15 15 preload MT122 M0022A Backup Tower - 10M Wind Dir From 00:00:00 00:00:00 None 56 56 preload MT123 M0023A Backup Tower - 10M Ambient Sigma 00:00:00 00:00:00 None 3

3 preload MT124 M0024A Backup Tower - 10M Ambient Temp 00:00:00 00:00:00 None 55 55 preload

SO-119-JP05E, Rev. C THIS JPM HAS SECURITY RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10CFR2.390 Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 19 of 21 TURNOVER SHEET INITIAL CONDITIONS:

  • THIS IS A DRILL*

You are the Shift Manager/Emergency Director A General Emergency FG1 was declared 20 minutes ago and notifications were completed 7 minutes ago.

Current status of the plant:

SG A is Faulted - SG A PORV 3A has failed OPEN SG A is Ruptured - The SG A tube rupture has resulted in ECCS actuation A common failure in the Safety Injection Pumps wiring has resulted in the tripping of both Safety Injection Pumps Core Exit Thermocouple temperatures are 720ºF and rising Total elapsed time from the beginning event (starting with the Reactor Trip) has been 32 minutes Notifier is still in the Control Room As the Shift Manager/Emergency Director in the Control Room you are implementing Emergency Plan Procedures for the given conditions and any additional reports up to and including completion of the NARS form and directing notification if required.

This is a TIME CRITICAL JPM

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 20 of 21 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1.

Are all items on the signature page filled in correctly?

2.

Has the JPM been reviewed and validated by SMEs?

3.

Can the required conditions for the JPM be appropriately established in the simulator if required?

4.

Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

5.

Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

6.

Has the completion time been established based on validation data or incumbent experience?

7.

If the task is time critical, is the time critical portion based upon actual task performance requirements?

8.

Is the Licensee level appropriate for the task being evaluated if required?

9.

Is the K/A appropriate to the task and to the licensee level if required?

10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Mike Nichols 01/18/2011 __________________________

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date

SO-119-JP05E, Determine PAR Change: Wind Shift, Rev. C Retention: Life of plant insurance policy + 10 years KPS-JPMSROA5-L-SRO-A-01212011-096 Retain in: Training Program File JOB-AID 03-007 Job Performance Measure Date: April 2010 Page 21 of 21 Historical Record:

Rev A.

Original Rev B.

Changed name to Par Change for Wind Shift and eliminate change in release status.

Removed steps for NARS form for change in release status Changed initial condition so the initial cue is the STA report Updated Task Standard to reflect removal release status portion of the JPM Updated Termination Criteria for remove o Change of release status Updated Initial Condition Cues to aid in administration Changed Steps 10 and 11 to not critical based on the computer automatically filling in the information.

Becomes critical if the student does not use the computer.